Single |
One |
- |
DP |
Li et al. (2005)[39] LI C-L, VAIRAKTARAKIS GL & LEE C-Y. 2005. Machine scheduling with deliveries to multiple customer locations. European Journal of Operational Research , 164(1):39-51.
|
|
|
|
MIP, B&B |
Armstrong et al. (2008)[2] ARMSTRONG R, GAO S & LEI L. 2008. A zero-inventory production and distribution problem with a fixed customer sequence. Annals of Operations Research , 159(1):395-414.
|
|
|
|
HEU |
Averbakh & Xue (2007)[4] AVERBAKH I & XUE Z. 2007. On-line supply chain scheduling problems with preemption. European Journal of Operational Research , 181:500-504.
|
|
|
|
|
Averbakh (2010)[3] AVERBAKH I. 2010. On-line integrated production-distribution scheduling problems with capacitated deliveries. European Journal of Operational Research , 200:377-384.
|
|
|
|
HEU |
Geismar et al. (2008)[31] GEISMAR HN, LAPORTE G, LEI L & SRISKANDARAJAH C. 2008. The integrated production and transportation scheduling problem for a product with a short life span and non-instantaneous transportation time. INFORMS Journal on Computing , 20(1):21-33.
|
|
Two |
Homogeneous |
HEU |
Dondo et al. (2003)[27] DONDO R, MÉNDEZ CA & CERDÁ J. 2003. An optimal approach to the multiple-depot heterogeneous vehicle routing problem with time window and capacity constraints. Latin American Applied Research , 33:129-134.
|
|
|
Heterogeneous |
HEU+MIP |
Mendez et al. (2005)[41] MÉNDEZ C, BONFILL A, ESPUÑA A & PUIGJANER L. 2006. A rigorous approach to coordinate production and transport scheduling in a multi-site system. In: MARQUARDT W & PANTELIDES C, editors, 16th European Symposium on Computer Aided Process Engineering and 9th International Symposium on Process Systems Engineering, volume 21 of Computer Aided Chemical Engineering , pages 2171-2176. Elsevier.
|
|
|
|
HEU |
Bonfill et al. (2008)[11] BONFILL A, ESPUÑA A & PUIGJANER L. 2008. Decision support framework for coordinated production and transport scheduling in scm. Computers & Chemical Engineering , 32:1206-1224.
|
|
Limited |
Homogeneous |
MIP, HEU |
Mantel & Fontein (1993)[40] MANTEL RJ & FONTEIN M. 1993. A practical solution to a newspaper distribution problem. International Journal of Production Economics , 30:591-599.
|
|
|
|
MIP |
Van Buer et al. (1999)[48] VAN BUER MG, WOODRUFF DL & OLSON RT. 1999. Solving the medium newspaper production/distribution problem. European Journal of Operational Research , 115:237-253.
|
|
|
|
HEU |
Russell et al. (2008)[44] RUSSELL R, CHIANG W & ZEPEDA D. 2008. Integrating multi-product production and distribution in newspaper logistics. Computers & Operations Research , 35:1578-1588.
|
|
|
|
|
Leung & Chen (2013)[37] LEUNG JYT & CHEN Z-L. 2013. Integrated production and distribution with fixed delivery departure dates. Operations Research Letters , 41:290-293.
|
|
Unlimited |
Homogeneous |
HEU |
Hurter & Buer (1996)[33] HURTER AP & VAN BUER MG. 1996. The newspaper productiondistribution problem. Journal of Business Logistics , 17(1):85-107.
|
|
|
Heterogeneous |
HEU |
Chen & Lee (2008)[19] CHEN B & LEE C-Y. 2008. Logistics scheduling with batching and transportation. European Journal of Operational Research , 189:871-876.
|
|
|
Heterogeneous |
HEU |
Wang & Lee (2005)[50] WANG H & LEE C-Y. 2005. Production and transport logistics scheduling with two transport mode choices. Naval Research Logistics , 52:796-809.
|
Single, Flowshop |
Limited |
Homogeneous, |
MIP, HEU |
Bonfill et al. (2008)[11] BONFILL A, ESPUÑA A & PUIGJANER L. 2008. Decision support framework for coordinated production and transport scheduling in scm. Computers & Chemical Engineering , 32:1206-1224.
|
|
|
Heterogeneous |
|
|
Single, Parallel |
One |
- |
HEU |
Chang & Lee (2004)[18] CHANG Y-C & LEE C-Y. 2004. Machine scheduling with job delivery coordination. European Journal of Operational Research , 158(1):470-487.
|
|
Unlimited |
Homogeneous |
HEU |
Chen & Vairaktarakis (2005)[23] CHEN Z-L & VAIRAKTARAKIS GL. 2005. Integrated scheduling of production and distribution operations. Management Science , 51(4):614-628.
|
|
|
|
HEU |
Devapriya (2008)[26] DEVAPRIYA P. 2008. Optimal feet size of an integrated production and distribution scheduling problem for a single perishable product. PhD thesis, Clemson University.
|
Parallel |
Limited |
Homogeneous |
HEU |
Böhnlein et al. (2011)[10] BÖHNLEIN D, SCHWEIGER K & TUMA A. 2011. Multi-agent-based transport planning in the newspaper industry. International Journal of Production Economics, 131:146-157.
|
|
Unlimited |
Homogeneous |
HEU |
Farahani et al. (2012)[29] FARAHANI P, GRUNOW M & GÜNTHER H. 2012. Integrated production and distribution planning for perishable food products. Flexible Services and Manufacturing , 24:28-51.
|
|
Limited |
Heterogeneous |
MIP, HEU |
Ulrich (2013)[47] ULRICH CA. 2013. Integrated machine scheduling and vehicle routing with time windows. European Journal of Operational Research , 227:152-165.
|
Flowshop |
Limited |
Heterogeneous |
MIP, HEU |
Méndez et al. (2006)[41] MÉNDEZ C, BONFILL A, ESPUÑA A & PUIGJANER L. 2006. A rigorous approach to coordinate production and transport scheduling in a multi-site system. In: MARQUARDT W & PANTELIDES C, editors, 16th European Symposium on Computer Aided Process Engineering and 9th International Symposium on Process Systems Engineering, volume 21 of Computer Aided Chemical Engineering , pages 2171-2176. Elsevier.
|
|
Unlimited |
Homogeneous |
HEU |
Li & Vairaktarakis (2007)[39] LI C-L, VAIRAKTARAKIS GL & LEE C-Y. 2005. Machine scheduling with deliveries to multiple customer locations. European Journal of Operational Research , 164(1):39-51.
|
|
|
|
MIP, HEU |
Chiang et al. (2009)[25] CHIANG W, RUSSELL R, XU X & ZEPEDA D. 2009. A simulation/metaheuristic approach to newspaper production and distribution supply chain problems. International Journal of Production Economics , 121:752-767.
|