Abstract:

Knowledge management is a key resource for enabling projects and organizations to address the current challenges of competitive environment. This article aims to investigate the central themes of knowledge management in the project context, exploring the relationship between knowledge management and project performance. For this purpose, a literature review was carried out, adopting bibliometric analysis, codification and content analysis. The search and sampling process was conducted in the Web of Knowledge (Web of Science Core Collection) database. First, the results identified the main strategies to deal with tacit and explicit knowledge, which are experts’ knowledge acquisition and project documentation through coded forms, respectively. Both types of knowledge, tacit and explicit, are strongly related to two of the project success dimensions: GP efficiency, and success of the product/service. The literature pointed out that organizations recognize the importance of knowledge management but they still face many barriers to implement it in practice. The publications allowed verifying that the subjects are still little related, making it a challenging field for future studies.

Keywords:
Project management; Knowledge management; Performance

Resumo:

O gerenciamento do conhecimento é um dos principais recursos a permitir que projetos e organizações lidem com os desafios do mercado competitivo atual. Esse estudo tem como objetivo investigar os temas centrais da gestão de conhecimento no contexto de projeto, explorando a relação entre gestão de conhecimento e o desempenho de projetos. Para tal, foi realizada uma revisão de literatura, adotando análise bibliométrica, codificação e análise de conteúdo. O processo de busca e amostragem foi conduzido na base de dados da Web of Knowledge (Web of Science Core Collection). Os resultados identificaram as principais estratégias para lidar com que os conhecimentos tácito e explícito, que são aquisição de conhecimentos de especialista e documentação do projeto por meio de formulários codificados, respectivamente. Ambos os tipos de conhecimento, tácito e explicito, estão mais intensamente relacionados a duas dimensões de sucesso: eficiência na GP e sucesso do produto / serviço. A literatura aponta que muitas organizações reconhecerem a importância da gestão do conhecimento, mas ainda são muitas as barreiras para sua implementação na prática.

Palavras-chave:
Gestão de projetos; Gestão do conhecimento; Desempenho

1 Introduction

The complex and unpredictable nature of projects poses serious challenges to project managers and project-based organizations (Landaeta, 2008Landaeta, R. E. (2008). Evaluating benefits and challenges of knowledge transfer across projects. Engineering Management Journal, 20(1), 29-38. http://dx.doi.org/10.1080/10429247.2008.11431753.
http://dx.doi.org/10.1080/10429247.2008....
). Knowledge is one of the key resources that enable projects and organizations to address these challenges. In the effort to adapt and to develop new knowledge, companies have several options for developing internal knowledge, such as interpersonal knowledge networks, and a wide range of external knowledge delivery strategies, including alliances and acquisitions (Grigoriou & Rothaermel, 2017Grigoriou, K., & Rothaermel, F. T. (2017). Organizing for knowledge generation: Internal knowledge networks and the contingent effect of external knowledge sourcing. Strategic Management Journal, 38(2), 395-414. http://dx.doi.org/10.1002/smj.2489.
http://dx.doi.org/10.1002/smj.2489...
).

In this scenario, knowledge is treated as a critical driving force to achieve the company's performance goals. This is because knowledge facilitates the best business decision-making processes in a timely manner (Han & Park, 2009Han, K. H., & Park, J. W. (2009). Expert Systems with Applications Process-centered knowledge model and enterprise ontology for the development of knowledge management system. Expert Systems with Applications, 36(4), 7441-7447. http://dx.doi.org/10.1016/j.eswa.2008.09.031.
http://dx.doi.org/10.1016/j.eswa.2008.09...
). For Duffield & Whitty (2016)Duffield, S. M., & Whitty, S. J. (2016). Application of the systemic lessons learned knowledge model for organisational learning through projects. International Journal of Project Management, 34(7), 1280-1293. http://dx.doi.org/10.1016/j.ijproman.2016.07.001.
http://dx.doi.org/10.1016/j.ijproman.201...
, a company cannot manage project risks without managing its knowledge; projects thus fail due to lack of lessons learned or lack of knowledge sharing.

Cohen & Olsen (2015)Cohen, J. F., & Olsen, K. (2015). Expert Systems with Applications Knowledge management capabilities and firm performance: A test of universalistic, contingency and complementarity perspectives. Expert Systems with Applications, 42(3), 1178-1188. http://dx.doi.org/10.1016/j.eswa.2014.09.002.
http://dx.doi.org/10.1016/j.eswa.2014.09...
argue that, while not always explicitly recognized, the theoretical perspectives on the relationship between knowledge management (KM) and its implications for performance have supported previous research, such as that of Andreeva & Kianto (2012)Andreeva, T., & Kianto, A. (2012). Does knowledge management really matter? Linking knowledge management practices, competitiveness and economic performance. Journal of Knowledge Management, 16(4), 617-636. http://dx.doi.org/10.1108/13673271211246185.
http://dx.doi.org/10.1108/13673271211246...
, Storey & Hull (2010)Storey, C., & Hull, F. M. (2010). Service development success: A contingent approach by knowledge strategy. Journal of Service Management, 21(2), 140-161. http://dx.doi.org/10.1108/09564231011039268.
http://dx.doi.org/10.1108/09564231011039...
and Choi & Lee (2003)Choi, B., & Lee, H. (2003). An empirical investigation of KM styles and their effect on corporate performance. Information & Management, 40(5), 403-417. http://dx.doi.org/10.1016/S0378-7206(02)00060-5.
http://dx.doi.org/10.1016/S0378-7206(02)...
. From a practical point of view, companies realized the importance of managing knowledge to stay competitive. However, many knowledge management systems were not successful. Therefore, a divergence in the practitioner's view on knowledge management and the academic perspective is already evident (López-Nicolás & Meroño-Cerdán, 2011López-Nicolás, C., & Merono-Cerdán, Á. L. (2011). Strategic knowledge management, innovation and performance. International Journal of Information Management, 31(6), 502-509. http://dx.doi.org/10.1016/j.ijinfomgt.2011.02.003.
http://dx.doi.org/10.1016/j.ijinfomgt.20...
).

However, despite the importance of knowledge management in projects, the reference guides give little attention to the topic. Only in its 6th edition (PMI, 2017Project Management Institute. (2017). A guide to the project management body of knowledge (PMBOK® guide). (6th ed.). Newtown Square: PMI.) did the Project Management Body of Knowledge include a process related to Knowledge Management.

To fill this gap, this study aims to investigate the central themes of knowledge management in the context of the project, exploring the relationship between knowledge management and project performance. For this, the methodological approach adopted was a systematic review of the literature, using bibliometric techniques and content analysis, with a sample of articles from the Web of Knowledge (Web of Science Core Collection) database. In the process of content analysis, a coding system was developed that guided the analysis of the networks and the relationships between the central themes of the research. The objective was detailed in the following research questions: (QP1) What are the central themes of knowledge management in projects? (QP2) What is the relationship between knowledge management and project performance?

The study contributes to the literature by providing an overview of the concepts project management, knowledge management and performance, highlighting aspects relevant to these subjects in the academic literature. In addition, it promotes a better understanding of the relationship between concepts, which allows identifying their impacts.

The rest of the paper is structured as follows: section 2 presents the theoretical reference, which deals with the researched concepts; section 3 shows the methodology used, which involves the process of data sampling and analysis, through bibliometric analysis, coding and content; section 4 contains the presentation of the results; section 5 the discussion of the results yielded; and finally, section 6 demonstrates the conclusions, limitations, and future research.

2 Literature review

2.1 Knowledge management

Despite the broad range of research on knowledge management, there seems to be no universal definition of the term, just as there is no consensus on what constitutes it. For (Suresh et al., 2016Suresh, S., Olayinka, R., Chinyio, E., & Renukappa, S. (2016). Impact of knowledge management on construction projects. Proceedings of the Institution of Civil Engineers-Management, Procurement and Law, 170(1): 27-48.), the various definitions of knowledge can be summarized and classified into: definitions of the classical era of knowledge, as a justified true belief and contemporary definitions of knowledge, as a mixture of experiences, values and information. Contemporary definitions are more relevant to management as they focus on the use of knowledge and the notion of knowledge as a practical tool for framing experiences, sharing ideas, and assisting with practical tasks. Therefore, knowledge management implies understanding the uses of knowledge to effectively deal with the practical tasks involving knowledge-based activities.

The literature recognizes as a dominant aspect of knowledge management the conversion of knowledge through the interfaces between tacit and explicit knowledge (Nonaka & Takeuchi, 1995Nonaka, I., & Takeuchi, H. (1995). The knowledge-creating company: How Japanese companies create the dynamics of innovation. New York: Oxford University Press.; Reich et al., 2012Reich, B. H., Gemino, A., & Sauer, C. (2012). Knowledge management and project-based knowledge in it projects: A model and preliminary empirical results. International Journal of Project Management, 30(6), 663-674. http://dx.doi.org/10.1016/j.ijproman.2011.12.003.
http://dx.doi.org/10.1016/j.ijproman.201...
). Explicit knowledge is usually formal and systematic and can be shared easily, since the tacit is personal and difficult to formalize and may be difficult to capture or communicate with others (Nonaka & Takeuchi, 1995Nonaka, I., & Takeuchi, H. (1995). The knowledge-creating company: How Japanese companies create the dynamics of innovation. New York: Oxford University Press.). The conversion of knowledge is made up of four interfaces known as SECI: socialization (tacit knowledge conversion into tacit knowledge), externalization (tacit to explicit), combination (explicit to explicit) and internalization (explicit to tacit). Thus, knowledge management involves all the practices of an organization to create, store, use and share knowledge (Lindner & Wald, 2011Lindner, F., & Wald, A. (2011). Success factors of knowledge management in temporary organizations. JPMA, 29(7), 877-888. http://dx.doi.org/10.1016/j.ijproman.2010.09.003.
http://dx.doi.org/10.1016/j.ijproman.201...
).

Within this perspective, in projects, one of the main questions for knowledge management is the poor analysis of the project success and the lack of adequate documentation on the results of previous projects (Todorović et al., 2015Todorović, M. L., Petrović, D. Č., Mihić, M. M., Obradović, V. L., & Bushuyev, S. D. (2015). Project success analysis framework: A knowledge-based approach in project management. International Journal of Project Management, 33(4), 772-783. http://dx.doi.org/10.1016/j.ijproman.2014.10.009.
http://dx.doi.org/10.1016/j.ijproman.201...
). This difficulty may be associated with the temporality of the projects, which causes knowledge sharing to require external effort (Duffield & Whitty, 2016Duffield, S. M., & Whitty, S. J. (2016). Application of the systemic lessons learned knowledge model for organisational learning through projects. International Journal of Project Management, 34(7), 1280-1293. http://dx.doi.org/10.1016/j.ijproman.2016.07.001.
http://dx.doi.org/10.1016/j.ijproman.201...
). This effort can bring a substantial/sound investment to the organization, whereby the financial gains from the effective management of the project knowledge is difficult to measure. Another difficulty arises from the observation that the implementation of knowledge management in the project configurations still seems to be insufficiently used. This general deficiency in business practice is impressive in terms of the high potential benefits in terms of efficiency, effectiveness and innovation resulting from project knowledge management successfully implemented in different types of companies (Hanisch et al., 2009Hanisch, B., Lindner, F., Mueller, A., & Wald, A. (2009). Knowledge management in project environments. Journal of Knowledge Management, 13(4), 148-160. http://dx.doi.org/10.1108/13673270910971897.
http://dx.doi.org/10.1108/13673270910971...
).

Tacit knowledge, as individual experiences, is a primary source of project management competence. Not opposing the benefits of KM, identifying critical knowledge and reusability remains a challenge for many project organizations (Yap et al., 2017Yap, J. B. H., Abdul-rahman, H., & Chen, W. (2017). Collaborative model: managing design changes with reusable project experiences through project learning and effective communication. International Journal of Project Management, 35(7), 1253-1271. http://dx.doi.org/10.1016/j.ijproman.2017.04.010.
http://dx.doi.org/10.1016/j.ijproman.201...
).

According to Landaeta (2008)Landaeta, R. E. (2008). Evaluating benefits and challenges of knowledge transfer across projects. Engineering Management Journal, 20(1), 29-38. http://dx.doi.org/10.1080/10429247.2008.11431753.
http://dx.doi.org/10.1080/10429247.2008....
, projects need three types of knowledge to achieve their goals. The first, technical knowledge, allows projects to perform their tasks as prescribed. However, when problems arise, a different kind of knowledge is needed, knowledge to solve them. The third type of knowledge allows continuous improvement of project tasks. For Zhang et al. (2017)Zhang, J., Li, H., & Wang, S. H. (2017). Analysis and Potential application of the maturity of growth management in the developing construction industry of a Province of China: A case study. Sustainability, 9(1), 1-36. https://doi.org/10.3390/su9010143.
https://doi.org/10.3390/su9010143...
, standardization, knowledge management through lessons learned, and cost management for budget control using information systems are necessary for project management.

2.2 Performance in projects

Project performance has been the subject of discussions in the project management literature. According to Carvalho et al. (2015)Carvalho, M. M., Patah, L. A., & Souza Bido, D. (2015). Project management and its effects on project success: cross-country and cross-industry comparisons. International Journal of Project Management, 33(7), 1509-1522. http://dx.doi.org/10.1016/j.ijproman.2015.04.004.
http://dx.doi.org/10.1016/j.ijproman.201...
, the traditional view of project success is associated with the achievement of time, cost and quality objectives (iron triangle). However, several studies have investigated new dimensions of project success (Carvalho & Rabechini, 2015Carvalho, M. M., & Rabechini, R., Jr. (2015). Fundamentos em gestão de projetos: construindo competências para gerenciar projetos. São Paulo: Atlas). Thus, there seems to be no simple definition for this construction, since it can be measured differently in different types of projects, from different perspectives, at different stages and in absolute or relative terms, which makes it a multidimensional construct (Carvalho et al. al., 2015).

Thus, studies analyze their relation to other constructs. For Carvalho & Rabechini (2015)Carvalho, M. M., & Rabechini, R., Jr. (2015). Fundamentos em gestão de projetos: construindo competências para gerenciar projetos. São Paulo: Atlas, although some studies have found that risk management has a low impact on project performance, others have suggested that even moderate levels of risk management planning are sufficient to reduce the negative effects of risk on project success. These distinct findings can be explained by the contingency approach, in which the type of project can affect not only a project performance but also the effectiveness of project management practices. Another explanation for the contradictory findings is that these studies focus on risk management, neglecting relevant aspects of uncertainty management, such as the soft skills of project stakeholders, represented by behavioral competencies that include skills such as negotiation, leadership, conflict management, among others.

Carvalho & Rabechini (2017)Carvalho, M. M., & Rabechini, R., Jr. (2017). Can project sustainability management impact project success? An empirical study applying a contingent approach. International Journal of Project Management, 35(6), 1120-1132. http://dx.doi.org/10.1016/j.ijproman.2017.02.018.
http://dx.doi.org/10.1016/j.ijproman.201...
point out a lack of confirmatory studies about the relationship between sustainability and project performance, which are thus sought in this study. The results reinforce the perspective of a positive and significant impact among the constructs. Failing to identify a negative influence on project performance if related to costs.

2.3 Knowledge management and performance in projects

The relationship of knowledge management and project performance still represent a research gap (Cohen & Olsen, 2015Cohen, J. F., & Olsen, K. (2015). Expert Systems with Applications Knowledge management capabilities and firm performance: A test of universalistic, contingency and complementarity perspectives. Expert Systems with Applications, 42(3), 1178-1188. http://dx.doi.org/10.1016/j.eswa.2014.09.002.
http://dx.doi.org/10.1016/j.eswa.2014.09...
). Previous studies provide empirical evidence of a positive impact between these constructs (Reich et al., 2014Reich, B. H., Gemino, A., & Sauer, C. (2014). How knowledge management impacts performance in projects: an empirical study. International Journal of Project Management, 32(4), 590-602. http://dx.doi.org/10.1016/j.ijproman.2013.09.004.
http://dx.doi.org/10.1016/j.ijproman.201...
; Lindhard & Larsen, 2016Lindhard, S., & Larsen, J. K. (2016). Identifying the key process factors affecting project performance. Engineering, Construction, and Architectural Management, 23(5), 657-673. http://dx.doi.org/10.1108/ECAM-08-2015-0123.
http://dx.doi.org/10.1108/ECAM-08-2015-0...
). However, the mechanisms of this relationship are not fully understood, as there is still a limitation in understanding how systems can be aligned with organizational goals and strategies (Ali et al., 2018Ali, I., Musawir, A. U., & Ali, M. (2018). Impact of knowledge sharing and absorptive capacity on project performance: the moderating role of social processes. Journal of Knowledge Management, 22(2), 453-477. http://dx.doi.org/10.1108/JKM-10-2016-0449.
http://dx.doi.org/10.1108/JKM-10-2016-04...
).

In their search for this understanding, Lindhard & Larsen (2016)Lindhard, S., & Larsen, J. K. (2016). Identifying the key process factors affecting project performance. Engineering, Construction, and Architectural Management, 23(5), 657-673. http://dx.doi.org/10.1108/ECAM-08-2015-0123.
http://dx.doi.org/10.1108/ECAM-08-2015-0...
present knowledge sharing and communication as key to improving cost, time and quality performance. Thus, a better sharing of experiences and communication will increase the likelihood of the project success through improved skills, commitment and coordination. Cunha et al. (2014)Cunha, J. A., Figueiredo, J., Matos, F., & Thomaz, J. (2014, September). Knowledge Management on PMO’s Perspective: A Systematic Review. In Proceedings of the European Conference on Knowledge Management (Vol. 1, p. 233). Santarém, Portugal: Academic Conferences International Limited. corroborate that knowledge management is an important integrative function, with impacts organizational learning and, consequently, project performance.

3 Research methods

To achieve our aim to investigate the relationship between project management and knowledge management in a performance context, we decided to carry out a systematic review of the literature. There are different possibilities that can be considered in the development of a literature review; a combination of bibliometric and content analysis was used herein. These analyses are complementary, since the first attempts to identify literature patterns based on publication data, and the second capture information to quantify word sequences to model a related language used by different research fields (Carvalho et al., 2013Carvalho, M. M., Fleury, A., & Lopes, A. P. (2013). An overview of the literature on technology roadmapping (TRM): contributions and trends. Technological Forecasting and Social Change, 80(7), 1418-1437. http://dx.doi.org/10.1016/j.techfore.2012.11.008.
http://dx.doi.org/10.1016/j.techfore.201...
). The flow chart of the literature review is shown in Figure 1.

Figure 1
Flow chart of the systematic literature review.

3.1 Sampling procedure

To obtain the initial sample, the ISI Web of Science Core Collection database was selected, as it provides an interface for simultaneously searching documents in other databases and is also the source for calculating the Journal Citation Report (JCR) index, one of the mechanisms most used to evaluate journals based on citation data (Franco et al., 2018Franco, E. F., Hirama, K., & Carvalho, M. M. (2018). Applying system dynamics approach in software and information system projects: A mapping study. Information and Software Technology, 93, 58-73. http://dx.doi.org/10.1016/j.infsof.2017.08.013.
http://dx.doi.org/10.1016/j.infsof.2017....
). The research was carried out using the following search filter: “project management” AND “knowledge management” AND (performance OR success). Only publications of the type “articles” were selected, due to the rigor of their publication; no temporal or area filters were used. As a result, it was possible to identify 84 articles.

After the sample definition, we proceeded with the export of the metadata of these studies to a spreadsheet. The next step consisted in organization and standardization of the data collected. Subsequently, the abstracts of the 84 articles were analyzed to verify their alignment with the researched topic, 47 were excluded, as they were not within the scope of this study, resulting in 37 articles selected for analysis.

3.2 Data analysis

The data analysis was based on bibliometrics and content analysis. Bibliometric analysis aimed at verifying aspects such as: evolution of the number of publications and citations over time, periodicals of greater relevance, in addition to the authors' co-citation networks and co-citation of the references. The descriptive statistics analyses were elaborated with the help of Excel and the networks with the help of VOSVIEWER software.

Finally, content analysis was performed by means of a careful reading of the articles. A coding scheme was developed to classify the works according to the codes presented in Table 1. After the content analysis, the analysis of relationships between codes and core-periphery were elaborated with the aid of UCINET 6 (Borgatti et al., 2002Borgatti, S. P., Everett, M. G., & Freeman, L. C. (2002). Ucinet for Windows: Software for social network analysis. Harvard, MA: Analytic Technologies. Recuperado em 14 de setembro de 2018, de https://sites.google.com/site/ucinetsoftware/home
https://sites.google.com/site/ucinetsoft...
).

Table 1
Stratification of Codes.

4 Presentation and discussion of results

4.1 Analysis of publications

The analysis of publications aims to verify trends of growth or reduction of interest in relation to the subject studied. The temporal evolution of the publications and citations can be observed in Graph 1. The solid line represents the evolution of the publications and the dashed line, of the citations. As verified, the number of publications began in 1999; however, between 2000 and 2005, no studies on the subject were found. From 2006 to date, there is an average of 3 articles per year, showing a stability in relation to the interest in the subject. However, due to the number of publications, the themes of project management, knowledge management and performance can be observed to be still poorly related. As far as citations are concerned, a significant increase has been observed since 2008, reaching a level of 134 citations in 2016 and a total of 663 over the period, demonstrating that the researchers are interested in the subject and that they use the publications selected by this study as the main references.

Graph 1
Time evolution of publications and citations.

Another analysis performed in this study meant to identify articles with the highest number of citations. Table 2 identifies the eight main articles on the subject studied, with a total of 358 citations, representing approximately 53% of the sample citations. The table also indicates that the articles were publications between 2007 and 2014. The first most cited article is Lindner & Wald (2011)Lindner, F., & Wald, A. (2011). Success factors of knowledge management in temporary organizations. JPMA, 29(7), 877-888. http://dx.doi.org/10.1016/j.ijproman.2010.09.003.
http://dx.doi.org/10.1016/j.ijproman.201...
with 75 citations. In the study, they seek to detect the success factors in knowledge management in project temporary organizations.

Table 2
Most cited articles.

The articles collected had their publications distributed in 23 journals. Table 3 presents the most relevant journals, which had at least two publications on the subject and together accumulate 21 (55%) of the 38 publications. Note the importance of the International Journal of Project Management, the periodical with the greatest impact factor among the journals selected, containing eight publications, which encourages researchers to use it.

Table 3
Relevant journals.

It is also possible to observe that although the relationship between the subjects studied is recent, several journals have published articles related to the subject, evidencing that the theme is not concentrated in journals in the research area of project management and knowledge management, but also in journals of information technology (Information & Management and Expert Systems with Applications), innovation (Technovation) and engineering (Proceedings of the Institution of Civil Engineers).

In relation to the authors most relevant to the theme of this study, a dispersion was verified, since 89 authors were identified, only 10 of them with two publications, which demonstrates the absence of a concentration of reference authors in the project management, knowledge management and performance study fields. The authors of the paper “Knowledge Management in Project Environments” written in a partnership with Bastian Hanisch and Ana Mueller and “Success factors of knowledge management in temporary organizations” are among the eight most cited articles of the sample, with 40 and 75 citations, respectively, and were published in relevant journals - Journal of Knowledge Management and International Journal of Project Management respectively-, proving the importance of these two authors for this theme. The first article points out the success of knowledge management in projects being determined mainly by cultural factors, while technical aspects such as information systems and project management methods are only considered support factors. In order to corroborate this result, the second article aims to test the influence of cultural, organizational, structural and process-related factors on the effectiveness of knowledge management. As a result, they show that besides IT support, formal elements of the organization strongly influence the success of knowledge management. They affirmed that in temporary organizations, they compensate for the lack of organizational routines and organizational memory.

4.2 Central authors and references

The first analysis is about the authors' co-citation network, verified how the authors mentioned by the 37 articles of the sample relate, enabling the formation of clusters. In this case, clusters represent groups of authors that are quoted together more frequently, and can thus determine a major theme researched. Figure 2 shows the network of citations found with the help of software VOSVIEWER. The criterion for forming the network was authors with at least four citations, which totaled 10 authors out of the 57 authors of the sample, most containing 0 citations.

Figure 2
Authors' co-citation network.

From this network, illustrated in Figure 2, it was possible to identify three clusters: the first one (green color), with four representatives, led by Ikujiro Nonaka, one of the greatest references in the literature on knowledge management; the second cluster (red color) groups authors such as Wynne W. Chin, author of works on the modeling technique of structural equations and Amrit Tiwana, researcher on knowledge management and information systems. Finally, the third cluster (blue color), has only two representatives Morten T. Hansen, reference author on networks of knowledge in projects and Philip M. Podsakoff recognized by works in the methodological area regarding the construction of indicators and measurement model in the marketing and consumer research fields.

The second analysis refers to the network of reference citations, shown in Figure 3. This network represents the 10 main references that appear in the articles of the sample and had as its criterion of choice; out of the 1774 references, those that presented a minimum number of three citations. As a highlight, it is possible to observe the greatest relevance for Nonaka & Takeuchi (1995)Nonaka, I., & Takeuchi, H. (1995). The knowledge-creating company: How Japanese companies create the dynamics of innovation. New York: Oxford University Press. entitled “The knowledge-creating company: How Japanese companies create the dynamics of innovation” with 16 citations. This implication, supported by the results found in the network of authors, confirms the importance of the research by Ikujiro Nonaka for the researched subject.

Figure 3
Network of reference cocitation.

4.3 Content analysis

Content analysis was applied with the purpose of answering the research question of this study: (QP1) What are the central themes of knowledge management in projects?

4.3.1 Descriptive analysis of the coding scheme

Table 4 shows a summary of the coding result of the 37 articles in the sample using the coding scheme already shown in Table 1. The complete result of the content analysis of each article is available in Appendix A Appendix A - Content Analysis Summary Code C1 C2 C3 C4 C5 C6 C7 C8 Reference TE1 TE2 TE3 TE4 TE5 TE6 TE7 TE8 A1 A2 A3 NA1 NA2 NA3 S1 S2 S3 S4 C1 C2 IE2 IE2 IE3 IE4 IT1 IT2 IT3 IT4 DDP1 DDP2 DDP3 DDP4 DDP5 DDP6 DDP7 Zhang & Wang (2017) 1 1 1 1 1 1 1 1 Suresh et al. (2017) 1 1 1 1 1 1 1 1 1 1 McClory et al. (2017) 1 1 1 1 1 1 1 1 1 1 1 Oun et al. (2016) 1 1 1 1 1 1 1 1 1 Nkuruziza et al. (2016) 1 1 1 1 1 1 1 1 Addis (2016) 1 1 1 1 1 1 1 1 1 Spalek (2015) 1 1 1 1 1 1 1 Olayinka et al. (2015) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Oluikpe (2015) 1 1 1 1 1 1 1 1 1 1 1 Chandrasekaran & Linderman (2015) 1 1 1 1 1 1 1 1 1 1 1 Todorovic et al. (2015) 1 1 1 1 1 1 1 1 1 1 Savolainen & Ahonen (2015) 1 1 1 1 1 1 1 1 1 1 1 Lee et al. (2014) 1 1 1 1 1 1 1 1 Reich et al. (2014) 1 1 1 1 1 1 1 1 1 Park & Lee (2014) 1 1 1 1 1 1 1 1 1 Lech (2014) 1 1 1 1 1 1 1 Zangiski et al. (2013) 1 1 1 1 1 1 1 1 Palacios-Marques et al. (2013) 1 1 1 1 1 1 1 1 Reich et al. (2012) 1 1 1 1 1 1 1 1 Sáenz et al. (2012) 1 1 1 1 1 1 1 1 1 1 Reference TE1 TE2 TE3 TE4 TE5 TE6 TE7 TE8 A1 A2 A3 NA1 NA2 NA3 S1 S2 S3 S4 C1 C2 IE2 IE2 IE3 IE4 IT1 IT2 IT3 IT4 DDP1 DDP2 DDP3 DDP4 DDP5 DDP6 DDP7 Liu (2011) 1 1 1 1 1 1 1 1 1 Lindner & Wald (2011) 1 1 1 1 1 1 1 1 1 1 1 1 Ajmal et al. (2010) 1 1 1 1 1 1 1 1 1 Han & Park (2009) 1 1 1 1 1 1 1 1 1 1 Hanisch et al. (2009) 1 1 1 1 1 1 1 1 1 1 Landaeta (2008) 1 1 1 1 1 1 1 1 1 1 1 Xu & Ramesh (2008) 1 1 1 1 1 1 1 1 1 1 1 Akgun et al. (2008) 1 1 1 1 1 1 1 1 Anbari et al. (2008) 1 1 1 1 1 1 1 1 1 1 1 Hong et al. (2008) 1 1 1 1 1 1 1 1 1 1 Petter & Vaishnavi (2008) 1 1 1 1 1 1 1 1 1 1 1 Sharif & Kayis (2007) 1 1 1 1 1 1 1 1 1 Parolia et al. (2007) 1 1 1 1 1 1 1 1 Patnayakuni et al. (2007) 1 1 1 1 1 1 1 Suikki et al. (2006) 1 1 1 1 1 1 1 1 1 Hynes et al. (1999) 1 1 1 1 1 1 1 Collinson (1999) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 . The cross-analysis of the data according to the coding scheme is presented in Appendix B Appendix B - Cross-analysis according to the coding scheme C1 C2 IE2 IE2 IE3 IE4 IT1 IT2 IT3 IT4 DDP1 DDP2 DDP3 DDP4 DDP5 DDP6 DDP7 C1 28 16 6 2 9 2 17 2 13 5 14 14 6 9 4 0 1 C2 16 25 9 4 15 6 11 2 6 3 11 17 5 5 2 0 0 IE2 6 9 9 2 3 1 4 0 1 2 3 6 2 2 1 0 0 IE2 2 4 2 4 2 1 2 1 0 2 2 2 2 1 0 0 0 IE3 9 15 3 2 15 4 7 2 4 1 7 10 2 4 1 0 0 IE4 2 6 1 1 4 6 2 1 2 0 4 3 3 1 0 0 0 IT1 17 11 4 2 7 2 17 2 4 3 10 7 3 6 3 0 0 IT2 2 2 0 1 2 1 2 2 1 1 2 0 1 2 0 0 0 IT3 13 6 1 0 4 2 4 1 13 0 6 7 3 6 1 0 1 IT4 5 3 2 2 1 0 3 1 0 5 3 2 1 1 1 0 0 DDP1 14 11 3 2 7 4 10 2 6 3 17 4 3 6 0 0 0 DDP2 14 17 6 2 10 3 7 0 7 2 4 21 5 3 2 0 0 DDP3 6 5 2 2 2 3 3 1 3 1 3 5 9 1 1 0 0 DDP4 9 5 2 1 4 1 6 2 6 1 6 3 1 10 0 0 0 DDP5 4 2 1 0 1 0 3 0 1 1 0 2 1 0 4 0 1 DDP6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DDP7 1 0 0 0 0 0 0 0 1 0 0 0 0 0 1 0 1 .

Table 4
Coding of selected articles.

Table 4 allows verifying that the great majority of the articles is linked to the survey methodology with quantitative approach. These two findings show that the interest is in ascertaining the opinions, characteristics and attitudes of those involved by means of a research instrument, obtaining reliable results, which can even be projected for the universe studied for being based on a statistical sample. This is possible, therefore, once there already is a knowledge about the topics covered.

The level of analysis of the articles was in relation to the projects and organization, having little relevance to works concerned with the individual aspect. Of these articles, most do not specify the sector of the study or the analysis is carried out in several sectors together, evidencing that the objective concern the project or organization in general and not a specific sector.

The focus of the articles is balanced between tacit and explicit knowledge. With regard to explicit knowledge, documentation is the indicator most cited by researchers as a way of sharing systemic knowledge. According to Todorović et al. (2015)Todorović, M. L., Petrović, D. Č., Mihić, M. M., Obradović, V. L., & Bushuyev, S. D. (2015). Project success analysis framework: A knowledge-based approach in project management. International Journal of Project Management, 33(4), 772-783. http://dx.doi.org/10.1016/j.ijproman.2014.10.009.
http://dx.doi.org/10.1016/j.ijproman.201...
, the analysis of the correlation between how knowledge is acquired and transferred and the benefits this generates for project managers and team members, shows that documentation of previously acquired knowledge contributes to more efficient scheduling, resolution reduction of resource consumption, faster execution of tasks. This confirms that several benefits are derived from implementing the proposed concept for knowledge acquisition and transfer. For tacit knowledge, the indicators “acquisition of knowledge from specialists and co-workers” and “informal dialogues for knowledge sharing” are the most representative mechanisms. In addition, the success dimensions of the articles are mainly linked to the efficiency of the project management and the product / service. It is noted that the impact on the client, as well as the social and environmental impact are still little explored by studies.

4.3.2 Content analysis of sample texts

The texts of the research sample, detailed in Appendix A Appendix A - Content Analysis Summary Code C1 C2 C3 C4 C5 C6 C7 C8 Reference TE1 TE2 TE3 TE4 TE5 TE6 TE7 TE8 A1 A2 A3 NA1 NA2 NA3 S1 S2 S3 S4 C1 C2 IE2 IE2 IE3 IE4 IT1 IT2 IT3 IT4 DDP1 DDP2 DDP3 DDP4 DDP5 DDP6 DDP7 Zhang & Wang (2017) 1 1 1 1 1 1 1 1 Suresh et al. (2017) 1 1 1 1 1 1 1 1 1 1 McClory et al. (2017) 1 1 1 1 1 1 1 1 1 1 1 Oun et al. (2016) 1 1 1 1 1 1 1 1 1 Nkuruziza et al. (2016) 1 1 1 1 1 1 1 1 Addis (2016) 1 1 1 1 1 1 1 1 1 Spalek (2015) 1 1 1 1 1 1 1 Olayinka et al. (2015) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Oluikpe (2015) 1 1 1 1 1 1 1 1 1 1 1 Chandrasekaran & Linderman (2015) 1 1 1 1 1 1 1 1 1 1 1 Todorovic et al. (2015) 1 1 1 1 1 1 1 1 1 1 Savolainen & Ahonen (2015) 1 1 1 1 1 1 1 1 1 1 1 Lee et al. (2014) 1 1 1 1 1 1 1 1 Reich et al. (2014) 1 1 1 1 1 1 1 1 1 Park & Lee (2014) 1 1 1 1 1 1 1 1 1 Lech (2014) 1 1 1 1 1 1 1 Zangiski et al. (2013) 1 1 1 1 1 1 1 1 Palacios-Marques et al. (2013) 1 1 1 1 1 1 1 1 Reich et al. (2012) 1 1 1 1 1 1 1 1 Sáenz et al. (2012) 1 1 1 1 1 1 1 1 1 1 Reference TE1 TE2 TE3 TE4 TE5 TE6 TE7 TE8 A1 A2 A3 NA1 NA2 NA3 S1 S2 S3 S4 C1 C2 IE2 IE2 IE3 IE4 IT1 IT2 IT3 IT4 DDP1 DDP2 DDP3 DDP4 DDP5 DDP6 DDP7 Liu (2011) 1 1 1 1 1 1 1 1 1 Lindner & Wald (2011) 1 1 1 1 1 1 1 1 1 1 1 1 Ajmal et al. (2010) 1 1 1 1 1 1 1 1 1 Han & Park (2009) 1 1 1 1 1 1 1 1 1 1 Hanisch et al. (2009) 1 1 1 1 1 1 1 1 1 1 Landaeta (2008) 1 1 1 1 1 1 1 1 1 1 1 Xu & Ramesh (2008) 1 1 1 1 1 1 1 1 1 1 1 Akgun et al. (2008) 1 1 1 1 1 1 1 1 Anbari et al. (2008) 1 1 1 1 1 1 1 1 1 1 1 Hong et al. (2008) 1 1 1 1 1 1 1 1 1 1 Petter & Vaishnavi (2008) 1 1 1 1 1 1 1 1 1 1 1 Sharif & Kayis (2007) 1 1 1 1 1 1 1 1 1 Parolia et al. (2007) 1 1 1 1 1 1 1 1 Patnayakuni et al. (2007) 1 1 1 1 1 1 1 Suikki et al. (2006) 1 1 1 1 1 1 1 1 1 Hynes et al. (1999) 1 1 1 1 1 1 1 Collinson (1999) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 , present a very varied theme, whose synthesis of content analysis is discussed in this section.

The studies by Zhang et al. (2017)Zhang, J., Li, H., & Wang, S. H. (2017). Analysis and Potential application of the maturity of growth management in the developing construction industry of a Province of China: A case study. Sustainability, 9(1), 1-36. https://doi.org/10.3390/su9010143.
https://doi.org/10.3390/su9010143...
show that two knowledge issues arise when it comes to growth management. The first question concerns whether an organization has the necessary knowledge resources to enable growth and the second issue is the need for management to have relevant and real-time information to make decisions.

For Suresh et al. (2016)Suresh, S., Olayinka, R., Chinyio, E., & Renukappa, S. (2016). Impact of knowledge management on construction projects. Proceedings of the Institution of Civil Engineers-Management, Procurement and Law, 170(1): 27-48., the implementation of knowledge management strategies in construction projects can accumulate benefits such as better performance and continuous improvement. However, many projects still do not use knowledge management completely and are therefore plagued with inefficiencies, repetition of errors, and lack of lessons learned, thus contributing to additional project costs. Lack of skills, design changes, errors and omissions contribute to the internal cost element of failure of the overall cost of poor quality in construction projects. In this same context, Olayinka et al. (2015)Olayinka, R., Suresh, S., & Chinyio, E. (2015). Impact of knowledge management on the cost of poor quality. Proceedings of the Institution of Civil Engineers-Management, Procurement and Law, 168(4), 177-188. http://dx.doi.org/10.1680/mpal.1400035.
http://dx.doi.org/10.1680/mpal.1400035...
concluded that knowledge management has a positive impact but has not been optimized to reduce costs of poor quality due to barriers, such as lack of performance metrics, time constraints and budget. KM optimization to reduce the cost of poor quality was therefore associated with overcoming these barriers: (1) developing performance metrics to assess KM impact on cost, (2) naming and supporting knowledge champions to facilitate KM activities to reduce cost, (3) encourage organizational culture in relation to KM, (4) allocate time and budget for KM activities, and (5) select acquisition strategies that support KM.

Ajmal et al. (2010)Ajmal, M., Helo, P., & Kekäle, T. (2010). Critical factors for knowledge management in project business. Journal of Knowledge Management, 14(1), 156-168. http://dx.doi.org/10.1108/13673271011015633.
http://dx.doi.org/10.1108/13673271011015...
also discuss the barriers to success in knowledge management initiatives and find that the lack of incentives for employees who participated in KM initiatives was the most significant barrier, suggesting that the top management should provide adequate incentive schemes for employees to get involved. The second most significant barrier was the lack of an adequate system to deal with knowledge in project-based organizations. The lack of coordination between officials and departments was the third most significant barrier, while the lack of familiarity was the fourth most significant. It seems that proper coordination among employees familiar with KM goals and methods would increase the likelihood of success in KM initiatives. The lack of cultural support was only the fifth most significant barrier identified. Finally, the lack of authority to carry out knowledge activities was the least significant barrier.

The results of Oun et al. (2016)Oun, T. A., Blackburn, T. D., Olson, B. A., Blessner, P., & George, T. (2016). An enterprise-wide knowledge management approach to project management. Engineering Management Journal, 28(3), 179-192. http://dx.doi.org/10.1080/10429247.2016.1203715.
http://dx.doi.org/10.1080/10429247.2016....
indicate that there is a significant relationship between the four pillars of KM (leadership, organization, technology and learning) and project management knowledge areas. Specifically, it shows that project human resource management and project stakeholder management have the strongest association with enterprise-wide KM. Another relationship was studied by Nkuruziza et al. (2016)Nkuruziza, G., Kasekende, F., Otengei, S. O., Mujabi, S., & Ntayi, J. M. (2016). An investigation of key predictors of performance of agricultural projects in Sub-Saharan Africa: A case of Uganda. International Journal of Social Economics, 43(7), 676-691. http://dx.doi.org/10.1108/IJSE-09-2014-0181.
http://dx.doi.org/10.1108/IJSE-09-2014-0...
that concluded that knowledge management and stakeholder involvement are significant predictors of project performance in the agricultural sector. The project team, model farmers, and other agricultural project stakeholders should be equipped with tacit and explicit knowledge and involved in the decision-making process for project success.

For R&D projects, authors Chandrasekaran & Linderman (2015)Chandrasekaran, A., & Linderman, K. (2015). Managing knowledge creation in High-Tech R & D Projects: A multimethod study. Decision Sciences, 46(2), 267-300. show that projects benefit from two types of knowledge - objective and intuitive. The creation of intuitive and objective knowledge in high-tech organizations occurs by creating not only diverse, but also psychological project teams. The diversity of the team positively influences the objective creation of knowledge, while psychological security affects the creation of intuitive knowledge. Surprisingly, the results show that team diversity negatively affects the intuitive creation of knowledge. A post hoc analysis takes a more detailed look at diversity and shows that different types of diversity have different effects on knowledge creation. The analysis also shows that objective and intuitive knowledge influences the performance of the R&D project.

The results of the research for Todorović et al. (2015)Todorović, M. L., Petrović, D. Č., Mihić, M. M., Obradović, V. L., & Bushuyev, S. D. (2015). Project success analysis framework: A knowledge-based approach in project management. International Journal of Project Management, 33(4), 772-783. http://dx.doi.org/10.1016/j.ijproman.2014.10.009.
http://dx.doi.org/10.1016/j.ijproman.201...
confirmed that the analysis of project success, presented through the definition of critical success factors, key performance indicators and performance measurement process, has a positive influence on the acquisition of knowledge and transfer in a project environment. That is, if a systematic approach is used when analyzing project success, one can contribute to overcoming one of the main problems in knowledge management in the project environment - the lack of adequate documentation of the results of previous projects. However, we cannot ignore the role of tacit knowledge and the smooth management of components by managing knowledge in the project environment. As for example, the knowledge acquired during the sales phase is an intangible, implicit or even tacit knowledge. This knowledge is difficult to transfer, and since individuals are important repositories of knowledge, it is not possible to transfer all the knowledge gained to another person by simply handing over documents. Instead, deliberate cognitive learning significantly promotes knowledge transfer, and learning about the customer has a positive impact on the cost control of suppliers. Therefore, both written documents and embedded knowledge in individuals involved during the sales phase are necessary for successfully implementing projects (Savolainen & Ahonen, 2015Savolainen, P., & Ahonen, J. J. (2015). Knowledge lost: Challenges in changing project manager between sales and implementation in software projects. JPMA, 33(1), 92-102. http://dx.doi.org/10.1016/j.ijproman.2014.04.003.
http://dx.doi.org/10.1016/j.ijproman.201...
).

At an individual level, the study by Lee et al. (2014)Lee, J., Lee, H., & Park, J. (2014). Exploring the impact of empowering leadership on knowledge sharing, absorptive capacity and team performance in IT service. Information Technology & People, 27(3), 366-386. http://dx.doi.org/10.1108/ITP-10-2012-0115.
http://dx.doi.org/10.1108/ITP-10-2012-01...
confirms that leadership increases the level of knowledge sharing among team members, increases the team absorption capacity and leads to better project team performance. Team-level knowledge sharing has the direct effect of improving project performance by providing information and knowledge about the related project, but, on the other hand, it helps to strengthen the path of associating absorptive capacity with project performance.

Using other constructs, Park & Lee (2014)Park, J., & Lee, J. (2014). Knowledge sharing in information systems development projects: explicating the role of dependence and trust. JPMA, 32(1), 153-165. http://dx.doi.org/10.1016/j.ijproman.2013.02.004.
http://dx.doi.org/10.1016/j.ijproman.201...
admit that dependency and trust have a strong impact on knowledge sharing, leading to good project team performance. Findings indicate that team members share their expertise when they trust their partners and when they feel dependent. The feelings of dependence and trust are influenced by the frequency of communication, perceived similarity of the value of the project and the perceived knowledge.

In another perspective, Lindner & Wald (2011)Lindner, F., & Wald, A. (2011). Success factors of knowledge management in temporary organizations. JPMA, 29(7), 877-888. http://dx.doi.org/10.1016/j.ijproman.2010.09.003.
http://dx.doi.org/10.1016/j.ijproman.201...
show that the culture of knowledge is by far the most important success factor. However, not only “soft” factors, such as top management culture and commitment, are essential for a successful transfer of knowledge between and among temporary organizations. They must be complemented by information systems that effectively support communication and storage and retrieval of knowledge in a temporary design environment. It is not the mere availability of systems, but its quality and usefulness are essential. In short, it is the interaction of several factors that lead to a successful transfer of knowledge within and between projects and from the temporary organization to the permanent organization. These authors argue that the effectiveness of knowledge management depends on a set of project management practices and dedicated activities that may be related to the extra effort in the project work. It can be assumed that there is a positive relationship between the effectiveness of the management of knowledge and the success of projects.

Proving this, Anbari et al. (2008)Anbari, F. T., Carayannis, E. G., & James, R. (2008). Post-project reviews as a key project management competence, Technovation, 28, 633-643. https://doi.org/10.1016/j.technovation.2007.12.001
https://doi.org/10.1016/j.technovation.2...
point out that the regular collection of lessons learned from projects, their careful storage in the organization's historical information database, and their significant use in subsequent projects are critical elements of project success and organizational competitiveness. This database is an essential resource from which future project teams can begin to build a comprehensive project plan that addresses all areas of project management knowledge. The project history and the lessons learned database provides project managers with the information they need on specific needs for team skills, recruitment-specific employees, customer profiles, and the operating environment that can significantly impact the ultimate success or failure of the project. Historical information and lessons learned can be extremely useful to the project team in various phases of the project lifecycle.

5 Discussion: Cross-analysis of codes

To deepen the discussion of research questions, (QP1) What are the central themes of knowledge management in projects? and (QP2) What is the relationship between knowledge management and project performance? cross-analysis of codes were carried out.

QP1 can be answered through the data consolidated in core-periphery analysis of the sample articles, based on the codes of the generated schema. The core-periphery analysis corroborates the importance of the most frequent themes in Table 4, which are both types of knowledge (C1 and C2), the success dimensions of GP Efficiency (DDP1), and product / service success of the project (DDP2), Project Documentation (IE3), Knowledge sharing through coded forms (IT1), in the Service (S2) and Others (S4) sectors. However, the analysis goes further to show that these themes are strongly related in the literature with a core-periphery fit of 0.8852, as highlighted in Figure 4, between the central themes.

Figure 4
Core-periphery analysis of themes.

Regarding QP2, cross-data analysis (see Appendix B Appendix B - Cross-analysis according to the coding scheme C1 C2 IE2 IE2 IE3 IE4 IT1 IT2 IT3 IT4 DDP1 DDP2 DDP3 DDP4 DDP5 DDP6 DDP7 C1 28 16 6 2 9 2 17 2 13 5 14 14 6 9 4 0 1 C2 16 25 9 4 15 6 11 2 6 3 11 17 5 5 2 0 0 IE2 6 9 9 2 3 1 4 0 1 2 3 6 2 2 1 0 0 IE2 2 4 2 4 2 1 2 1 0 2 2 2 2 1 0 0 0 IE3 9 15 3 2 15 4 7 2 4 1 7 10 2 4 1 0 0 IE4 2 6 1 1 4 6 2 1 2 0 4 3 3 1 0 0 0 IT1 17 11 4 2 7 2 17 2 4 3 10 7 3 6 3 0 0 IT2 2 2 0 1 2 1 2 2 1 1 2 0 1 2 0 0 0 IT3 13 6 1 0 4 2 4 1 13 0 6 7 3 6 1 0 1 IT4 5 3 2 2 1 0 3 1 0 5 3 2 1 1 1 0 0 DDP1 14 11 3 2 7 4 10 2 6 3 17 4 3 6 0 0 0 DDP2 14 17 6 2 10 3 7 0 7 2 4 21 5 3 2 0 0 DDP3 6 5 2 2 2 3 3 1 3 1 3 5 9 1 1 0 0 DDP4 9 5 2 1 4 1 6 2 6 1 6 3 1 10 0 0 0 DDP5 4 2 1 0 1 0 3 0 1 1 0 2 1 0 4 0 1 DDP6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DDP7 1 0 0 0 0 0 0 0 1 0 0 0 0 0 1 0 1 ) revealed the relationships between key knowledge management themes and project performance, giving insights to the conceptual framework of Figure 5.

Figure 5
Network of reference co-citation.

It is possible to observe in Figure 4 that, except for the DDP6 dimension, the others have connections with both tacit (C1) and explicit knowledge (C2).

6 Conclusions

This article contributes to the literature in two ways. First, the results identified the main strategies to deal with tacit and explicit knowledge, which are experts’ knowledge acquisition and project documentation through coded forms, respectively. Both types of knowledge, tacit and explicit, are strongly related to two of the project success dimensions: GP efficiency and success of the product/service. Second, it was possible to establish the relationship between the variables of the coding system to propose a conceptual framework to guide future research.

In the publications, the topics project management, knowledge management and performance were found to be still poorly related, making it a challenging field for future studies.

A number of organizations were verified to already recognize the relevance of these assets, but have not implemented it in a systemic way, thus finding barriers to associate them with success. This study also has a practical contribution, since it can help project managers to more effectively coordinate the implementation of knowledge management and / or to better understand the benefits and challenges of knowledge management in this context. In addition, the work brings insights that knowledge management is related to project success, helping to motivate practitioners and organizations to make efforts towards knowledge management.

Another contribution of this article is the data analysis method itself, which is structured and, thus, replicable to other themes. However, these methodological choices bring limitations to research. The sample is limited by using a single selected database; also, search strings and inclusion and exclusion criteria for articles may have limited the sample. The inherent subjectivity of the process of analyzing the coding of the literature by the researchers may bias the analysis. Finally, our suggestion is that the discussion between the relationships of the coded themes, particularly regarding the relationship between knowledge management and project management, be explored in field studies, promoting contextualization of the results from case studies and advancing the operationalization of the variables in survey-type confirmatory studies.

Appendix A - Content Analysis Summary

Code C1 C2 C3 C4 C5 C6 C7 C8
Reference TE1 TE2 TE3 TE4 TE5 TE6 TE7 TE8 A1 A2 A3 NA1 NA2 NA3 S1 S2 S3 S4 C1 C2 IE2 IE2 IE3 IE4 IT1 IT2 IT3 IT4 DDP1 DDP2 DDP3 DDP4 DDP5 DDP6 DDP7
Zhang & Wang (2017) 1 1 1 1 1 1 1 1
Suresh et al. (2017) 1 1 1 1 1 1 1 1 1 1
McClory et al. (2017)McClory, S., Read, M., & Labib, A. (2017). Conceptualising the lessons-learned process in project management: towards a triple-loop learning framework. International Journal of Project Management, 35(7), 1322-1335. http://dx.doi.org/10.1016/j.ijproman.2017.05.006.
http://dx.doi.org/10.1016/j.ijproman.201...
1 1 1 1 1 1 1 1 1 1 1
Oun et al. (2016)Oun, T. A., Blackburn, T. D., Olson, B. A., Blessner, P., & George, T. (2016). An enterprise-wide knowledge management approach to project management. Engineering Management Journal, 28(3), 179-192. http://dx.doi.org/10.1080/10429247.2016.1203715.
http://dx.doi.org/10.1080/10429247.2016....
1 1 1 1 1 1 1 1 1
Nkuruziza et al. (2016)Nkuruziza, G., Kasekende, F., Otengei, S. O., Mujabi, S., & Ntayi, J. M. (2016). An investigation of key predictors of performance of agricultural projects in Sub-Saharan Africa: A case of Uganda. International Journal of Social Economics, 43(7), 676-691. http://dx.doi.org/10.1108/IJSE-09-2014-0181.
http://dx.doi.org/10.1108/IJSE-09-2014-0...
1 1 1 1 1 1 1 1
Addis (2016)Addis, M. (2016). Tacit and explicit knowledge in construction management. Construction Management and Economics, 34(7-8), 439-445. http://dx.doi.org/10.1080/01446193.2016.1180416.
http://dx.doi.org/10.1080/01446193.2016....
1 1 1 1 1 1 1 1 1
Spalek (2015)Spalek, S. (2015). Establishing a conceptual model for assessing project management maturity in industrial companies. International Journal of Industrial Engineering, 22(2) 1 1 1 1 1 1 1
Olayinka et al. (2015)Olayinka, R., Suresh, S., & Chinyio, E. (2015). Impact of knowledge management on the cost of poor quality. Proceedings of the Institution of Civil Engineers-Management, Procurement and Law, 168(4), 177-188. http://dx.doi.org/10.1680/mpal.1400035.
http://dx.doi.org/10.1680/mpal.1400035...
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Oluikpe (2015)Oluikpe, P. I. (2015). Knowledge creation and utilization in project teams. Journal of Knowledge Management, 19(2), 351-371. http://dx.doi.org/10.1108/JKM-06-2014-0214.
http://dx.doi.org/10.1108/JKM-06-2014-02...
1 1 1 1 1 1 1 1 1 1 1
Chandrasekaran & Linderman (2015)Chandrasekaran, A., & Linderman, K. (2015). Managing knowledge creation in High-Tech R & D Projects: A multimethod study. Decision Sciences, 46(2), 267-300. 1 1 1 1 1 1 1 1 1 1 1
Todorovic et al. (2015)Todorović, M. L., Petrović, D. Č., Mihić, M. M., Obradović, V. L., & Bushuyev, S. D. (2015). Project success analysis framework: A knowledge-based approach in project management. International Journal of Project Management, 33(4), 772-783. http://dx.doi.org/10.1016/j.ijproman.2014.10.009.
http://dx.doi.org/10.1016/j.ijproman.201...
1 1 1 1 1 1 1 1 1 1
Savolainen & Ahonen (2015)Savolainen, P., & Ahonen, J. J. (2015). Knowledge lost: Challenges in changing project manager between sales and implementation in software projects. JPMA, 33(1), 92-102. http://dx.doi.org/10.1016/j.ijproman.2014.04.003.
http://dx.doi.org/10.1016/j.ijproman.201...
1 1 1 1 1 1 1 1 1 1 1
Lee et al. (2014)Lee, J., Lee, H., & Park, J. (2014). Exploring the impact of empowering leadership on knowledge sharing, absorptive capacity and team performance in IT service. Information Technology & People, 27(3), 366-386. http://dx.doi.org/10.1108/ITP-10-2012-0115.
http://dx.doi.org/10.1108/ITP-10-2012-01...
1 1 1 1 1 1 1 1
Reich et al. (2014)Reich, B. H., Gemino, A., & Sauer, C. (2014). How knowledge management impacts performance in projects: an empirical study. International Journal of Project Management, 32(4), 590-602. http://dx.doi.org/10.1016/j.ijproman.2013.09.004.
http://dx.doi.org/10.1016/j.ijproman.201...
1 1 1 1 1 1 1 1 1
Park & Lee (2014)Park, J., & Lee, J. (2014). Knowledge sharing in information systems development projects: explicating the role of dependence and trust. JPMA, 32(1), 153-165. http://dx.doi.org/10.1016/j.ijproman.2013.02.004.
http://dx.doi.org/10.1016/j.ijproman.201...
1 1 1 1 1 1 1 1 1
Lech (2014)Lech, P. (2014). Managing knowledge in IT projects: a framework for enterprise system implementation. Journal of Knowledge Management, 18(3), 551-573. http://dx.doi.org/10.1108/JKM-01-2014-0006.
http://dx.doi.org/10.1108/JKM-01-2014-00...
1 1 1 1 1 1 1
Zangiski et al. (2013)Zangiski, M. A. D. S. G., de Lima, E. P., & da Costa, S. E. G. (2013). Organizational competence building and development: contributions to operations management. International Journal of Production Economics, 144(1), 76-89. http://dx.doi.org/10.1016/j.ijpe.2013.01.021.
http://dx.doi.org/10.1016/j.ijpe.2013.01...
1 1 1 1 1 1 1 1
Palacios-Marques et al. (2013)Palacios-Marqués, D., Cortés-Grao, R., & Carral, C. L. (2013). Outstanding knowledge competences and web 2.0 practices for developing successful e-learning project management. International Journal of Project Management, 31(1), 14-21. http://dx.doi.org/10.1016/j.ijproman.2012.08.002.
http://dx.doi.org/10.1016/j.ijproman.201...
1 1 1 1 1 1 1 1
Reich et al. (2012)Reich, B. H., Gemino, A., & Sauer, C. (2012). Knowledge management and project-based knowledge in it projects: A model and preliminary empirical results. International Journal of Project Management, 30(6), 663-674. http://dx.doi.org/10.1016/j.ijproman.2011.12.003.
http://dx.doi.org/10.1016/j.ijproman.201...
1 1 1 1 1 1 1 1
Sáenz et al. (2012)Sáenz, J., Aramburu, N., & Blanco, C. E. (2012). Knowledge sharing and innovation in Spanish and Colombian high-tech firms. Journal of Knowledge Management, 16(6), 919-933. http://dx.doi.org/10.1108/13673271211276191.
http://dx.doi.org/10.1108/13673271211276...
1 1 1 1 1 1 1 1 1 1
Reference TE1 TE2 TE3 TE4 TE5 TE6 TE7 TE8 A1 A2 A3 NA1 NA2 NA3 S1 S2 S3 S4 C1 C2 IE2 IE2 IE3 IE4 IT1 IT2 IT3 IT4 DDP1 DDP2 DDP3 DDP4 DDP5 DDP6 DDP7
Liu (2011)Liu, P. L. (2011). Empirical study on influence of critical success factors on ERP knowledge management on management performance in high-tech industries in Taiwan. Expert Systems with Applications, 38(8), 10696-10704. http://dx.doi.org/10.1016/j.eswa.2011.02.045.
http://dx.doi.org/10.1016/j.eswa.2011.02...
1 1 1 1 1 1 1 1 1
Lindner & Wald (2011)Lindner, F., & Wald, A. (2011). Success factors of knowledge management in temporary organizations. JPMA, 29(7), 877-888. http://dx.doi.org/10.1016/j.ijproman.2010.09.003.
http://dx.doi.org/10.1016/j.ijproman.201...
1 1 1 1 1 1 1 1 1 1 1 1
Ajmal et al. (2010)Ajmal, M., Helo, P., & Kekäle, T. (2010). Critical factors for knowledge management in project business. Journal of Knowledge Management, 14(1), 156-168. http://dx.doi.org/10.1108/13673271011015633.
http://dx.doi.org/10.1108/13673271011015...
1 1 1 1 1 1 1 1 1
Han & Park (2009)Han, K. H., & Park, J. W. (2009). Expert Systems with Applications Process-centered knowledge model and enterprise ontology for the development of knowledge management system. Expert Systems with Applications, 36(4), 7441-7447. http://dx.doi.org/10.1016/j.eswa.2008.09.031.
http://dx.doi.org/10.1016/j.eswa.2008.09...
1 1 1 1 1 1 1 1 1 1
Hanisch et al. (2009)Hanisch, B., Lindner, F., Mueller, A., & Wald, A. (2009). Knowledge management in project environments. Journal of Knowledge Management, 13(4), 148-160. http://dx.doi.org/10.1108/13673270910971897.
http://dx.doi.org/10.1108/13673270910971...
1 1 1 1 1 1 1 1 1 1
Landaeta (2008)Landaeta, R. E. (2008). Evaluating benefits and challenges of knowledge transfer across projects. Engineering Management Journal, 20(1), 29-38. http://dx.doi.org/10.1080/10429247.2008.11431753.
http://dx.doi.org/10.1080/10429247.2008....
1 1 1 1 1 1 1 1 1 1 1
Xu & Ramesh (2008)Xu, P., & Ramesh, B. (2008). Impact of knowledge support on the performance of software process tailoring. Journal of Management Information Systems, 25(3), 277-314. http://dx.doi.org/10.2753/MIS0742-1222250308.
http://dx.doi.org/10.2753/MIS0742-122225...
1 1 1 1 1 1 1 1 1 1 1
Akgun et al. (2008)Akgün, A. E., Dayan, M., & Di Benedetto, A. (2008). New product development team intelligence: antecedents and consequences. Information & Management, 45(4), 221-226. http://dx.doi.org/10.1016/j.im.2008.02.004.
http://dx.doi.org/10.1016/j.im.2008.02.0...
1 1 1 1 1 1 1 1
Anbari et al. (2008)Anbari, F. T., Carayannis, E. G., & James, R. (2008). Post-project reviews as a key project management competence, Technovation, 28, 633-643. https://doi.org/10.1016/j.technovation.2007.12.001
https://doi.org/10.1016/j.technovation.2...
1 1 1 1 1 1 1 1 1 1 1
Hong et al. (2008)Hong, H. K., Kim, J. S., Kim, T., & Leem, B. H. (2008). The effect of knowledge on system integration project performance. Industrial Management & Data Systems, 108(3), 385-404. http://dx.doi.org/10.1108/02635570810858787.
http://dx.doi.org/10.1108/02635570810858...
1 1 1 1 1 1 1 1 1 1
Petter & Vaishnavi (2008)Petter, S., & Vaishnavi, V. (2008). Facilitating experience reuse among software project managers. Information Sciences, 178(7), 1783-1802. http://dx.doi.org/10.1016/j.ins.2007.11.020.
http://dx.doi.org/10.1016/j.ins.2007.11....
1 1 1 1 1 1 1 1 1 1 1
Sharif & Kayis (2007)Sharif, S. A., & Kayis, B. (2007). DSM as a knowledge capture tool in CODE environment. Journal of Intelligent Manufacturing, 18(4), 497-504. http://dx.doi.org/10.1007/s10845-007-0058-0.
http://dx.doi.org/10.1007/s10845-007-005...
1 1 1 1 1 1 1 1 1
Parolia et al. (2007)Parolia, N., Goodman, S., Li, Y., & Jiang, J. J. (2007). Mediators between coordination and IS project performance. Information & Management, 44(7), 635-645. http://dx.doi.org/10.1016/j.im.2007.06.003.
http://dx.doi.org/10.1016/j.im.2007.06.0...
1 1 1 1 1 1 1 1
Patnayakuni et al. (2007)Patnayakuni, R., Rai, A., & Tiwana, A. (2007). Systems development process improvement: A knowledge integration perspective. IEEE Transactions on Engineering Management, 54(2), 286-300. http://dx.doi.org/10.1109/TEM.2007.893997.
http://dx.doi.org/10.1109/TEM.2007.89399...
1 1 1 1 1 1 1
Suikki et al. (2006)Suikki, R., Tromstedt, R., & Haapasalo, H. (2006). Project management competence development framework in turbulent business environment. Technovation, 26(5-6), 723-738. http://dx.doi.org/10.1016/j.technovation.2004.11.003.
http://dx.doi.org/10.1016/j.technovation...
1 1 1 1 1 1 1 1 1
Hynes et al. (1999)Hynes, M. D., Getzin, S. A., McQuaid, L., Seward, C. M., Miller, N. L., & Field-Perez, R. R. (1999). Creation of a knowledge-based system to accelerate drug development. Drug Information Journal, 33(2), 641-648. http://dx.doi.org/10.1177/009286159903300234.
http://dx.doi.org/10.1177/00928615990330...
1 1 1 1 1 1 1
Collinson (1999)Collinson, S. (1999). Knowledge management capabilities for steel makers: A British-Japanese corporate alliance for organizational learning. Technology Analysis and Strategic Management, 11(3), 337-358. http://dx.doi.org/10.1080/095373299107393.
http://dx.doi.org/10.1080/09537329910739...
1 1 1 1 1 1 1 1 1 1 1 1 1 1

Appendix B - Cross-analysis according to the coding scheme

C1 C2 IE2 IE2 IE3 IE4 IT1 IT2 IT3 IT4 DDP1 DDP2 DDP3 DDP4 DDP5 DDP6 DDP7
C1 28 16 6 2 9 2 17 2 13 5 14 14 6 9 4 0 1
C2 16 25 9 4 15 6 11 2 6 3 11 17 5 5 2 0 0
IE2 6 9 9 2 3 1 4 0 1 2 3 6 2 2 1 0 0
IE2 2 4 2 4 2 1 2 1 0 2 2 2 2 1 0 0 0
IE3 9 15 3 2 15 4 7 2 4 1 7 10 2 4 1 0 0
IE4 2 6 1 1 4 6 2 1 2 0 4 3 3 1 0 0 0
IT1 17 11 4 2 7 2 17 2 4 3 10 7 3 6 3 0 0
IT2 2 2 0 1 2 1 2 2 1 1 2 0 1 2 0 0 0
IT3 13 6 1 0 4 2 4 1 13 0 6 7 3 6 1 0 1
IT4 5 3 2 2 1 0 3 1 0 5 3 2 1 1 1 0 0
DDP1 14 11 3 2 7 4 10 2 6 3 17 4 3 6 0 0 0
DDP2 14 17 6 2 10 3 7 0 7 2 4 21 5 3 2 0 0
DDP3 6 5 2 2 2 3 3 1 3 1 3 5 9 1 1 0 0
DDP4 9 5 2 1 4 1 6 2 6 1 6 3 1 10 0 0 0
DDP5 4 2 1 0 1 0 3 0 1 1 0 2 1 0 4 0 1
DDP6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
DDP7 1 0 0 0 0 0 0 0 1 0 0 0 0 0 1 0 1
  • Financial support: The authors acknowledge CNPq and CAPES for support.
  • How to cite: Favoretto, C., Carvalho, M. M. (2021). An analysis of the relationship between knowledge management and project performance: literature review and conceptual framework. Gestão & Produção, 28(1), e4888. http://dx.doi.org/10.1590/0104-530X4888-20

References

  • Addis, M. (2016). Tacit and explicit knowledge in construction management. Construction Management and Economics, 34(7-8), 439-445. http://dx.doi.org/10.1080/01446193.2016.1180416
    » http://dx.doi.org/10.1080/01446193.2016.1180416
  • Ajmal, M., Helo, P., & Kekäle, T. (2010). Critical factors for knowledge management in project business. Journal of Knowledge Management, 14(1), 156-168. http://dx.doi.org/10.1108/13673271011015633
    » http://dx.doi.org/10.1108/13673271011015633
  • Akgün, A. E., Dayan, M., & Di Benedetto, A. (2008). New product development team intelligence: antecedents and consequences. Information & Management, 45(4), 221-226. http://dx.doi.org/10.1016/j.im.2008.02.004
    » http://dx.doi.org/10.1016/j.im.2008.02.004
  • Ali, I., Musawir, A. U., & Ali, M. (2018). Impact of knowledge sharing and absorptive capacity on project performance: the moderating role of social processes. Journal of Knowledge Management, 22(2), 453-477. http://dx.doi.org/10.1108/JKM-10-2016-0449
    » http://dx.doi.org/10.1108/JKM-10-2016-0449
  • Anbari, F. T., Carayannis, E. G., & James, R. (2008). Post-project reviews as a key project management competence, Technovation, 28, 633-643. https://doi.org/10.1016/j.technovation.2007.12.001
    » https://doi.org/10.1016/j.technovation.2007.12.001
  • Andreeva, T., & Kianto, A. (2012). Does knowledge management really matter? Linking knowledge management practices, competitiveness and economic performance. Journal of Knowledge Management, 16(4), 617-636. http://dx.doi.org/10.1108/13673271211246185
    » http://dx.doi.org/10.1108/13673271211246185
  • Borgatti, S. P., Everett, M. G., & Freeman, L. C. (2002). Ucinet for Windows: Software for social network analysis Harvard, MA: Analytic Technologies. Recuperado em 14 de setembro de 2018, de https://sites.google.com/site/ucinetsoftware/home
    » https://sites.google.com/site/ucinetsoftware/home
  • Carvalho, M. M., Patah, L. A., & Souza Bido, D. (2015). Project management and its effects on project success: cross-country and cross-industry comparisons. International Journal of Project Management, 33(7), 1509-1522. http://dx.doi.org/10.1016/j.ijproman.2015.04.004
    » http://dx.doi.org/10.1016/j.ijproman.2015.04.004
  • Carvalho, M. M., Fleury, A., & Lopes, A. P. (2013). An overview of the literature on technology roadmapping (TRM): contributions and trends. Technological Forecasting and Social Change, 80(7), 1418-1437. http://dx.doi.org/10.1016/j.techfore.2012.11.008
    » http://dx.doi.org/10.1016/j.techfore.2012.11.008
  • Carvalho, M. M., & Rabechini, R., Jr. (2017). Can project sustainability management impact project success? An empirical study applying a contingent approach. International Journal of Project Management, 35(6), 1120-1132. http://dx.doi.org/10.1016/j.ijproman.2017.02.018
    » http://dx.doi.org/10.1016/j.ijproman.2017.02.018
  • Carvalho, M. M., & Rabechini, R., Jr. (2015). Fundamentos em gestão de projetos: construindo competências para gerenciar projetos São Paulo: Atlas
  • Chandrasekaran, A., & Linderman, K. (2015). Managing knowledge creation in High-Tech R & D Projects: A multimethod study. Decision Sciences, 46(2), 267-300.
  • Choi, B., & Lee, H. (2003). An empirical investigation of KM styles and their effect on corporate performance. Information & Management, 40(5), 403-417. http://dx.doi.org/10.1016/S0378-7206(02)00060-5
    » http://dx.doi.org/10.1016/S0378-7206(02)00060-5
  • Cohen, J. F., & Olsen, K. (2015). Expert Systems with Applications Knowledge management capabilities and firm performance: A test of universalistic, contingency and complementarity perspectives. Expert Systems with Applications, 42(3), 1178-1188. http://dx.doi.org/10.1016/j.eswa.2014.09.002
    » http://dx.doi.org/10.1016/j.eswa.2014.09.002
  • Collinson, S. (1999). Knowledge management capabilities for steel makers: A British-Japanese corporate alliance for organizational learning. Technology Analysis and Strategic Management, 11(3), 337-358. http://dx.doi.org/10.1080/095373299107393
    » http://dx.doi.org/10.1080/095373299107393
  • Cunha, J. A., Figueiredo, J., Matos, F., & Thomaz, J. (2014, September). Knowledge Management on PMO’s Perspective: A Systematic Review. In Proceedings of the European Conference on Knowledge Management (Vol. 1, p. 233). Santarém, Portugal: Academic Conferences International Limited.
  • Duffield, S. M., & Whitty, S. J. (2016). Application of the systemic lessons learned knowledge model for organisational learning through projects. International Journal of Project Management, 34(7), 1280-1293. http://dx.doi.org/10.1016/j.ijproman.2016.07.001
    » http://dx.doi.org/10.1016/j.ijproman.2016.07.001
  • Franco, E. F., Hirama, K., & Carvalho, M. M. (2018). Applying system dynamics approach in software and information system projects: A mapping study. Information and Software Technology, 93, 58-73. http://dx.doi.org/10.1016/j.infsof.2017.08.013
    » http://dx.doi.org/10.1016/j.infsof.2017.08.013
  • Grigoriou, K., & Rothaermel, F. T. (2017). Organizing for knowledge generation: Internal knowledge networks and the contingent effect of external knowledge sourcing. Strategic Management Journal, 38(2), 395-414. http://dx.doi.org/10.1002/smj.2489
    » http://dx.doi.org/10.1002/smj.2489
  • Han, K. H., & Park, J. W. (2009). Expert Systems with Applications Process-centered knowledge model and enterprise ontology for the development of knowledge management system. Expert Systems with Applications, 36(4), 7441-7447. http://dx.doi.org/10.1016/j.eswa.2008.09.031
    » http://dx.doi.org/10.1016/j.eswa.2008.09.031
  • Hanisch, B., Lindner, F., Mueller, A., & Wald, A. (2009). Knowledge management in project environments. Journal of Knowledge Management, 13(4), 148-160. http://dx.doi.org/10.1108/13673270910971897
    » http://dx.doi.org/10.1108/13673270910971897
  • Hong, H. K., Kim, J. S., Kim, T., & Leem, B. H. (2008). The effect of knowledge on system integration project performance. Industrial Management & Data Systems, 108(3), 385-404. http://dx.doi.org/10.1108/02635570810858787
    » http://dx.doi.org/10.1108/02635570810858787
  • Hynes, M. D., Getzin, S. A., McQuaid, L., Seward, C. M., Miller, N. L., & Field-Perez, R. R. (1999). Creation of a knowledge-based system to accelerate drug development. Drug Information Journal, 33(2), 641-648. http://dx.doi.org/10.1177/009286159903300234
    » http://dx.doi.org/10.1177/009286159903300234
  • Landaeta, R. E. (2008). Evaluating benefits and challenges of knowledge transfer across projects. Engineering Management Journal, 20(1), 29-38. http://dx.doi.org/10.1080/10429247.2008.11431753
    » http://dx.doi.org/10.1080/10429247.2008.11431753
  • Lech, P. (2014). Managing knowledge in IT projects: a framework for enterprise system implementation. Journal of Knowledge Management, 18(3), 551-573. http://dx.doi.org/10.1108/JKM-01-2014-0006
    » http://dx.doi.org/10.1108/JKM-01-2014-0006
  • Lee, J., Lee, H., & Park, J. (2014). Exploring the impact of empowering leadership on knowledge sharing, absorptive capacity and team performance in IT service. Information Technology & People, 27(3), 366-386. http://dx.doi.org/10.1108/ITP-10-2012-0115
    » http://dx.doi.org/10.1108/ITP-10-2012-0115
  • Lindhard, S., & Larsen, J. K. (2016). Identifying the key process factors affecting project performance. Engineering, Construction, and Architectural Management, 23(5), 657-673. http://dx.doi.org/10.1108/ECAM-08-2015-0123
    » http://dx.doi.org/10.1108/ECAM-08-2015-0123
  • Lindner, F., & Wald, A. (2011). Success factors of knowledge management in temporary organizations. JPMA, 29(7), 877-888. http://dx.doi.org/10.1016/j.ijproman.2010.09.003
    » http://dx.doi.org/10.1016/j.ijproman.2010.09.003
  • Liu, P. L. (2011). Empirical study on influence of critical success factors on ERP knowledge management on management performance in high-tech industries in Taiwan. Expert Systems with Applications, 38(8), 10696-10704. http://dx.doi.org/10.1016/j.eswa.2011.02.045
    » http://dx.doi.org/10.1016/j.eswa.2011.02.045
  • López-Nicolás, C., & Merono-Cerdán, Á. L. (2011). Strategic knowledge management, innovation and performance. International Journal of Information Management, 31(6), 502-509. http://dx.doi.org/10.1016/j.ijinfomgt.2011.02.003
    » http://dx.doi.org/10.1016/j.ijinfomgt.2011.02.003
  • McClory, S., Read, M., & Labib, A. (2017). Conceptualising the lessons-learned process in project management: towards a triple-loop learning framework. International Journal of Project Management, 35(7), 1322-1335. http://dx.doi.org/10.1016/j.ijproman.2017.05.006
    » http://dx.doi.org/10.1016/j.ijproman.2017.05.006
  • Nkuruziza, G., Kasekende, F., Otengei, S. O., Mujabi, S., & Ntayi, J. M. (2016). An investigation of key predictors of performance of agricultural projects in Sub-Saharan Africa: A case of Uganda. International Journal of Social Economics, 43(7), 676-691. http://dx.doi.org/10.1108/IJSE-09-2014-0181
    » http://dx.doi.org/10.1108/IJSE-09-2014-0181
  • Nonaka, I., & Takeuchi, H. (1995). The knowledge-creating company: How Japanese companies create the dynamics of innovation. New York: Oxford University Press.
  • Olayinka, R., Suresh, S., & Chinyio, E. (2015). Impact of knowledge management on the cost of poor quality. Proceedings of the Institution of Civil Engineers-Management, Procurement and Law, 168(4), 177-188. http://dx.doi.org/10.1680/mpal.1400035
    » http://dx.doi.org/10.1680/mpal.1400035
  • Oluikpe, P. I. (2015). Knowledge creation and utilization in project teams. Journal of Knowledge Management, 19(2), 351-371. http://dx.doi.org/10.1108/JKM-06-2014-0214
    » http://dx.doi.org/10.1108/JKM-06-2014-0214
  • Oun, T. A., Blackburn, T. D., Olson, B. A., Blessner, P., & George, T. (2016). An enterprise-wide knowledge management approach to project management. Engineering Management Journal, 28(3), 179-192. http://dx.doi.org/10.1080/10429247.2016.1203715
    » http://dx.doi.org/10.1080/10429247.2016.1203715
  • Palacios-Marqués, D., Cortés-Grao, R., & Carral, C. L. (2013). Outstanding knowledge competences and web 2.0 practices for developing successful e-learning project management. International Journal of Project Management, 31(1), 14-21. http://dx.doi.org/10.1016/j.ijproman.2012.08.002
    » http://dx.doi.org/10.1016/j.ijproman.2012.08.002
  • Park, J., & Lee, J. (2014). Knowledge sharing in information systems development projects: explicating the role of dependence and trust. JPMA, 32(1), 153-165. http://dx.doi.org/10.1016/j.ijproman.2013.02.004
    » http://dx.doi.org/10.1016/j.ijproman.2013.02.004
  • Parolia, N., Goodman, S., Li, Y., & Jiang, J. J. (2007). Mediators between coordination and IS project performance. Information & Management, 44(7), 635-645. http://dx.doi.org/10.1016/j.im.2007.06.003
    » http://dx.doi.org/10.1016/j.im.2007.06.003
  • Patnayakuni, R., Rai, A., & Tiwana, A. (2007). Systems development process improvement: A knowledge integration perspective. IEEE Transactions on Engineering Management, 54(2), 286-300. http://dx.doi.org/10.1109/TEM.2007.893997
    » http://dx.doi.org/10.1109/TEM.2007.893997
  • Petter, S., & Vaishnavi, V. (2008). Facilitating experience reuse among software project managers. Information Sciences, 178(7), 1783-1802. http://dx.doi.org/10.1016/j.ins.2007.11.020
    » http://dx.doi.org/10.1016/j.ins.2007.11.020
  • Project Management Institute. (2017). A guide to the project management body of knowledge (PMBOK® guide) (6th ed.). Newtown Square: PMI.
  • Reich, B. H., Gemino, A., & Sauer, C. (2014). How knowledge management impacts performance in projects: an empirical study. International Journal of Project Management, 32(4), 590-602. http://dx.doi.org/10.1016/j.ijproman.2013.09.004
    » http://dx.doi.org/10.1016/j.ijproman.2013.09.004
  • Reich, B. H., Gemino, A., & Sauer, C. (2012). Knowledge management and project-based knowledge in it projects: A model and preliminary empirical results. International Journal of Project Management, 30(6), 663-674. http://dx.doi.org/10.1016/j.ijproman.2011.12.003
    » http://dx.doi.org/10.1016/j.ijproman.2011.12.003
  • Sáenz, J., Aramburu, N., & Blanco, C. E. (2012). Knowledge sharing and innovation in Spanish and Colombian high-tech firms. Journal of Knowledge Management, 16(6), 919-933. http://dx.doi.org/10.1108/13673271211276191
    » http://dx.doi.org/10.1108/13673271211276191
  • Savolainen, P., & Ahonen, J. J. (2015). Knowledge lost: Challenges in changing project manager between sales and implementation in software projects. JPMA, 33(1), 92-102. http://dx.doi.org/10.1016/j.ijproman.2014.04.003
    » http://dx.doi.org/10.1016/j.ijproman.2014.04.003
  • Sharif, S. A., & Kayis, B. (2007). DSM as a knowledge capture tool in CODE environment. Journal of Intelligent Manufacturing, 18(4), 497-504. http://dx.doi.org/10.1007/s10845-007-0058-0
    » http://dx.doi.org/10.1007/s10845-007-0058-0
  • Spalek, S. (2015). Establishing a conceptual model for assessing project management maturity in industrial companies. International Journal of Industrial Engineering, 22(2)
  • Storey, C., & Hull, F. M. (2010). Service development success: A contingent approach by knowledge strategy. Journal of Service Management, 21(2), 140-161. http://dx.doi.org/10.1108/09564231011039268
    » http://dx.doi.org/10.1108/09564231011039268
  • Suikki, R., Tromstedt, R., & Haapasalo, H. (2006). Project management competence development framework in turbulent business environment. Technovation, 26(5-6), 723-738. http://dx.doi.org/10.1016/j.technovation.2004.11.003
    » http://dx.doi.org/10.1016/j.technovation.2004.11.003
  • Suresh, S., Olayinka, R., Chinyio, E., & Renukappa, S. (2016). Impact of knowledge management on construction projects. Proceedings of the Institution of Civil Engineers-Management, Procurement and Law, 170(1): 27-48.
  • Todorović, M. L., Petrović, D. Č., Mihić, M. M., Obradović, V. L., & Bushuyev, S. D. (2015). Project success analysis framework: A knowledge-based approach in project management. International Journal of Project Management, 33(4), 772-783. http://dx.doi.org/10.1016/j.ijproman.2014.10.009
    » http://dx.doi.org/10.1016/j.ijproman.2014.10.009
  • Xu, P., & Ramesh, B. (2008). Impact of knowledge support on the performance of software process tailoring. Journal of Management Information Systems, 25(3), 277-314. http://dx.doi.org/10.2753/MIS0742-1222250308
    » http://dx.doi.org/10.2753/MIS0742-1222250308
  • Yap, J. B. H., Abdul-rahman, H., & Chen, W. (2017). Collaborative model: managing design changes with reusable project experiences through project learning and effective communication. International Journal of Project Management, 35(7), 1253-1271. http://dx.doi.org/10.1016/j.ijproman.2017.04.010
    » http://dx.doi.org/10.1016/j.ijproman.2017.04.010
  • Zangiski, M. A. D. S. G., de Lima, E. P., & da Costa, S. E. G. (2013). Organizational competence building and development: contributions to operations management. International Journal of Production Economics, 144(1), 76-89. http://dx.doi.org/10.1016/j.ijpe.2013.01.021
    » http://dx.doi.org/10.1016/j.ijpe.2013.01.021
  • Zhang, J., Li, H., & Wang, S. H. (2017). Analysis and Potential application of the maturity of growth management in the developing construction industry of a Province of China: A case study. Sustainability, 9(1), 1-36. https://doi.org/10.3390/su9010143.
    » https://doi.org/10.3390/su9010143

Publication Dates

  • Publication in this collection
    13 Jan 2021
  • Date of issue
    2021

History

  • Received
    01 June 2018
  • Accepted
    14 Sept 2018
Universidade Federal de São Carlos Departamento de Engenharia de Produção , Caixa Postal 676 , 13.565-905 São Carlos SP Brazil, Tel.: +55 16 3351 8471 - São Carlos - SP - Brazil
E-mail: gp@dep.ufscar.br