SciELO - Scientific Electronic Library Online

 
vol.7 issue1Globalization of markets compels changes in the value addition chain of the automotive industry author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Services on Demand

Journal

Article

Indicators

Related links

Share


Production

Print version ISSN 0103-6513

Prod. vol.7 no.1 São Paulo June 1997

http://dx.doi.org/10.1590/S0103-65131997000100006 

MJIT - Manutenção por Just in Time: manutenção otimizante realizada no tempo exato baseado em condições operacionais

 

 

Michitoshi OishiI; Carlos Augusto Candêo FontaniniII

IProf. Dr. Universidade Estadual de Ponta Grossa. Rua Dr. Alexandre Gutierrez, 863 - Apt. 91. CEP 80240-130
IIMestrando em Administração-Universidade Federal do Paraná

 

 


RESUMO

O presente artigo investigou como as fábricas japonesas desenvolvem sua manutenção para redução das paradas de produção. Isto aumenta a qualidade e produtividade, evitando atraso na entrega dos produtos e satisfazendo as necessidades dos clientes.
Além do TPM-Total Productive Maintenance, existe outro sistema de manutenção baseado nas condições operacionais do equipamento, realizando a manutenção no momento necessário, que pode ser chamado de MJ1T-Manutenção Por Jus In Time.
Este sistema evita a manutenção baseada na estimativa de vida útil do equipamento que pode realizar a manutenção antes do momento necessário, como depois da quebra.
Uma pesquisa qualitativa realizada em fábricas brasileiras, identificou o alto potencial e necessidade de implantação de um sistema de manutenção similar ao MJIT.

Palavras-chave: Sistema de manufatura, manutenção, redução nas paradas de produção, produtividade, just in time.


ABSTRACT

This article investigated how Japanese factorys develop their maintenance to reduce productions pauses. It increases productivity and quality, avoides products late delivery and satisfies customers needs.
Besides TPM-Total Productive Maintenance, there is another maintenance system based on equipment operational conditions doing the maintenance in the exact moment of necessity that can be called MJIT-Maintenance by Just In Time. It avoids unnecessary maintenance based on the estimated life time that may conduct to realize maintenance before the real necessity or after broken.
A qualitative research in brasilian factorys identified a high potential and need of a mainenance system similar to MJIT.

Key words: manufacture system, maintenance, decreasing of production pauses, productivity, just in time.


 

 

Texto completo disponível apenas em PDF.

Full text available only in PDF format.

 

 

7. Bibliografia

HAYASHI, K. Busquemos o CIM original, Revista - Controles Industriais, Tokyo, 1992.         [ Links ]

HIPKIN, I. B.; LOCKETT, A.G. A study of maintenance technology implementation. Omega, The International Journal of Management Science, vol. 23, n.1, p.79-88,1995.         [ Links ]

JOSTES, R.; HELMS, M. M. Total productive maintenance and its link to total quality management. Work Study, vol.43, n.7, p.18-20,1994.         [ Links ]

KANNO, E. Tudo sobre o CIM, Publicações da Universidade Sanno, Tokyo, 1993.         [ Links ]

KAWASAKI TECHNOLOGICAL DEVELOPMENT DIVISION, Kawasaki Total Operation Control System, Tokyo, 1993.         [ Links ]

MAGGARD, B. N.; RHYNE D. M. Total productive maintenance: a timely integration of production and maintenance. Production and Inventary Management Journal, vol. 33, n.4, p. 6-10, fourth quarter, 1992.         [ Links ]

OISHI, M. TIPS - Técnicas integradas na produção e serviços. São Paulo: Pioneira,1995.         [ Links ]

TAKAHASHI, Y., OSADA, T. TPM-Total productive maintenance. Asian Productivity Organization, Tokyo, 1990.         [ Links ]

UMEDA, T. CIM e administração estratégica. Associação de Pesquisas Industriais, 1992, Tokyo.         [ Links ]

Creative Commons License All the contents of this journal, except where otherwise noted, is licensed under a Creative Commons Attribution License