Tommelein, Riley e HowellTOMMELEIN, I.; RILEY, D. R.; HOWELL, G. A. Parade Game: impact of work flow variability on trade performance. Journal of Construction Engineering and Management, v. 125, n. 5, p. 304-310, 1999.
|
1999TOMMELEIN, I.; RILEY, D. R.; HOWELL, G. A. Parade Game: impact of work flow variability on trade performance. Journal of Construction Engineering and Management, v. 125, n. 5, p. 304-310, 1999.
|
EUA |
Variability |
Santos, Formoso e TookeySANTOS, A. dos; FORMOSO, C. T.; TOOKEY, F. E. Expanding the Meaning of Standardization With in Construction Processes. The TQM Magazine, v. 14, n. 1, p. 25-33, 2002.
|
2002SANTOS, A. dos; FORMOSO, C. T.; TOOKEY, F. E. Expanding the Meaning of Standardization With in Construction Processes. The TQM Magazine, v. 14, n. 1, p. 25-33, 2002.
|
Brasil/Inglaterra |
Variabilidade |
De Mori e JunglesDE MORI, L. M.; JUNGLES, A. E. Impacto de Interrupções no Processo de Produção de Alvenaria Estrutural Sobre a Produtividade do Trabalho. In: ENCONTRO TECNOLÓGICO DA ENGENHARIA CIVIL E ARQUITETURA, 5., Maringá, 2005. Anais... Maringá, 2005.
|
2005DE MORI, L. M.; JUNGLES, A. E. Impacto de Interrupções no Processo de Produção de Alvenaria Estrutural Sobre a Produtividade do Trabalho. In: ENCONTRO TECNOLÓGICO DA ENGENHARIA CIVIL E ARQUITETURA, 5., Maringá, 2005. Anais... Maringá, 2005.
|
Brasil |
Variabilidade |
CoutoCOUTO, J. P. Influência dos Atrasos na Competitividade da Indústria de Construção Portuguesa: inquérito nacional sobre o incumprimento dos prazos. In: ENCONTRO NACIONAL SOBRE QUALIDADE E INOVAÇÃO NA CONSTRIÇÃO, 2006, Lisboa, Portugal, 2006. Proceedings... Lisboa: LNEC, 2006.
|
2006COUTO, J. P. Influência dos Atrasos na Competitividade da Indústria de Construção Portuguesa: inquérito nacional sobre o incumprimento dos prazos. In: ENCONTRO NACIONAL SOBRE QUALIDADE E INOVAÇÃO NA CONSTRIÇÃO, 2006, Lisboa, Portugal, 2006. Proceedings... Lisboa: LNEC, 2006.
|
Portugal |
Atrasos |
Sambasivan e SoonSAMBASIVAN, M.; SOON, Y. W. Causes and Effects of Delays in Malaysian Construction Industry. International Journal of Project Management, v. 25, p. 517-526, 2007.
|
2007SAMBASIVAN, M.; SOON, Y. W. Causes and Effects of Delays in Malaysian Construction Industry. International Journal of Project Management, v. 25, p. 517-526, 2007.
|
Malásia |
Delay |
OladapoOLADAPO, A. A. A Quantitative Assessment of the Cost and Time Impact of Variation Orders on Construction Projects. Journal of Engineering Design and Technology, v. 5, n. 1, p. 35-48, 2007.
|
2007OLADAPO, A. A. A Quantitative Assessment of the Cost and Time Impact of Variation Orders on Construction Projects. Journal of Engineering Design and Technology, v. 5, n. 1, p. 35-48, 2007.
|
África do Sul |
Variation |
VasconcelosVASCONCELOS, T. M. N. R. F. Building Information Model: avaliação do seu potencial como solução para os principais atrasos e desperdícios na construção portuguesa. Lsiboa, 2010. 116 f. Dissertação (Mestrado em Engenharia Civil) - Faculdade de Ciências e Tecnologia, Universidade Nova de Lisboa, Lisboa, 2010.
|
2010VASCONCELOS, T. M. N. R. F. Building Information Model: avaliação do seu potencial como solução para os principais atrasos e desperdícios na construção portuguesa. Lsiboa, 2010. 116 f. Dissertação (Mestrado em Engenharia Civil) - Faculdade de Ciências e Tecnologia, Universidade Nova de Lisboa, Lisboa, 2010.
|
Portugal |
Atrasos |
Mohammad et al.MOHAMMAD, N. et al. Investigation on the Causes of Variation Orders in the Construction of Building Project: a study in the state of Selangor, Malaysia. Journal of Building Performance, v. 1, n. 1, p. 73-82, 2010.
|
2010MOHAMMAD, N. et al. Investigation on the Causes of Variation Orders in the Construction of Building Project: a study in the state of Selangor, Malaysia. Journal of Building Performance, v. 1, n. 1, p. 73-82, 2010.
|
Malásia |
Variation |
Mota, Viana e IsattoMOTA, B. P.; VIANA, D. D.; ISATTO, E. L. Simulating the Last Planner With System Dynamics. In: ANNUAL CONFERENCE OF THE INTERNATIONAL GROUP FOR LEAN CONSTRUCTION, 18., Haifa, 2010. Proceedings... Haifa, 2010.
|
2010MOTA, B. P.; VIANA, D. D.; ISATTO, E. L. Simulating the Last Planner With System Dynamics. In: ANNUAL CONFERENCE OF THE INTERNATIONAL GROUP FOR LEAN CONSTRUCTION, 18., Haifa, 2010. Proceedings... Haifa, 2010.
|
Brasil |
Variabilidade |
Pourrostam e IsmailPOURROSTAM, T.; ISMAIL, A. Significant Factors Causing and Effects of Delay in Iranian Construction Projects. Australian Journal of Basic and Applied Sciences, v. 5, n. 7, p. 450-456, Jul. 2011.
|
2011POURROSTAM, T.; ISMAIL, A. Significant Factors Causing and Effects of Delay in Iranian Construction Projects. Australian Journal of Basic and Applied Sciences, v. 5, n. 7, p. 450-456, Jul. 2011.
|
Malásia |
Delay |
Wambeke, Hsiang e LiuWAMBEKE, B. W.; HSIANG, S. M.; LIU, M. Causes of Variation in Construction Project Task Starting Times and Duration. Journal of Construction Engineering and Management, v. 137, n. 9, p. 663-677, 2011.
|
2011WAMBEKE, B. W.; HSIANG, S. M.; LIU, M. Causes of Variation in Construction Project Task Starting Times and Duration. Journal of Construction Engineering and Management, v. 137, n. 9, p. 663-677, 2011.
|
EUA |
Variation |
Russell et al.RUSSELL, M. M. Allocation of Time Buffer to Construction Project Task Durations. Raleigh, 2013. 180 f. Dissertation (Doctor of Philosophy) - Graduate Faculty of North Carolina State University, Raleigh, 2013.
|
2013RUSSELL, M. M. Allocation of Time Buffer to Construction Project Task Durations. Raleigh, 2013. 180 f. Dissertation (Doctor of Philosophy) - Graduate Faculty of North Carolina State University, Raleigh, 2013.
|
EUA |
Variation |
González et al.GONZÁLEZ, P. et al. Analysis of Causes of Delay and Time Performance in Construction Projects. Journal of Construction Engineering and Management, v. 140, n. 1, p. 1-9, 2014.
|
2014GONZÁLEZ, P. et al. Analysis of Causes of Delay and Time Performance in Construction Projects. Journal of Construction Engineering and Management, v. 140, n. 1, p. 1-9, 2014.
|
Espanha |
Delay |
De Filippi e MelhadoDE FILIPPI, G. A.; MELHADO, S. B. Um Estudo Sobre as Causas de Atrasos de Obras de Empreendimentos Imobiliários na Região Metropolitana de São Paulo. Ambiente Construído, Porto Alegre, v. 15, n. 3, p. 161-173, jul./set. 2015.
|
2015DE FILIPPI, G. A.; MELHADO, S. B. Um Estudo Sobre as Causas de Atrasos de Obras de Empreendimentos Imobiliários na Região Metropolitana de São Paulo. Ambiente Construído, Porto Alegre, v. 15, n. 3, p. 161-173, jul./set. 2015.
|
Brasil |
Variabilidade |
Reis et al.REIS, C. J. L. et al. Identificação das Causas de Atrasos de Obras: um estudo de caso na região metropolitana de Belém. In: ENCONTRO NACIONAL DE TECNOLOGIA DO AMBIENTE CONSTRUÍDO, 16., São Paulo, 2016. Anais... São Paulo, 2016.
|
2016REIS, C. J. L. et al. Identificação das Causas de Atrasos de Obras: um estudo de caso na região metropolitana de Belém. In: ENCONTRO NACIONAL DE TECNOLOGIA DO AMBIENTE CONSTRUÍDO, 16., São Paulo, 2016. Anais... São Paulo, 2016.
|
Brasil |
Atrasos |
Fazinga, Saffaro e SantanaFAZINGA, W. R.; SAFFARO, F. A.; SANTANA, V. A. Repercussão de Decisões Gerenciais no Prazo de Execução de Empreendimentos da Construção Civil. In: ENCONTRO NACIONAL DE TECNOLOGIA DO AMBIENTE CONSTRUÍDO, 16., São Paulo, 2016. Anais... São Paulo: ANTAC, 2016.
|
2016FAZINGA, W. R.; SAFFARO, F. A.; SANTANA, V. A. Repercussão de Decisões Gerenciais no Prazo de Execução de Empreendimentos da Construção Civil. In: ENCONTRO NACIONAL DE TECNOLOGIA DO AMBIENTE CONSTRUÍDO, 16., São Paulo, 2016. Anais... São Paulo: ANTAC, 2016.
|
Brasil |
Variabilidade |
Santos e SantosSANTOS, P. R. R.; SANTOS, D. G. Investigação de Perdas Devido ao Trabalho Inacabado e o Seu Impacto no Tempo de Ciclo dos Processos Construtivos. Ambiente Construído, Porto Alegre, v. 17, n. 2, p. 39-52, abr./jun. 2017.
|
2017SANTOS, P. R. R.; SANTOS, D. G. Investigação de Perdas Devido ao Trabalho Inacabado e o Seu Impacto no Tempo de Ciclo dos Processos Construtivos. Ambiente Construído, Porto Alegre, v. 17, n. 2, p. 39-52, abr./jun. 2017.
|
Brasil |
Variabilidade |
Maués et al.MAUÉS, L. M. F. et al. Construction Delays: a case study in the Brazilian Amazon. Ambiente Construído, Porto Alegre, v. 17, n. 3, p. 167-181, jul./set. 2017.
|
2017MAUÉS, L. M. F. et al. Construction Delays: a case study in the Brazilian Amazon. Ambiente Construído, Porto Alegre, v. 17, n. 3, p. 167-181, jul./set. 2017.
|
Brasil |
Delay |
Sha et al.SHA, M. K. et al. Causes and Effects of Delays in Construction Projects. Journal of Mechanical and Civil Engineering, v. 14, n. 2, p. 52-58, 2017.
|
2017SHA, M. K. et al. Causes and Effects of Delays in Construction Projects. Journal of Mechanical and Civil Engineering, v. 14, n. 2, p. 52-58, 2017.
|
Nepal |
Delay |