SciELO - Scientific Electronic Library Online

 
vol.31 número3Extended cell-transmission-based evacuation planning in urban areasLogit models for the probability of winning football games índice de autoresíndice de assuntospesquisa de artigos
Home Pagelista alfabética de periódicos  

Serviços Personalizados

Artigo

Indicadores

Links relacionados

  • Não possue artigos similaresSimilares em SciELO

Bookmark


Pesquisa Operacional

versão impressa ISSN 0101-7438

Resumo

PRADENAS, Lorena; CAMPOS, Abel; SALDANA, Jesús  e  PARADA, Victor. Scheduling copper refining and casting operations by means of heuristics for the flexible flow shop problem. Pesqui. Oper. [online]. 2011, vol.31, n.3, pp. 443-457. ISSN 0101-7438.  http://dx.doi.org/10.1590/S0101-74382011000300002.

Management of the operations in a copper smelter is fundamental for optimizing the use of the plant's installed capacity. In the refining and casting stage, the operations are particularly complex due to the metallurgical characteristics of the process. This paper tackles the problem of automatic scheduling of operations in the refining and casting stage of a copper concentrate smelter. The problem is transformed into a flexible flow shop problem and to solve it, an iterative method is proposed that operates in two stages: in the first stage, a sequence of jobs is constructed that configures the lots, and in the second, the constructed solution is improved by means of simulated annealing. Fifteen test problems are used to show that the proposed algorithm improves the makespan by an average of 9.42% and the mean flow time by 12.19% with respect to an existing constructive heuristic.

Palavras-chave : refining and casting; flexible flow shop; simulated annealing.

        · texto em Inglês     · pdf em Inglês