Acessibilidade / Reportar erro

Advantages, disadvantages and risks in the adoption of design-build contracting method in the Brazilian public sector

ABSTRACT

Objetivo:

This paper aims to identify advantages, disadvantages and risks involved in the adoption of design-build contracting method in the Brazilian public sector.

Design/methodology/approach:

qualitative case study, in which were made documentary and field research in the form of semi-structured interviews. About the documentary and field data was used content analysis and triangulation of sources and collection methods.

Findings:

The theoretical basis of this research lies in the brazilian legislation for contracting works and studies conducted by various authors in which address the advantages of design-build procurement method (a single contract for design and construction) regarding the design-bid-build method used in Brazil, which hires design and construction separately.

Practical implications:

The research identified advantages, disadvantages and risks associated to the adoption of the design-build method , enabling the development of coping strategies if it is deployed.

Originality/value:

managers aware of these aspects could use coping strategies by adopting measures to reduce or eliminate their effects. The results can contribute not only to a possible implantation of the method in contexts even other than the public sector but also to improve the processes regarding the project and execution of works.

Keywords:
project and building; design-build; projects risks; public sector

RESUMO

Objetivo:

identificar as vantagens e desvantagens associadas ao uso do método design-build de contratação, com vistas a uma possível adoção pelo setor público brasileiro.

Método:

estudo de caso de natureza qualitativa, no qual foram realizadas pesquisas documentais e de campo, na forma de entrevistas semiestruturadas. Sobre os dados documentais e de campo foi aplicada análise de conteúdo, bem como triangulação de métodos de coleta e fontes.

Fundamentação teórica:

a fundamentação teórica desta pesquisa reside na legislação brasileira para contratação de obras e estudos realizados por diversos autores nos quais abordam as vantagens do método de contratação design-build (uma única contratação para projeto e construção) em relação ao design-bid-build, método utilizado no Brasil, que contrata projeto e construção separadamente.

Resultados:

foram identificados vantagens, desvantagens e riscos prováveis associados à adoção do design-build, possibilitando a formulação de estratégias de enfrentamento caso venha a ser implantado.

Contribuições:

gestores cientes das vantagens, desvantagens e riscos associados ao design-build podem conceber estratégias de enfrentamento adotando medidas que eliminem ou minimizem seus efeitos. Os resultados podem contribuir não apenas para uma possível implantação do método em contextos inclusive distintos do público, como também para a melhoria dos processos concernentes a projeto e execução de obras.

Palavras-chave:
projeto e construção; design-build; riscos em projetos; setor público

Texto completo disponível apenas em PDF.

Full text available only in PDF format.

REFERÊNCIAS

  • Amaral, A. C. C. (2000). Problemas na execução de obras públicas Recuperado de http://www.conlicitacao.com.br/oquee/artigos/ramos_de_atividade/cintra_do_amaral_2006_09_22.02.php
    » http://www.conlicitacao.com.br/oquee/artigos/ramos_de_atividade/cintra_do_amaral_2006_09_22.02.php
  • Arditi, D., & Lee, D.-E. (2003). Assessing the corporate service quality performance of design-build contractors using quality function deployment. Construction Management and Economics, 21(2), 175-185. doi: 10.1080/0144619032000079716
  • Bardin, L. (2011). Análise de conteúdo São Paulo: Edições 70.
  • Lei n. 8.666, de 21 de junho de 1993 (2004). Dispõe sobre normas de licitações e contratos da administração pública e dá outras providências. São Paulo, SP: Nova Dimensão Jurídica.
  • Chang, A. S., Shen, F.-Y., & Ibbs, W. (2010). Design and construction coordination problems and planning for design-build project new users. Canadian Journal of Civil Engineering, 37(12), 1525-1534. doi: 10.1139/L10-090
    » https://doi.org/10.1139/L10-090
  • Creswell, J. W. (2007). Projeto de pesquisa: métodos qualitativo, quantitativo e misto (2a ed.). Porto Alegre: Artmed.
  • Hale, D. R., Shrestha, P. P., Gibson, G. E., & Migliaccio, G. C. (2009). Empirical comparison of design/build and design/bid/build project delivery methods. Journal of Construction Engineering and Management, 135(7), 579-587. doi: 10.1061/ASCECO.1943-7862.0000017
    » https://doi.org/10.1061/ASCECO.1943-7862.0000017
  • IBGE. (2011). Pesquisa Anual da Indústria da Construção Recuperado de http://biblioteca.ibge.gov.br/colecao_digital_publicacoes_multiplo.php?link=paic&titulo=Pesquisa %20Anual%20da%20Ind%FAstria%20da%20Constru%E7%E3o
    » http://biblioteca.ibge.gov.br/colecao_digital_publicacoes_multiplo.php?link=paic&titulo=Pesquisa %20Anual%20da%20Ind%FAstria%20da%20Constru%E7%E3o
  • Konchar, M., & Sanvido, V. (1998). Comparison of U.S. project delivery systems. Journal of Construction Engineering and Management, 124(6), 435-444. doi: 10.1061/(ASCE)0733-9364(1998)124:6(435)
    » https://doi.org/10.1061/(ASCE)0733-9364(1998)124:6(435)
  • Lam, E. W. M., Chan, A. P. C., & Chan, D. W. M. (2008). Determinants of successful design-build projects. Journal of Construction Engineering and Management, 134(5), 333-341. doi: 10.1061/(ASCE)0733-9364(2008)134:5(333)
    » https://doi.org/10.1061/(ASCE)0733-9364(2008)134:5(333)
  • Markoni, M. A., & Lakatos, E. M. (2009). Fundamentos de metodologia científica (6a ed.). São Paulo: Atlas.
  • Migliaccio, G. C., Gibson, G. E., & O’Connor, J. T. (2009a). Procurement of design-build services: two-phase selection for highway projects. Journal of Management in Engineering, 25(1), 29-39. doi: http://dx.doi.org/10.1061/(ASCE)0742-597X(2009)25:1(29))
    » https://doi.org/10.1061/(ASCE)0742-597X(2009)25:1(29))
  • Migliaccio, G. C., & Shrestha, P. P. (2009b). Analysis of design-build procurement activities durations for highway projects. Proceedings of the ASCE Construction Research Congress, Seattle, WA, USA. doi: 10.1061/41020(339)24
    » https://doi.org/10.1061/41020(339)24
  • Miller, R., & Lessard, D. (2001). Understanding and managing risks in large engineering projects. International Journal of Project Management, 19(8), 437-443.
  • Miller, R., & Hobbs, B. (2005). Governance regimes for large complex projects. Project Management Journal, 36(3), 42-50.
  • Molenaar, K. R., & Songer, A. D. (1998). Model for public sector design-build project selection. Journal of Construction Engineering and Management, 124(6), 467-479. doi: 10.1061/(ASCE)0733-9364(1998)124:6(467)
    » https://doi.org/10.1061/(ASCE)0733-9364(1998)124:6(467)
  • Molenaar, K. R., Songer, A. D., & Barash, M. (1999). Public-sector design/build evolution and performance. Journal of Management in Engineering, 15(2), 54-62.
  • Molenaar, K. R., & Gransberg, D. D. (2001). Design-builder selection for small highway projects. Journal of Management in Engineering, 17(4), 214-223.
  • Oyegoke, A. S., Dickinson, M., Khalfan, M. M. A., Mcdermott, P., & Rowlinson, S. (2009). Construction project procurement routes: an in-depth critique. International Journal of Managing Projects in Business, 2(3), 338-354. doi: 10.1108/17538370910971018
    » https://doi.org/10.1108/17538370910971018
  • Palaneeswaran, E., & Kumaraswamy, M. M. (2000). Contractor selection for design/build projects. Journal of Construction Engineering and Management, 126(5), 331-339. doi: 10.1061/(ASCE)0733-9364(2000)126:5(331)
    » https://doi.org/10.1061/(ASCE)0733-9364(2000)126:5(331)
  • Park, M., Ji, S.-H., Lee, H.-S., & Kim, W. (2009). Strategies for design-build in Korea using system dynamics modeling. Journal of Construction Engineering and Management, 135(11), 1125-1137. doi: 10.1061/(ASCE)CO.1943-7862.0000095
    » https://doi.org/10.1061/(ASCE)CO.1943-7862.0000095
  • Perkins, R. A. (2009). Sources of changes in design-build contracts for a governmental owner. Journal of Construction Engineering and Management, 135(7), 588-593. doi: 10.1061/(ASCE)0733-9364(2009)135:7(588))
    » https://doi.org/10.1061/(ASCE)0733-9364(2009)135:7(588))
  • Project Management Institute. (2008). PMBoK - guia do conjunto de conhecimentos em gerenciamento de projetos (4a ed.). New York: Autor.
  • Puerto, C. L. D., Gransberg, D. D., & Shane, J. S. (2008). Comparative analysis of owner goals for design/build projects. Journal of Management in Engineering, 24(1), 32-39. doi: 10.1061/(ASCE)0742-597X(2008)24:1(32)
    » https://doi.org/10.1061/(ASCE)0742-597X(2008)24:1(32)
  • Rosner, J. W., Thal, Jr., Alfred, E., & West, C. J. (2009). Analysis of the design-build delivery method in air force construction projects. Journal of Construction Engineering and Management, 135(8), 710-717. doi: 10.1061/(ASCE)CO.1943-7862.0000029
    » https://doi.org/10.1061/(ASCE)CO.1943-7862.0000029
  • Songer, A. D. & Molenaar, K. R. (1997). Project characteristics for successful public-sector design-build. Journal of Construction Engineering and Management, 123(1), 34-40. doi: 10.1061/(ASCE)0733-9364(1997)123:1(34))
    » https://doi.org/10.1061/(ASCE)0733-9364(1997)123:1(34))
  • Songer, A. D. & Molenaar, K. R. (1996). Selecting design-build: public and private sector owner attitudes. Journal of Management in Engineering, 12(6), 47-53. doi: 10.1061/(ASCE)0742-597X(1996)12:6(47))
    » https://doi.org/10.1061/(ASCE)0742-597X(1996)12:6(47))
  • Tribunal de Contas da União. (2009). Obras públicas: recomendações básicas para a contratação e fiscalização de obras de edificações públicas (2a ed.). Brasília: SECOB.
  • Yates, J. K. (1995). Use of design/build in E/C industry. Journal of Management in Engineering, 11(6), 33-38.

Publication Dates

  • Publication in this collection
    Jan-Mar 2015

History

  • Received
    23 Sept 2013
  • Accepted
    17 Mar 2015
Fundação Escola de Comércio Álvares Penteado Fundação Escola de Comércio Álvares Penteado, Av. da Liberdade, 532, 01.502-001 , São Paulo, SP, Brasil , (+55 11) 3272-2340 , (+55 11) 3272-2302, (+55 11) 3272-2302 - São Paulo - SP - Brazil
E-mail: rbgn@fecap.br