Acessibilidade / Reportar erro

Minimizing flowtime subject to optimal makespan on two identical parallel machines

We consider the problem of scheduling jobs on two parallel identical machines where an optimal schedule is defined as one that gives the smallest total flowtime (the sum of the completion time of all jobs) among the set of schedules with optimal makespan (the completion time of the latest job). Utilizing an existing optimization algorithm for the minimization of makespan, we propose an algorithm to determine optimal schedules for this problem. We empirically show that the proposed algorithm can quickly find optimal schedules for problems containing a large number of jobs.

Parallel machine scheduling; Hierarchical criteria; Flowtime minimization


Sociedade Brasileira de Pesquisa Operacional Rua Mayrink Veiga, 32 - sala 601 - Centro, 20090-050 Rio de Janeiro RJ - Brasil, Tel.: +55 21 2263-0499, Fax: +55 21 2263-0501 - Rio de Janeiro - RJ - Brazil
E-mail: sobrapo@sobrapo.org.br