Acessibilidade / Reportar erro

Numerical simulation of hillside mine waste dump construction

Simulação numérica da construção de pilhas de estéril de mineração dispostas em encostas

In activities involving disposal of mine waste in a dump, it is necessary to carry out a preliminary study of the mechanical behavior of both dump and the foundation materials. Due to the complexity of this problem, numerical techniques are essential for providing an approximate answer to the problem. Thus, the finite element method (FEM) was used to evaluate the stress-strain-strength behavior of a hillside waste dump built on a deformable foundation by the ascending method; the results of which are herein presented. The dump material is considered to be Morh-Coulomb nonlinear elastic perfectly plastic while the foundation material is considered to be linear elastic. The numerical simulation of mine waste dump construction is carried out by the "gravity turn on" technique and the dynamic mesh procedure. Different geometric configurations are analyzed and it is concluded that some requirements established by law should be reviewed and refined.

Mining; waste dump; finite element method


Escola de Minas Rua Carlos Walter Marinho Campos, 57 - Vila Itacolomy, 35400-000 Ouro Preto MG - Brazil, Tel: (55 31) 3551-4730/3559-7408 - Ouro Preto - MG - Brazil
E-mail: editor@rem.com.br