Irizarry, Aknoukh e Meadati (2011)IRIZARRY, J.; AKNOUKH, A.; MEADATI, P. BIM and Concrete Formwork Repository. In: ASC ANNUAL INTERNATIONAL CONFERENCE PROCEEDINGS, 47., Omaha, 2011. Proceeding... 2011. Omaha: ASC, abr. 2011.
|
X |
|
X |
|
|
Repositório de componentes BIM de fôrmas |
Chi, Hampson e Biggs (2012)CHI, S.; HAMPSON, K.; BIGGS, H. Using BIM for Smarter and Safer Scaffolding and Formwork Construction : A Preliminary. In: CIB W099 INTERNATIONAL CONFERENCE ON MODELING AND BUILDING HEALTH AND SAFETY, Singapore, 2012. Proceeding... Singapore: CIB, 2012.
|
X |
|
X |
|
|
Desenvolvimento de componentes BIM para fôrmas |
Turkan et al. (2013) |
X |
|
X |
|
|
Rastreamento automático de estruturas temporárias incluindo fôrmas |
Jiang e Leicht (2014)JIANG, L.; LEICHT, R. M.; KREMER, G. E. O. Eliciting Constructability Knowledge for BIM-enabled Automated, Rule-based Constructability Review: A Case Study of Formwork. In: CONSTRUCTION RESEARCH CONGRESS, Atlanta, 2014. Proceeding... Reston: American Society of Civil Engineers, mai. 2014.
|
X |
|
|
X |
|
Verificação da construtibilidade |
Jiang, Leicht e Kremer (2014)JIANG, L.; LEICHT, R. M.; KREMER, G. E. O. Eliciting Constructability Knowledge for BIM-enabled Automated, Rule-based Constructability Review: A Case Study of Formwork. In: CONSTRUCTION RESEARCH CONGRESS, Atlanta, 2014. Proceeding... Reston: American Society of Civil Engineers, mai. 2014.
|
X |
|
X |
|
|
Verificação da construtibilidade |
Kannan e Santhi (2013)KANNAN, R. M.; SANTHI, H. M. Constructability Assessment of Climbing Formwork Systems Using Building Information Modeling. Procedia Engineering, v. 64, p. 1129-1138, 2013.
|
X |
|
|
X |
|
Verificação da construtibilidade |
Golparvar-Fard, Savarese e Pena-Mora (2010)GOLPARVAR-FARD, M.; SAVARESE, S.; PEÑA-MORA, F. Automated Model-Based Recognition of Progress Using Daily Construction Photographs and IFC-Based 4D Models. In: CONSTRUCTION RESEARCH CONGRESS, Banff, 2010. Proceedings... Reston: American Society of Civil Engineers, 2010.
|
|
X |
X |
|
|
Rastreamento automático do as-built |
Alwisy, Al-Hussein e Al-Jibouri (2012)ALWISY, A.; AL-HUSSEIN, M.; AL-JIBOURI, S. H. BIM Approach for Automated Drafting and Design for Modular Construction Manufacturing. In: INTERNATIONAL CONFERENCE IN COMPUTING IN CIVIL ENGINEERING, 2012, Clearwater. Proceeding... Reston: American Society of Civil Engineers, 2012.
|
|
X |
X |
|
|
Molduras de madeira (wood-framing) |
Kang, Ganapathi e Faghihi (2012)KANG, J.; GANAPATHI, J. L.; FAGHIHI, V. BIM to field: robotic total station and BIM for quality control. In: GUDNASON, G.; SCHERER, R. (Eds.). eWork and eBusiness in Architecture, Engineering and Construction. London: Taylor & Francis Group, 2012.
|
|
X |
|
|
X |
Qualidade do posicionamento de estruturas na obra |
Luth, Schorer e Turkan (2014)LUTH, G. P.; SCHORER, A.; TURKAN, Y. Lessons From Using BIM to Increase Design-Construction Integration. Practice Periodical on Structural Design and Construction, Reston, v. 19, n. 1, p. 103-110, fev. 2014.
|
|
X |
|
X |
|
Desenhos de produção a partir de modelos BIM |
Wang et al. (2015)WANG, W.-C. et al. Integrating Building Information Models With Construction Process Simulations For Project Scheduling Support. Automation in Construction, v. 37, p. 68-80, jan. 2014.
|
|
X |
X |
|
|
Transporte de estruturas temporárias |
|
55% |
45% |
64% |
27% |
9% |
|