SciELO - Scientific Electronic Library Online

 
vol.7 issue3Cooperative inter-organizational schedulingA reference model for production management in assembly to order: ato production systems and its multiple applications author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Gestão & Produção

Print version ISSN 0104-530X

Abstract

FILHO, Oscar S. Silva. Sub-optimal sequential strategies for aggregate production planning under uncertainties. Gest. Prod. [online]. 2000, vol.7, n.3, pp. 247-268. ISSN 0104-530X.  http://dx.doi.org/10.1590/S0104-530X2000000300005.

Within a hierarchical decision chain, a major part of problems is dependent on the time component and strongly sensitive to endogenous and exogenous components. These problems can be related to an important class of stochastic optimal control. Difficulties to provide a closed-loop policy for them, lead to look for sub-optimal alternatives. In this paper, four different sub-optimal procedures are investigated in relation to their structural properties. A case study, based on an aggregated production planning problem, is considered with the purpose of comparing the different procedures. The best one is used to provide managerial scenarios about the future use of material resources of the firm.

Keywords : optimal control; dynamic systems; sub-optimal procedures; dynamic programming; production planning.

        · abstract in Portuguese     · text in Portuguese     · pdf in Portuguese