The relationship between project management and digital transformation: Systematic literature review

A relação entre gerenciamento de projetos e transformação digital: Revisão sistemática da literatura

ABSTRACT

Purpose:

This article aims to investigate the relationship between project management (PM) and digital transformation (DT) in organizations.

Originality/value:

This article contributes to expanding the knowledge of the relationship between PM and DT, indicating that PM and its different approaches are used strategically to enable DT implementation in organizations. In addition, it is evidenced that DT demands individuals with technical and behavioral competencies to work in innovative and rapid organizational, cultural, and technological contexts arising from adopting new digital technologies.

Design/methodology/approach:

The research is characterized as exploratory with a qualitative approach. The methodology adopted was the systematic literature review and sought to understand the relationship and convergence between PM and DT. The research was carried out broadly, and the articles were selected on the Web of Science, Scopus, and Google Scholar bases, forming the analysis corpus with 104 articles published from 2015 to 2020.

Findings:

The results converged in the composition of four factors: competencies; strategy; digital technologies; and portfolio, programs, and projects, demonstrating the evolutionary and adaptive capacity of PM to support major changes such as DT.

KEYWORDS:
digital transformation; project management; digital technologies; skills; strategies

RESUMO

Objetivo:

Este artigo tem como objetivo investigar a relação entre o gerenciamento de projetos (GP) e a transformação digital (TD) nas organizações.

Originalidade/valor:

Este trabalho contribui para ampliar o conhecimento da relação existente entre o GP e a TD, indicando que o GP e suas diferentes abordagens são utilizados de forma estratégica para viabilizar a execução da TD nas organizações. Além disso, é evidenciado que a TD demanda indivíduos com competências técnicas e comportamentais para trabalharem em contextos inovadores e de rápidas mudanças organizacionais, culturais e tecnológicas, advindas com a adoção de novas tecnologias digitais.

Design/metodologia/abordagem:

A pesquisa é caracterizada como exploratória com abordagem qualitativa. A metodologia adotada foi a revisão sistemática da literatura, e busca compreender a relação e a convergência entre o GP e a TD. A pesquisa foi realizada de forma ampla e os artigos foram selecionados nas bases Web of Science, Scopus e Google Scholar, formando o corpus de análise com 104 artigos publicados no período de 2015 a 2020.

Resultados:

Os resultados convergiram para a formação de quatro fatores: competências; estratégia; tecnologias digitais; e portfólio, programas e projetos, demonstrando a capacidade evolutiva e adaptativa do GP para suportar grandes mudanças, como a TD.

PALAVRAS-CHAVE:
transformação digital; gerenciamento de projetos; tecnologias digitais; competências e estratégias

INTRODUCTION

Digital transformation (DT) presents several challenges for organizations and is considered a critical issue (Fitzgerald et al., 2014Fitzgerald, M., Kruschwitz, N., Bonnet, D., & Welch, M. (2014). Embracing digital technology: A new strategic imperative. MITSloan Management Review. https://sloanreview.mit.edu/projects/embracing-digital-technology/
https://sloanreview.mit.edu/projects/emb...
). However, it is still not widely dominated or known about its characteristics and how they contribute to the practice of performing DT at the organizational level (Berghaus & Back, 2016Berghaus, S., & Back, A. (2016). Stages in digital business transformation: Results of an empirical maturity study. MCIS, 22.; Chanias et al., 2019Chanias, S., Myers, M. D., & Hess, T. (2019). Digital transformation strategy making in pre-digital organizations: The case of a financial services provider. The Journal of Strategic Information Systems, 28(1), 17–33. https://doi.org/10.1016/j.jsis.2018.11.003
https://doi.org/10.1016/j.jsis.2018.11.0...
). Besides, DT is a subject that arouses community interest in strategic issues related to business digitalization that require leadership involvement and support to make changes, promote capabilities and leverage its competitiveness and innovation level amid risks (Kane et al., 2015Kane, G. C., Palmer, D., Phillips, A. N., Kiron, D., & Buckley, N. (2015). Strategy, not technology, drives digital transformation. MIT Sloan Management Review and Deloitte University Press, 14, 1–25. http://sloanreview.mit.edu/projects/strategy-drives-digital-transformation/
http://sloanreview.mit.edu/projects/stra...
).

Research conducted by Bilgeri et al. (2017)Bilgeri, D., Wortmann, F., & Fleisch, E. (2017). How digital transformation affects large manufacturing companies’ organization [Paper presentation]. Thirty Eighth International Conference on Information Systems, South Korea (pp. 1–9). http://cocoa.ethz.ch/downloads/2018/01/2360_3_Bilgeri%20et%20al._2017_IoT%20Organization%20of%20Large%20Manufacturing%20Companies.pdf
http://cocoa.ethz.ch/downloads/2018/01/2...
identified six main reasons why DT would affect the overall organizational structure in large manufacturing companies. The highlighted one lies in its executives’ uncertainty about where and how to allocate and align digital capabilities within their organizational structures. Ismail Abdelaal et al. (2017)Ismail Abdelaal, M. H., Khater, M., & Zaki, M. (2017). Digital business transformation and strategy: What do we know so far? Cambridge Service Alliance. http://dx.doi.org/10.13140/RG.2.2.36492.62086
http://dx.doi.org/10.13140/RG.2.2.36492....
also approached the factors that challenge leaders to perform DT from a strategic and managerial point of view. They underlined factors such as lack of clarity, sense of urgency, vision, direction, organizational aspects related to workers’ attitudes, legacy technology, politics, and other factors that challenge leaders to perform DT.

The dynamic in the company is often affected by the changes arising from DT. The convergence and adoption of new digital technologies address performance increase, competitive advantages, and transformation of various organizational aspects such as the business model, the customer experience, the operational model and its processes, social factors related to competencies, talents, culture, and value system (Downes & Nunes, 2013Downes, L., & Nunes, P. (2013). Big-bang disruption. Harvard Business Review, 44–56.). This context supports a growing research interest that highlights the use of projects to generate organizational changes (Crawford & Nahmias, 2010Crawford, L., & Nahmias, A. H. (2010). Competencies for managing change. International Journal of Project Management, 28(4), 405–412. https://doi.org/10.1016/j.ijproman.2010.01.015
https://doi.org/10.1016/j.ijproman.2010....
). Organizations must use projects to deliver change and bring success (Parker et al., 2013Parker, D., Charlton, J., Ribeiro, A., & Pathak, R. D. (2013). Integration of project-based management and change management: Intervention methodology. International Journal of Productivity and Performance Management, 62(5), 534–544. https://doi.org/10.1108/IJPPM-10-2012-0108
https://doi.org/10.1108/IJPPM-10-2012-01...
), incorporating elements that require effective change management and influential leadership to successfully implement projects and initiatives (Müller & Jugdev, 2012Müller, R., & Jugdev, K. (2012). Critical success factors in projects: Pinto, Slevin, and Prescott-The elucidation of project success. International Journal of Managing Projects in Business, 5(4), 757–775.).

The essence of project management (PM) is to support the execution of an organization’s strategy to achieve results beyond its competitors (Milosevic & Srivannaboon, 2006Milosevic, D. Z., & Srivannaboon, S. (2006). A theoretical framework for aligning project management with business strategy. Project Management to Business Strategy, 37(3), 98–110. https://doi.org/10.1177/875697280603700310
https://doi.org/10.1177/8756972806037003...
). Svejvig and Andersen (2015)Svejvig, P., & Andersen, P. (2015). Rethinking project management: A structured literature review with a critical look at the brave new world. International Journal of Project Management, 33(2), 278–290. https://doi.org/10.1016/j.ijproman.2014.06.004
https://doi.org/10.1016/j.ijproman.2014....
show the importance of PM for topics related to strategic changes, innovation to generate competitive advantages, resource optimization, and increased efficiency. These needs suggest the PM’s evolution as a discipline supporting organizational, financial, technological, scientific, and social needs (Geraldi & Söderlund, 2018Geraldi, J., & Söderlund, J. (2018). Project studies: What it is, where it is going. International Journal of Project Management, 36(1), 55-70. https://doi.org/10.1016/j.ijproman.2017.06.004
https://doi.org/10.1016/j.ijproman.2017....
).

Due to DT being broad and demanding the involvement of the entire organization (Gimpel et al., 2018Gimpel, H., Hosseini, S., Huber, R., Probst, L., Röglinger, M., & Faisst, U. (2018). Structuring digital transformation: A framework of action fields and its application at ZEISS. Journal of Information Technology Theory and Application, 19(1), 31-54. https://aisel.aisnet.org/cgi/viewcontent.cgi?article=1726&context=jitta
https://aisel.aisnet.org/cgi/viewcontent...
), the use of projects could be necessary to change organizational and technological aspects as well as redefine the value proposition (Wessel et al., 2021Wessel, L., Baiyere, A., Ologeanu-Taddei, R., Cha, J., & Jensen, TB. (2021). Unpacking the difference between digital transformation and IT-enabled organizational transformation. Journal of the Association for Information Systems, 22(1), 102-129. https://doi.org/10.17705/1jais.00655
https://doi.org/10.17705/1jais.00655...
). In the context of DT, not all PM practices and approaches are adequate (Shenhar et al., 2001Shenhar, A. J., Dvir, D., Levy, O., & Maltz, A. C. (2001). Project success: A multidimensional strategic concept. Long Range Planning, 34(6), 699-725. https://doi.org/10.1016/S0024-6301(01)00097-8
https://doi.org/10.1016/S0024-6301(01)00...
). This makes it necessary to examine PM’s existing methods, focusing on DT, to recommend the most important contributions, suiting them to the diversity of projects that require different management practices (Henriette et al., 2015Henriette, E., Feki, M., & Boughzala, I. (2015). The shape of digital transformation: A systematic literature review [Paper presentation]. MCIS 2015 proceedings (vol. 10, pp. 431–443). https://aisel.aisnet.org/cgi/viewcontent.cgi?article=1027&context=mcis2015
https://aisel.aisnet.org/cgi/viewcontent...
).

Therefore, considering that DT associates aspects beyond the use of technology and includes organizational and strategic changes during DT projects, this study investigates the relationship between PM and DT in organizations. The following research question is proposed:

  • What is the relationship between project management and digital transformation in organizations?

To achieve the proposed objective and answer the research question, we performed a systematic literature review (SLR) to explore this relationship and identify the theme’s most treated subjects, current issues, and future perspectives.

METHODOLOGICAL PROCEDURES

This article aims to understand the relationship between PM and DT in organizations based on information acquired through literature mapping. According to Kitchenham and Charters (2007)Kitchenham, B., & Charters, S. (2007). Guidelines for performing systematic literature reviews in software engineering. University of Durkham. https://www.elsevier.com/__data/promis_misc/525444systematicreviewsguide.pdf
https://www.elsevier.com/__data/promis_m...
, literature mapping uses a broad review of studies already conducted on a given topic to raise evidence and help answer a specific research question. This study uses a qualitative approach of exploratory-descriptive type to elaborate on the research corpus and bring up the patterns discovered in the studies surveyed (Tranfield et al., 2003Tranfield, D., Denyer, D., & Smart, P. (2003). Towards a methodology for developing evidence-informed management knowledge by means of systematic review. British Journal of Management, 14(3), 207–222. https://doi.org/10.1111/1467-8551.00375
https://doi.org/10.1111/1467-8551.00375...
).

This research followed the stages of the protocol prescribed by Pollock and Berge (2018)Pollock, A., & Berge, E. (2018). How to do a systematic review. International Journal of Stroke, 13(2), 138–156. https://doi.org/10.1177/1747493017743796
https://doi.org/10.1177/1747493017743796...
to perform an SLR, being: 1. clarify research goals and objectives; 2. seek relevant research; 3. collect data; 4. assess the quality of studies; 5. synthesize the evidence; 6. interpret the findings. The first stage, guided by the research question, aims to answer the question: “What is the relationship between project management and digital transformation in organizations?”. Pollock and Berge (2018)Pollock, A., & Berge, E. (2018). How to do a systematic review. International Journal of Stroke, 13(2), 138–156. https://doi.org/10.1177/1747493017743796
https://doi.org/10.1177/1747493017743796...
prescribe a flow to assemble the final corpus of analysis, which consists of four phases: 1. identification; 2. screening; 3. eligibility; and 4. included (Figure 1).

Figure 1
Procedures used in the selection of articles

The identification phase, which comprises stage two of the protocol, used the electronic databases Scopus, Web of Science, and Google Scholar to seek relevant research. The definition process of the string used other terms associated with the DT and PM, but the results showed few relevant studies. The final form of the string was then a simple structure extended using an asterisk text mask (*). It was composed of the terms “Digit* transformat*” AND “project* manag*” to perform the search. We considered the operator “AND” and the asterisk text mask (*) to give amplitude to the investigation and bring up the junction of the terms and variability sought by the string.

Scopus, Web of Science, and Google databases were chosen to collect data (stage three); the Publish or Perish software was used to operationalize data collection in the Google Scholar database. The search for articles was conducted in September 2020.

Since it is a topic of recent interest, no time restrictions were used, bringing 1,152 articles without informing the period for the research. The objective was to search as many articles as possible to form the analysis corpus. Additionally, articles not written in English were excluded from the corpus; thus, 751 articles remained. We adopted conference papers and academic journals as the subject is a topic of recent publications. The objective was to build a corpus of analysis with the largest number of research on the topic. It is worth noting that conference articles were in the inclusion and exclusion criteria highlighted in the protocol of this literature review.

Figure 1 presents the steps followed for the final selection of articles that compose the corpus of analysis for this SLR and that used the orientations and stages shown in the work of Pollock and Berge (2018)Pollock, A., & Berge, E. (2018). How to do a systematic review. International Journal of Stroke, 13(2), 138–156. https://doi.org/10.1177/1747493017743796
https://doi.org/10.1177/1747493017743796...
.

The fourth stage of the protocol comprises the screening and eligibility phases. The screening phase aims to delimit the study to the research purpose. It was performed by reading the titles and abstracts and removing the repeated articles from the corpus, remaining 204 articles. In the third phase, eligibility, a complete reading of each piece was done in order to remove those papers whose content did not address the scope of the research, remaining a corpus formed by 104 articles.

The last phase, included, was a thorough reading of the 104 articles that form the final corpus of analysis, addressing the research objective of verifying PM and DT’s relationship in organizations. The article’s analysis used a Microsoft Excel spreadsheet to consolidate the findings, categorize them, and gather aspects to give meaning to the reviews, such as methodological procedures, objectives, research approach, results, limitations, and future studies.

The activities carried out reflect the stages and the sequence of the protocol prescribed by Pollock and Berge (2018)Pollock, A., & Berge, E. (2018). How to do a systematic review. International Journal of Stroke, 13(2), 138–156. https://doi.org/10.1177/1747493017743796
https://doi.org/10.1177/1747493017743796...
, that is: 5. synthesize the evidence and 6. interpret the findings and prioritize the treatment and qualitative analysis of the articles to consolidate the findings of the studies. The application of the method was audited by two researchers who took part in the study.

ANALYSIS OF RESULTS

Mapping articles

The corpus of analysis was generated for the beginning of the analyses after the filtering process of the articles. It is important to point out that there was no date filter in the search for articles. The first article within the context of this research was published in 2005. The selected articles comprise 104 articles published between 2015 and 2020. Out of this total, 60 appear in 47 journals, and the remaining 44 are posted in 38 various events, congresses, conventions, symposia, and conferences.

After the constitution of the database, the repeated articles were removed to guarantee the homogeneity of the analysis corpus. Next, the database was treated with the aid of Excel spreadsheets. This phase of the research also allowed us to present a relevant descriptive analysis of the study carried out.

We emphasize that the applied content analysis is in line with Bardin’s prescriptions (2011)Bardin, L. (2011). Content analysis. São Paulo: Edições, 70.. The selected articles were read in their entirety. Categories of analysis were sought that could help to understand the phenomenon researched. The categorization criteria were validated by all researchers and included in the Excel spreadsheet. The generated spreadsheet contains the metadata of the selected articles, as well as information about the categorization. After analyzing all the articles, the researchers sought convergences through a clustering process that allowed them to reach the categories presented in the next section.

When analyzing the number of studies published per year, we can see the growing interest in the theme: the most significant number of studies were published in 2019 (Figure 2). We point out that the 2020 period does not cover a full year, so it does not allow direct comparison with other periods.

Figure 2
Articles published by year

The selected studies were published between 2015 and 2020. They show a growing interest in the subject by scholars. After mapping the articles and performing a careful reading of each of them, it was possible to identify the connections between the contents and the authors, resulting in four categories consisting: 1. competencies, 2. digital technologies, 3. portfolio, programs, and projects, and 4. strategy. We emphasized that the categories presented emerged from the process of reading and categorizing the articles, as presented in Table 1.

Table 1
Factors

We emphasize that the categorization process is understood as an abstraction of the contents observed in the analysis corpus. Each category translates a set of meanings representing elements that will be explored in the presentation and discussion phase in the next section.

Four factors were found after performing a complete reading of the articles. The classification of the studies was tabulated in a spreadsheet. It is considered a cross-analysis of several sections of the article title, abstract, covered domains, objectives, approach to research, results, limitations, and future studies. This allowed the identification of the main aspects for categorization into the four factors.

The following section presents the identified factors’ discussion, explaining this research’s findings and their relationships.

DISCUSSION OF RESULTS

Competencies

Making a company fit for DT demands that competencies be incorporated at a strategic level (Azzouz & Papadonikolaki, 2020Azzouz, A., & Papadonikolaki, E. (2020). Boundary-spanning for managing digital innovation in the AEC sector. Architectural Engineering and Design Management, 16(5), 1–18. https://doi.org/10.1080/17452007.2020.1735293
https://doi.org/10.1080/17452007.2020.17...
) as a prerequisite in managers’ training (Azarenko et al., 2018Azarenko, N. Y., Mikheenko, O. V., Chepikova, E. M., & Kazakov, O. D. (2018). Formation of innovative mechanism of staff training in the conditions of digital transformation of economy. 2018 IEEE International Conference “Quality Management, Transport and Information Security, Information Technologies (IT&QM&IS)”, St. Petersburg, Russia (pp. 764–768). https://doi.org/10.1109/ITMQIS.2018.8525021.
https://doi.org/10.1109/ITMQIS.2018.8525...
; Bygstad et al., 2017Bygstad, B., Aanby, H.-P., & Iden, J. (2017). Leading digital transformation: The Scandinavian way. Scandinavian Conference on Information Systems (pp. 1–14). https://doi.org/10.1007/978-3-319-64695-4_1
https://doi.org/10.1007/978-3-319-64695-...
; Malmelin & Virta, 2016Malmelin, N., & Virta, S. (2016). MANAGING CREATIVITY IN CHANGE: Motivations and constraints of creative work in a media organisation. Journalism Practice, 10(8), 1041–1054. https://doi.org/10.1080/17512786.2015.1074864
https://doi.org/10.1080/17512786.2015.10...
) preparing these managers to be responsible for DT and guide the company in methods, tools, and expert processes (Wolff et al., 2020Wolff, C., Verenych, O., & Kevorkova, S. (2020, February 18-20). Digital transformation time: Research results for Ukrainian community [Paper presentation]. 1st International Workshop IT Project Management (ITPM), Lviv, Slavsko, (pp. 46-57). http://www.chrome-extension://efaidnbmnnnibpcajpcglclefind mkaj/http://ceur-ws.org/Vol-2565/paper5.pdf
http://www.chrome-extension://efaidnbmnn...
).

Individuals trained in managerial, personal, and behavioral topics are perceived as someone with a differential to conduct DT projects (Rojas & Mejıa-Moncayo, 2019Rojas, A. E., & Mejıa-Moncayo, C. (2019, November). Students’ perception of a postgraduate course in agile project management aimed at developing soft skills [Paper presentation]. CEUR Workshop Proceedings (pp. 194-204). http://ceur-ws.org/Vol-2486/icaiw_edusynergies_6.pdf
http://ceur-ws.org/Vol-2486/icaiw_edusyn...
), even with the participation of internal and external agents (Braun & Sydow, 2019Braun, T., & Sydow, J. (2019). Selecting organizational partners for interor-ganizational projects: The dual but limited role of digital capabilities in the construction industry. Project Management Journal, 50(4), 398–408. https://doi.org/10.1177/8756972819857477
https://doi.org/10.1177/8756972819857477...
). Technical skills and training in new technologies, such as the internet of things (IoT), are complementary skills to DT and pressing for companies to expand in the business of high competitiveness and innovation (Assante et al., 2020Assante, D., Fornaro, C., Castro, M., Martin, S., Leisenberg, M., & Kronsbein, P. (2020). Internet of Things: Three years of experience on education in the business sector. 2020 IEEE Global Engineering Education Conference (EDUCON), Porto, Portugal (pp. 1800–1806). https://doi.org/10.1109/EDUCON45650.2020.9125115
https://doi.org/10.1109/EDUCON45650.2020...
).

The organizational culture achieves digital excellence through the new technological capacities and changes undertaken to enable innovation, a new way of thinking, and the possibility of people venturing into new challenges with leadership support (Ngereja et al., 2020Ngereja, B., Hussein, B., Hafseld, K. H. J., & Wolff, C. (2020, March 05–07). A Retrospective Analysis of the Role of Soft Factors in Digitalization Projects: Based on a Case Study in a Public Health Organization in Trondheim-Norway. [Paper presentation]. 2020 IEEE European Technology and Engineering Management Summit (E-TEMS), Dortmund, Germany (pp. 1–7). https://doi.org/10.1109/E-TEMS46250.2020.9111790
https://doi.org/10.1109/E-TEMS46250.2020...
). Professionals who work with multiple PM frameworks to meet technological change projects are perceived as adaptable individuals with specific skills to work in high-performance teams, combining their talents to create innovative jobs (Demirkan & Spohrer, 2018Demirkan, H., & Spohrer, J. C. (2018). Commentary-Cultivating T-shaped professionals in the era of digital transformation. Service Science, 10(1), 98–109. https://doi.org/10.1287/serv.2017.0204
https://doi.org/10.1287/serv.2017.0204...
).

New digital skills demanded by the market may also impact DT processes (Betz et al., 2016Betz, C., Olagunju, A. O., & Paulson, P. (2016). The impacts of digital transformation, agile, and DevOps on future IT curricula. Proceedings of the 17th Annual Conference on Information Technology Education, Boston, Massachusetts, United States (pp. 106). https://dl.acm.org/doi/10.1145/2978192.2978205
https://dl.acm.org/doi/10.1145/2978192.2...
; Papadonikolaki et al., 2019Papadonikolaki, E., van Oel, C., & Kagioglou, M. (2019). Organising and Managing boundaries: A structurational view of collaboration with Building Information Modelling (BIM). International Journal of Project Management, 37(3), 378–394. https://doi.org/10.1016/j.ijproman.2019.01.010
https://doi.org/10.1016/j.ijproman.2019....
). These skills are demonstrated in the adoption of building information modeling (BIM) by sharing information in engineering projects that adopt agile project management (APM) and the need to inspire an agile culture in teams to gain acceptance and synergy (Silvaggi & Pesce, 2018Silvaggi, A., & Pesce, F. (2018). Job profiles for museums in the digital era: Research conducted in Portugal, Italy and Greece within the Mu. SA project. Journal of Cultural Management and Policy, 8(1), 56–69. https://www.encatc.org/media/4535-encatc_journal_vol8_issue1_silvaggi_pesce.pdf
https://www.encatc.org/media/4535-encatc...
). The different PM approaches, such as the APM, show that the lack of individuals with an adequate profile to act in the positions demanded by DT’s process may impact some sectors (Brunet-Thornton et al., 2019Brunet-Thornton, R., Cramer, T., & Jirsák, P. (2019). A research agenda on Czech attitudinal perspectives in an era of digital transformation. Journal of Eastern European and Central Asian Research, 6(1), 99–112. https://doi.org/10.15549/jeecar.v6i1.277
https://doi.org/10.15549/jeecar.v6i1.277...
). However, the impact of changes in the work environment and future trends in the PM field in terms of knowledge, skills, attributes, and experiences tend to be more appreciated (Walker & Lloyd-Walker, 2019Walker, D., & Lloyd-Walker, B. (2019). The future of the management of projects in the 2030s. International Journal of Managing Projects in Business, 12(2), 242-266. htps://doi.org/10.1108/IJMPB-02-2018-0034
htps://doi.org/10.1108/IJMPB-02-2018-003...
).

The proposition of frameworks appears with various purposes. In the questions of maturity assessment in DT, a framework is proposed for companies that need educational programs and certifications to manage DT, evaluating the competencies required based on a competencies model elaborated for DT (Wolff et al., 2020Wolff, C., Verenych, O., & Kevorkova, S. (2020, February 18-20). Digital transformation time: Research results for Ukrainian community [Paper presentation]. 1st International Workshop IT Project Management (ITPM), Lviv, Slavsko, (pp. 46-57). http://www.chrome-extension://efaidnbmnnnibpcajpcglclefind mkaj/http://ceur-ws.org/Vol-2565/paper5.pdf
http://www.chrome-extension://efaidnbmnn...
). Another proposition assesses digital excellence in hospitals, evaluating technological capabilities and non-technological aspects as enablers for digital change in each specific health system, aiming to develop PM skills and digital skills to support hospital teams (Krasuska et al., 2020Krasuska, M., Williams, R., Sheikh, A., Franklin, B. D., Heeney, C., Lane, W., Mozaffar, H., Mason, K., Eason, S., Hinder, S., Dunscombe, R., Potts, H. W. W., & Cresswell, K. (2020). Technological capabilities to assess digital excellence in hospitals in high performing health care systems: International eDelphi exercise. Journal of Medical Internet research, 22(8), e17022. https://doi.org/10.2196/17022
https://doi.org/10.2196/17022...
). We emphasize that these skills are associated with the competencies necessary for the DT process. Such competencies must be present in the people and, in some way, in the company´s culture.

Strategy

In strategic matters, the process of organizational change aligned with technological needs passes through new PM perspectives. These perspectives bring simplicity (Chowdhury & Lamacchia, 2019Chowdhury, K., & Lamacchia, D. (2019). Collaborative Workspace for Employee Engagement Leveraging Social Media Architecture [Conference session]. Abu Dhabi International Petroleum Exhibition & Conference. http://dx.doi.org/10.2118/197325-MS
http://dx.doi.org/10.2118/197325-MS...
; Gerster et al., 2019Gerster, D., Dremel, C., Brenner, W., & Kelker, P. (2019). How enterprises adopt agile structures: A multiple-case study. Proceedings of the 52nd Hawaii International Conference on System Sciences (vol. 51, n. 1, pp. 84-103). https://doi.org/10.1145/3380799.3380807
https://doi.org/10.1145/3380799.3380807...
; Ignat, 2017Ignat, V. (2017). Digitalization and the global technology trends [Paper presentation]. IOP Conference Series: Materials Science and Engineering, Sibiu, Romania (vol. 227, n. 1, pp. 012062). https://iopscience.iop.org/article/10.1088/1757-899X/227/1/012062
https://iopscience.iop.org/article/10.10...
) to attend the central strategy of DT (Kouroubali & Katehakis, 2019Kouroubali, A., & Katehakis, D. G. (2019). The new European interoperability framework as a facilitator of digital transformation for citizen empowerment. Journal of biomedical informatics, 94,103166. https://doi.org/10.1016/j.jbi.2019.103166
https://doi.org/10.1016/j.jbi.2019.10316...
), new business perspectives and innovations to the organizations of many industries (Benzerga et al., 2017Benzerga, S., Hauf, D., Pretz, M., & Bounfour, A. (2017, June 17–19). When energy revolution meets digital transformation. International Conference on Intelligent Decision Technologies, Sorrento, Italy, (vol. 73, pp. 65–81). https://doi.org/10.1007/978-3-319-59424-8_7
https://doi.org/10.1007/978-3-319-59424-...
; Krumay et al., 2019Krumay, B., Rueckel, D., & Koch, S. (2019, December 15–18). Model for strategic positioning in transformative situations [Conference session]. ICIS 2019 Proceedings, Governance Strategy and Value of IS, Munich, Germany. https://aisel.aisnet.org/cgi/viewcontent.cgi?article=1325&context=icis2019
https://aisel.aisnet.org/cgi/viewcontent...
). However, many companies misunderstood the objective of DT. DT means combining the use of technologies, leadership, culture, and skills to integrate and explore the fundamental aspects of DT and meet the business’s digital needs (Guinan et al., 2019Guinan, P. J., Parise, S., & Langowitz, N. (2019). Creating an innovative digital project team: Levers to enable digital transformation. Business Horizons, 62(6), 717-727. https://doi.org/10.1016/j.bushor.2019.07.005
https://doi.org/10.1016/j.bushor.2019.07...
; Karimi & Walter, 2015Karimi, J., & Walter, Z. (2015). The role of dynamic capabilities in responding to digital disruption: A factor-based study of the newspaper industry. Journal of Management Information Systems, 32(1), 39–81. https://doi.org/10.1080/07421222.2015.1029380
https://doi.org/10.1080/07421222.2015.10...
; Vukšić et al., 2018Vukšić, V. B., Ivančić, L., & Vugec, D. S. (2018). A preliminary literature review of digital transformation case studies. International Journal of Computer and Information Engineering, 12(9), 737-742. http://dx.doi.org/10.5281/zenodo.1474581
http://dx.doi.org/10.5281/zenodo.1474581...
).

The disruptive and innovative conjuncture of DT (Barthel & Hess, 2019Barthel, P., & Hess, T. (2019). Are Digital Transformation Projects Special? [Complete Research Paper]. Twenty-Third Pacific Asia Conference on Information Systems, China, (pp. 30).) is pressing digital leadership to act as an agent of change to disseminate and cultivate the cultural aspects of DT (Jacobi & Brenner, 2018Jacobi, R., & Brenner, E. (2018). How large corporations survive digitalization. In Linnhoff-Popien, C., Schneider, R., & Zaddach, M. (Eds.), Digital marketplaces unleashed (pp. 83–97). Springer.). The managers evaluate and measure the maturity of DT to manage change, develop PM capabilities, outlining the future of organizational relationships, technological changes, culture, people, and processes (Akatkin et al., 2016Akatkin, Y., Yasinovskaya, E., Drozhzhinov, V., & Konyavskiy, V. (2016). Towards the digital government in Russia: Integrative approach. Proceedings of the International Conference on Electronic Governance and Open Society: Challenges in Eurasia (pp. 41–48). https://doi.org/10.1145/3014087.3014093
https://doi.org/10.1145/3014087.3014093...
; Bierwolf et al., 2017Bierwolf, Robert, Romero, D., Pelk, H., & Stettina, C. J. (2017, June 27–29). On the future of project management innovation: A call for discussion towards project management 2030. 2017 International Conference on Engineering, Technology and Innovation (ICE/ITMC), Madeira, Portugal, (pp. 689–698). https://doi.org/10.1109/ICE.2017.8279952
https://doi.org/10.1109/ICE.2017.8279952...
; Ilin et al., 2019Ilin, I., Levaniuk, D., & Dubgorn, A. (2019). Assessment of Digital Maturity of Enterprises. Energy Management of Municipal Transportation Facilities and Transport, 167–177. Springer.; Berghaus & Back, 2016Berghaus, S., & Back, A. (2016). Stages in digital business transformation: Results of an empirical maturity study. MCIS, 22.; Schuh et al., 2017Schuh, G., Anderl, R., Gausemeier, J., ten Hompel, M., & Wahlster, W. (2017). Industrie 4.0 maturity index. Acatech: National Academy of Science and Engineering.).

Digital technologies provide spaces for co-creation in the context of innovation with adequate resources and partners influenced by DT (Eikebrokk et al., 2018Eikebrokk, T. R., Lind, E., & Olsen, D. H. (2018). Co-creation of IT-value in a cluster of small enterprises. Procedia computer science, 138, 492–499. https://doi.org/10.1016/j.procs.2018.10.068
https://doi.org/10.1016/j.procs.2018.10....
; Williams & Schubert, 2018Williams, S. P., & Schubert, P. (2018). Designs for the digital workplace. Procedia Computer Science, 138, 478-485. https://doi.org/10.1016/j.procs.2018.10.066
https://doi.org/10.1016/j.procs.2018.10....
). Another example is the virtual environment required for people to interact with digital technologies, generating intelligence and collective agility to innovate (Moreira et al., 2018Moreira, F., Ferreira, M. J., & Seruca, I. (2018). Enterprise 4.0: The emerging digital transformed enterprise? Procedia Computer Science, 138, 525–532. https://doi.org/10.1016/j.procs.2018.10.072
https://doi.org/10.1016/j.procs.2018.10....
). The educational area approaches digital technologies to develop, strategically, new skills in the individual and address the dynamics of DT projects and social needs (Barsukov et al., 2018Barsukov, D., Kuzmina, S., Morozova, N., & Pimenova, A. (2018). Professional education for digital economy: Trends and prospects. MATEC Web of Conferences (vol. 170, pp. 01063). https://doi.org/10.1051/matecconf/201817001063
https://doi.org/10.1051/matecconf/201817...
). Artificial intelligence (AI) is also applied to monitor construction employees’ performance electronically, aiming to create intelligent contracts in the DT context (Calvetti et al., 2020Calvetti, D., Magalhães, P. N. M., Sujan, S. F., Gonçalves, M.C., & Campos de Sousa, H. J. (2020). Challenges of upgrading craft workforce into Construction 4.0: Framework and agreements. Proceedings of the Institution of Civil Engineers: Management, Procurement and Law, 173(4), 158–165. https://doi.org/10.1680/jmapl.20.00004
https://doi.org/10.1680/jmapl.20.00004...
).

Other aspects show the strategic design to drive DT changes, such as using Lean to map the value stream and support decisions about the potential use of technologies and solutions (Wagner et al., 2018Wagner, T., Herrmann, C., & Thiede, S. (2018). Identifying target oriented Industrie 4.0 potentials in lean automotive electronics value streams. Procedia CIRP, 72, 1003-1008. https://doi.org/10.1016/j.procir.2018.03.003
https://doi.org/10.1016/j.procir.2018.03...
). Similarly, portfolio management broadly outlines the value chain’s strategy and organizes PM resources and areas to optimize projects’ conduct (Bierwolf, 2017Bierwolf, R. (2017). Practitioners, reflective practitioners, reflective professionals. IEEE Engineering Management Review, 45(2), 19–24. https://doi.org/10.1109/EMR.2017.2701500
https://doi.org/10.1109/EMR.2017.2701500...
). Technological change, on the other hand, proves beneficial in the process of transitioning projects that incorporate new technologies to obtain transformative organizational results in the DT context (Hartl & Hess, 2019Hartl, E., & Hess, T. (2019, June 8-19). IT projects in digital transformation: A socio-technical journey towards technochange [Conference session]. Proceedings of the 27th European Conference on Information Systems (ECIS), Stockholm & Uppsala, Sweden. https://aisel.aisnet.org/cgi/viewcontent.cgi?article=1161&context=ecis2019_rp
https://aisel.aisnet.org/cgi/viewcontent...
).

Another well-explored point concerns the proposition of frameworks with the prescription of scripts to assess maturity and help companies face the challenges of DT (Parviainen et al., 2017Parviainen, P., Tihinen, M., Kääriäinen, J., & Teppola, S. (2017). Tackling the digitalization challenge: How to benefit from digitalization in practice. International Journal of Information Systems and Project Management, 5(1), 63–77. http://dx.doi.org/10.12821/ijispm050104
http://dx.doi.org/10.12821/ijispm050104...
). Some examples of frameworks are those designed to manage and characterize projects, aiming at effectiveness in the results of the project (Dombrowski et al., 2020Dombrowski, M., Sachenko, A., Sachenko, O., & Dombrowski, Z. (2020, March 05–07). Proactive project management as a discrete event system. 2020 IEEE European Technology and Engineering Management Summit (E-TEMS), Dortmund, Germany (pp. 1–4). https://doi.org/10.1109/E-TEMS46250.2020.9111777
https://doi.org/10.1109/E-TEMS46250.2020...
); to formulate DT’s strategy for the company’s business processes (Borremans et al., 2018Borremans, A. D., Zaychenko, I. M., & Iliashenko, O. Y. (2018). Digital economy. IT strategy of the company development. MATEC Web of Conferences, Petersburg, Russia (vol. 170, pp. 01034). https://doi.org/10.1051/matecconf/201817001034
https://doi.org/10.1051/matecconf/201817...
); to explain the resources needed for small and medium-sized enterprises (SMEs) to face the DT process (Sanchez & Zuntini, 2018Sanchez, M. A., & Zuntini, J. I. (2018). Organizational readiness for the digital transformation: A case study research. Journal of Management & Technology, 18(2), 70-99. http://dx.doi.org/10.20397/2177-6652/2018.v18i2.1316
http://dx.doi.org/10.20397/2177-6652/201...
).

These strategies should allow the DT process to occur clearly, and objectively and follow the companies’ business rules. In order to achieve these results, the competencies must be disseminated among people, as presented in the previous subsection.

Portfolio, programs, and projects

The portfolio, programs, and projects factor shows their importance in organizing and addressing DT initiatives. Portfolio management connects different organization levels with project governance practices allied to management and leadership skills (Lappi et al., 2019Lappi, T. M., Aaltonen, K., & Kujala, J. (2019). Project governance and portfolio management in government digitalization. Transforming Government: People, Process and Policy, 13(2), 159–196. https://doi.org/10.1108/TG-11-2018-0068
https://doi.org/10.1108/TG-11-2018-0068...
) and treating projects in a strategic context to maximize results (Barata et al., 2018Barata, J., Cunha, P. R. da., & Coyle, S. (2018). Guidelines for Using Pilot Projects in the Fourth Industrial Revolution [Conference session]. ACIS 2018 Proceedings, 80. https://aisel.aisnet.org/cgi/viewcontent.cgi?article=1079&context=acis2018
https://aisel.aisnet.org/cgi/viewcontent...
; Isikli et al., 2018Isikli, E., Yanik, S., Cevikcan, E., & Ustundag, A. (2018). Project portfolio selection for the digital transformation era. In Ustundag, A., & Cevikcan, E., Industry 4.0: Managing the digital transformation (pp. 105–121). https://doi.org/10.1007/978-3-319-57870-5
https://doi.org/10.1007/978-3-319-57870-...
). At another level of abstraction, program management is used to organize inter-relationship projects and addresses the various aspects of organizational transformation to enable DT (Perides et al., 2020Perides, M. P. N., Vasconcellos, E. P. G., & Vasconcellos, L. (2020). Change management in digital transformation projects: Case study in a financial organization. Revista de Gestão e Projetos, 11(1), 54–73. https://doi.org/10.5585/gep.v11i1.16087
https://doi.org/10.5585/gep.v11i1.16087...
; Tchana et al., 2019Tchana, Y., Ducellier, G., & Remy, S. (2019). Designing a unique Digital Twin for linear infrastructures lifecycle management. Procedia CIRP, 84, 545–549. https://doi.org/10.1016/j.procir.2019.04.176
https://doi.org/10.1016/j.procir.2019.04...
; Teubner, 2019Teubner, R. A. (2019). An exploration into IT programs and their management: Findings from multiple case study research. Information Systems Management, 36(1), 40–56. https://doi.org/10.1080/10580530.2018.1553648
https://doi.org/10.1080/10580530.2018.15...
).

The APM is predominant in DT, but the hybrid approach stands out in companies in the transition phase. The hybrid system benefits projects’ conduction in a context of volatility and uncertainties, which requires agility, collaboration, and risk management (Barbosa & Saisse, 2019Barbosa, A. M. C., & Saisse, M. C. P. (2019). Hybrid project management for sociotechnical digital transformation context. Brazilian Journal of Operations & Production Management, 16(2), 316–332. https://doi.org/10.14488/BJOPM.2019.v16.n2.a12
https://doi.org/10.14488/BJOPM.2019.v16....
; Hassani et al., 2018Hassani, R., El Idrissi, Y. E. B., & Abouabdellah, A. (2018, January 4–6). Digital project management in the era of digital transformation: Hybrid method [Paper presentation]. Proceedings of the 2018 International Conference on Software Engineering and Information Management, Casablanca, Morocco (pp. 98–103). https://doi.org/10.1145/3178461.3178472
https://doi.org/10.1145/3178461.3178472...
). Besides the APM being the most used PM framework in DT projects, it is not unanimous (DeLone et al., 2018DeLone, W., Migliorati, D., & Vaia, G. (2018). Digital IT governance. In Bongiorno, G., Rizzo, D., & Vaia, G (Eds.), CIOs and the digital transformation: A new leadership role (pp. 205–230). Springer. https://doi.org/10.1007/978-3-319-31026-8_11
https://doi.org/10.1007/978-3-319-31026-...
; Gimpel et al., 2018Gimpel, H., Hosseini, S., Huber, R., Probst, L., Röglinger, M., & Faisst, U. (2018). Structuring digital transformation: A framework of action fields and its application at ZEISS. Journal of Information Technology Theory and Application, 19(1), 31-54. https://aisel.aisnet.org/cgi/viewcontent.cgi?article=1726&context=jitta
https://aisel.aisnet.org/cgi/viewcontent...
; Hasibović & Tanović, 2019Hasibović, A. Ć., & Tanović, A. (2019, May 20-24). PRINCE2 vs Scrum in digital business transformation [Paper presentation]. 42nd International Convention on Information and Communication Technology, Electronics and Microelectronics (MIPRO), Opatija, Croatia (pp. 1514-1518). https://doi.org/10.23919/MIPRO.2019.8756716
https://doi.org/10.23919/MIPRO.2019.8756...
; Nataliia & Oleksii, 2019Nataliia, Y., & Oleksii, Y. (2019, September 17–20). Conceptual groundwork of digital transformation of project management [Paper presentation]. IEEE 14th International Conference on Computer Sciences and Information Technologies (CSIT), Kyiv, Ukraine (vol. 3, pp. 85–88). https://doi.org/10.1109/STC-CSIT.2019.8929818
https://doi.org/10.1109/STC-CSIT.2019.89...
; Shaughnessy, 2018Shaughnessy, H. (2018). Creating digital transformation: Strategies and steps. Strategy & Leadership, 46(2), 19-25. http://dx.doi.org/10.1108/SL-12-2017-0126
http://dx.doi.org/10.1108/SL-12-2017-012...
).

Companies that need a quick response to business and community will take advantage of APM (Nerurkar & Das, 2017Nerurkar, A., & Das, I. (2017, March 07–09). Analysis of DILRMP project: Identifying the applicability of agile project management for digital transformation projects in government and public sector [Paper presentation]. ICEGOV Proceedings of the Special Collection on eGovernment Innovations in India, New Delhi, India (pp. 34–38). https://doi.org/10.1145/3055219.3055242
https://doi.org/10.1145/3055219.3055242...
). This advantage is because APM integrates the stakeholders to address PM matters (Nerurkar & Das, 2017Nerurkar, A., & Das, I. (2017, March 07–09). Analysis of DILRMP project: Identifying the applicability of agile project management for digital transformation projects in government and public sector [Paper presentation]. ICEGOV Proceedings of the Special Collection on eGovernment Innovations in India, New Delhi, India (pp. 34–38). https://doi.org/10.1145/3055219.3055242
https://doi.org/10.1145/3055219.3055242...
) and value aspects of leadership, teams, and ability to innovate (Gurusamy et al., 2016Gurusamy, K., Srinivasaraghavan, N., & Adikari, S. (2016). An integrated framework for design thinking and agile methods for digital transformation [Paper presentation] International Conference of Design, User Experience, and Usability (pp. 34-42). https://doi.org/10.1007/978-3-319-40409-7_4
https://doi.org/10.1007/978-3-319-40409-...
; Mergel, 2016Mergel, I. (2016). Agile innovation management in government: A research agenda. Government Information Quarterly, 33(3), 516–523. https://doi.org/10.1016/j.giq.2016.07.004
https://doi.org/10.1016/j.giq.2016.07.00...
; Shamim et al., 2016Shamim, S., Cang, S., Yu, H., & Li, Y. (2016). Management approaches for Industry 4.0: A human resource management perspective [Paper presentation]. 2016 IEEE Congress on Evolutionary Computation (CEC), Vancouver, BC, Canada (pp. 5309-5316). http://dx.doi.org/10.1109/CEC.2016.7748365
http://dx.doi.org/10.1109/CEC.2016.77483...
). APM brings benefits to being used with DevOps (development and operations), adjusting projects to the ongoing model, continuous deliveries of value, no end date of the project, and management based on products (Wiedemann et al., 2019Wiedemann, A., Forsgren, N., Wiesche, M., Gewald, H., & Krcmar, H. (2019). Research for practice: The DevOps phenomenon. Communications of the ACM, 62(8), 44-49. http://dx.doi.org/10.1145/3331138
http://dx.doi.org/10.1145/3331138...
).

The leadership exercise is a subject present in the DT researchers, especially the project manager’s leadership. Outstanding leadership is collaborative and capable of bringing together internal and external actors to generate innovations through multifunctional teams, collective learning, and agile processes for decision-making and problem-solving (Crowley et al., 2017Crowley, C., Carcary, M., Doherty, E., & Conway, G. (2017, September). Rethinking IT sourcing and supplier management for the digital age [Paper presentation]. Proceedings 11th European Conference on Information Systems. Management, ECISM 2017 (pp. 64–72). http://eprints.maynoothuniversity.ie/8911/1/ECISM2017%20-%20Rethinking%20IT%20Sourcing%20and%20Supplier%20Management%20for%20the%20Digital%20Age%20for%20e-prints.pdf
http://eprints.maynoothuniversity.ie/891...
; Scott et al., 2019Scott, I. A., Sullivan, C., & Staib, A. (2019). Going digital: A checklist in preparing for hospital-wide electronic medical record implementation and digital transformation. Australian Health Review, 43(3), 302-313. https://doi.org/10.1071/AH17153
https://doi.org/10.1071/AH17153...
). The specificities of projects challenge project managers and leadership with complexity, constraints, and critical success factors to achieve high performance and ensure success in DT projects (Kolasa, 2017Kolasa, I. (2017, June). Success factors for public sector information system projects: Qualitative literature review [Paper presentation]. Proceeding of the 17th European Conference on Digital Government Military Academy Lisbon Portugal, Academic Conferences and Publishing International Limited, Lisboa, Portugal (pp. 326–335). https://www.proquest.com/openview/b5e5ac910dcf68ba08ed0f05ac2d95ef/1?pq-origsite=gscholar&cbl=1796415
https://www.proquest.com/openview/b5e5ac...
; Priambodo et al., 2019Priambodo, A., Handayani, P. W., & Pinem, A. A. (2019). Success factor for it project implementation in banking industry: A case study [Paper presentation]. 3rd International Conference on Informatics and Computational Sciences (ICICoS), Semarang, Indonesia (pp. 1-5). https://doi.org/10.1109/ICICoS48119.2019.8982404
https://doi.org/10.1109/ICICoS48119.2019...
).

The PM is a strategic priority for organizations and their leaders to address the opportunities and challenges regarding new surgent digital technologies (Hassani et al., 2018Hassani, R., El Idrissi, Y. E. B., & Abouabdellah, A. (2018, January 4–6). Digital project management in the era of digital transformation: Hybrid method [Paper presentation]. Proceedings of the 2018 International Conference on Software Engineering and Information Management, Casablanca, Morocco (pp. 98–103). https://doi.org/10.1145/3178461.3178472
https://doi.org/10.1145/3178461.3178472...
). Exploring diverse digital technologies needs deep analysis under optics that integrates technology, process, and people (Hassani & El Idrissi, 2020Hassani, R., & El Idrissi, Y. E. B. (2020). A framework to succeed planning of IT projects through the Machine Learning. International Journal of Advanced Trends in Computer Science and Engineering, 9(2), 2353-2361. https://doi.org/10.30534/ijatcse/2020/220922020
https://doi.org/10.30534/ijatcse/2020/22...
). It should start with a technological transformation that supports DT (Tsurkan et al., 2019Tsurkan, M. V., Mironova, S. M., & Pilipchuk, N. V. (2019, April 14–15). Digital transformation of project implementation monitoring in the regional public management [Paper presentation]. Proceedings of the 1st International Scientific Conference “Modern Management Trends and the Digital Economy: From Regional Development to Global Economic Growth”, Yekaterinburg, Russia (pp. 80–85). https://dx.doi.org/10.2991/mtde-19.2019.15
https://dx.doi.org/10.2991/mtde-19.2019....
) and brings clear benefits to the organization and interdisciplinary projects (Ganis & Waszkiewicz, 2018Ganis, M. R., & Waszkiewicz, M. (2018). Digital communication tools as a success factor of interdisciplinary projects. Problemy Zarzadzania: Management Issues, 16(4(77), 85-96. https://doi.org/10.7172/1644-9584.77.5
https://doi.org/10.7172/1644-9584.77.5...
).

In the DT process, the projects start focused on strategy and need to be aligned with the customer value proposition. This scenario is supported by the APM and the development team, always in line with the business strategy.

Digital technologies

Areas that develop projects using technologies such as Robotic Process Automation (RPA), BIM, Blockchain, IoT, Big Data, Analytics, and Cyber-Physical Systems (CPS), among others, will benefit when the technology is used in conjunction with APM. For example, the projects that use APM management implementing RPA to automate routine tasks and scan processes, bring technical innovations, and connect the business areas to the organization’s IT (Marek et al., 2019Marek, J., Blümlein, K., Neubauer, J., & Wehking, C. (2019). Ditching labor-intensive paper-based processes: Process automation in a Czech insurance company [Paper presentation]. BPM (Industry Forum), (pp. 16–24). http://ceur-ws.org/Vol-2428/paper2.pdf
http://ceur-ws.org/Vol-2428/paper2.pdf...
; Schmitz et al., 2019Schmitz, M., Dietze, C., & Czarnecki, C. (2019). Enabling digital transformation through robotic process automation at Deutsche Telekom. In Urbach, N., Röglinger, M. (Eds.), Digitalization cases (pp. 15-33). Springer, Cham. https://link.springer.com/chapter/10.1007/978-3-319-95273-42
https://link.springer.com/chapter/10.100...
). The importance of creating a reliable environment in integrating RPA project teams (Mishra et al., 2019bMishra, S., Sree Devi, K. K., & Badri Narayanan, M. K. (2019b). Technology dimensions of automation in business process management industry. International Journal of Engineering and Advanced Technology, 8(6), 1919–1926. http://dx.doi.org/10.35940/ijeat.F8569.088619
http://dx.doi.org/10.35940/ijeat.F8569.0...
) and the technical management’s support to build the skills in the workers (Mishra et al., 2019aMishra, S., Sree Devi, K. K., & Badri Narayanan, M. K. (2019a). People & process dimensions of automation in business process management industry. International Journal of Engineering and Advanced Technology, 8(6), 2465–2472. http://www.doi.org/10.35940/ijeat.F8555.088619
http://www.doi.org/10.35940/ijeat.F8555....
).

Within the field of AI, BIM is increasingly used to address complex problems in the Architecture, Engineering, and Construction (AEC) industry and address optimization, simulation, PM, and uncertainty treatment (Darko et al., 2020Darko, A., Chan, A. P. C., Adabre, M. A., Edwards, D. J., Hosseini, M. R., & Ameyaw, E. E. (2020). Artificial intelligence in the AEC industry: Scien-tometric analysis and visualization of research activities. Automation in Construction, 112, 103081. https://doi.org/10.1016/j.autcon.2020.103081
https://doi.org/10.1016/j.autcon.2020.10...
). Among the issues addressed by digital technologies, we highlight the use of APM in projects that needs the ability to design new features, scale resources (Diaz et al., 2020Diaz, R., Smith, K., Landaeta, R., & Padovano, A. (2020). Shipbuilding supply chain framework and digital transformation: A project portfolios risk evaluation. Procedia Manufacturing, 42, 173–180. https://doi.org/10.1016/j.promfg.2020.02.067
https://doi.org/10.1016/j.promfg.2020.02...
), improve production processes, and add new technical resources. APM can add value by integrating and managing those involved during the construction and delivery of the assets (Aibinu & Papadonikolaki, 2020Aibinu, A. A., & Papadonikolaki, E. (2020). Conceptualizing and operationalizing team task interdependences: BIM implementation assessment using effort distribution analytics. Construction Management and Economics, 38(5), 420–446. https://doi.org/10.1080/01446193.2019.1623409
https://doi.org/10.1080/01446193.2019.16...
; Chan, 2020Chan, P. W. C. (2020). Construction in the platform society: New directions for construction management research. Proceedings of the 36th Annual Conference 2020 (ARCOM 2020), United Kingdom. http://resolver.tudelft.nl/uuid:356dfa7a-e7a3-4a57-b3fa-e02085ed1a61
http://resolver.tudelft.nl/uuid:356dfa7a...
; Dremel et al., 2017Dremel, C., Herterich, M, Wulf, J., Waizmann, J.-C., & Brenner, W. (2017). How AUDI AG established big data analytics in its digital transformation. MIS Quarterly Executive, 16(2), 81–100. https://aisel.aisnet.org/cgi/viewcontent.cgi?article=1355&context=misqe
https://aisel.aisnet.org/cgi/viewcontent...
; Ochara et al., 2018Ochara, N. M., Nawa, E.-L., Fiodorov, I., Lebedev, S., Sotnikov, A., Telnovl, Y., & Kadyamatimba, A. (2018, October 3–5). Digital transformation of enterprises: A transition using process modelling antecedents [Paper presentation]. 2018 Open Innovations Conference (OI), Johannesburg, South Africa (pp. 325–331). https://doi.org/10.1109/OI.2018.8535735
https://doi.org/10.1109/OI.2018.8535735...
; Woodhead et al., 2018Woodhead, R., Stephenson, P., & Morrey, D. (2018). Digital construction: From point solutions to IoT ecosystem. Automation in Construction, 93, 35-46. https://doi.org/10.1016/j.autcon.2018.05.004
https://doi.org/10.1016/j.autcon.2018.05...
).

An example of BIM projects is using the Lean method as a support tool to help with the difficulties faced for adaptation to DT and to improve processes, productivity, efficiency, and quality in construction (Çelik, 2019Çelik, U. (2019). 4D and 5D BIM: A System for Automation of Planning and Integrated Cost Management. Eurasian BIM Forum, Istanbul, Turkey (pp. 57–69). https://doi.org/10.1007/978-3-030-42852-5_5
https://doi.org/10.1007/978-3-030-42852-...
; Koseoglu & Nurtan-Gunes, 2018Koseoglu, O., & Nurtan-Gunes, E. T. (2018). Mobile BIM implementation and lean interaction on construction site: A case study of a complex airport project. Engineering, Construction and Architectural Management, 25(10), 1298–1321. https://doi.org/10.1108/ECAM-08-2017-0188
https://doi.org/10.1108/ECAM-08-2017-018...
). Another approach proposes product life-cycle management best practices to indicate improvements in BIM results using an information-centric management approach in construction projects (Boton et al., 2016Boton, C., Rivest, L., Forgues, D., & Jupp, J. (2016). Comparing PLM and BIM from the product structure standpoint [Paper presentation]. IFIP International Conference on Product Lifecycle Management, Columbia, South Carolina, United States (pp. 443–453). https://dx.doi.org/10.1007/978-3-319-54660-5_40
https://dx.doi.org/10.1007/978-3-319-546...
).

BIM shows the prominence of digital technologies such as IoT, which brings real-time project situations, using intelligent systems to assist decision-making processes and avoid risks in AEC projects. It will also benefit the work’s performance by providing accurate data integrated with a cloud-based BIM data platform (Teizer et al., 2017Teizer, J., Wolf, M., Golovina, O., Perschewski, M., Propach, M., Neges, M., & König, M. (2017). Internet of Things (IoT) for integrating environmental and localization data in Building Information Modeling (BIM) [Paper presentation]. Proceedings of the 34th International Symposium on Automation and Robotics in Construction, Taipei, Taiwan (pp. 603–609). https://doi.org/10.22260/ISARC2017/0084
https://doi.org/10.22260/ISARC2017/0084...
). The significant increase in the use of agile tools in conjunction with digital tools demonstrates the degree of importance and relevance they acquire to address organizations’ future priorities in implementing DT (Durão et al., 2019Durão, N., Ferreira, M. J., Pereira, C. S., & Moreira, F. (2019). Current and future state of Portuguese organizations towards digital transformation. Procedia Computer Science, 164, 25–32. https://doi.org/10.1016/j.procs.2019.12.150
https://doi.org/10.1016/j.procs.2019.12....
).

The delay in adopting blockchain in the industry has several origins: lack of collaboration and exchange of information, mistrust between the parties, operational and management problems, and intellectual property rights (Li et al., 2019Li, J., Greenwood, D., & Kassem, M. (2019). Blockchain in the built environment and construction industry: A systematic review, conceptual models and practical use cases. Automation in Construction, 102, 288–307. https://doi.org/10.1016/j.autcon.2019.02.005
https://doi.org/10.1016/j.autcon.2019.02...
). Projects that jointly use BIM and blockchain prove complexity by bringing together products, processes, people, technologies, and policies (Singh, 2016Singh, V. (2016). BIM ecosystem research: What, why and how? Framing the directions for a holistic view of BIM [Paper presentation]. IFIP Advances in Information and Communication Technology (vol. 492). https://doi.org/10.1007/978-3-319-54660-5_39
https://doi.org/10.1007/978-3-319-54660-...
). The use of blockchain can bring together parts of different sectors to support the design and construction phases, increasing performance and improving quality and transparency in projects (Bataev, 2019Bataev, A. V. (2019). Efficiency Estimation Model of 3D Technology in the Construction Industry. 2019 IEEE Conference of Russian Young Researchers in Electrical and Electronic Engineering (EIConRus), Saint Petersburg and Moscow, Russia, (pp. 1376–1381). https://doi.org/10.1109/EIConRus.2019.8657181
https://doi.org/10.1109/EIConRus.2019.86...
; Li et al., 2019Li, J., Greenwood, D., & Kassem, M. (2019). Blockchain in the built environment and construction industry: A systematic review, conceptual models and practical use cases. Automation in Construction, 102, 288–307. https://doi.org/10.1016/j.autcon.2019.02.005
https://doi.org/10.1016/j.autcon.2019.02...
).

Digital technologies have an important role in the DT process, ensuring that projects are aligned with the companies’ business rules strategy, driven by people’s technical skills, and disseminated throughout the organization.

Model proposition

Figure 3 summarizes the study’s findings, demonstrating the main aspects and the relationship between the four factors. The elements of competencies appear in all factors, demonstrating their scope and importance in carrying out the D T.

Figure 3
The four factors to perform DT

The strategy factor relates to the definition and planning to remodel and create new business models, digitize services, maintain competitiveness amid major changes, generate value, outline, and drive the organizational and cultural changes involved. Management and business competencies are highlighted in this factor.

The factor portfolio, programs, and projects appears to structure the enabling factors of D T. The portfolio aspect connects different levels of the organization, governance, and leadership aspects. The programs aspect is used to organize and interrelate projects with common purposes. The projects aspect performs deliveries through agile, hybrid, and traditional approaches. In this factor, competencies are fundamental to leading the delivery of products and services within the new context of DT.

The digital technologies factor demonstrates the use of these new technologies in the challenges involved in automating and optimizing processes, simulating scenarios and models, generating operational efficiency, assisting in the decision-making process, and generating collaboration between individuals and teams. This factor requires individuals and teams proficient in technical skills to use new digital technologies. The competencies factor participates in the other factors and is considered at the individual and collective level. In this sense, the competencies factor covers the entire DT adoption process, being necessary to plan the strategy and conduct the process, operationalize digitization through digital technologies, and support change and operationalization through PM frameworks.

Considering the four factors involved in the relationship between DT and PM, all factors are interrelated to the objective of performing DT. Therefore, DT is a process that needs to be in line with the company’s strategy regarding its digitalization planning. Thus, to make DT operational, individuals with competencies in digital technologies are required to operationalize the digitization, as well as PM competencies to support the process of change.

FINAL CONSIDERATIONS

This research analyzed the relationship between PM and DT to identify convergence points. The analysis corpus comprised 104 articles published in journals, congresses, symposiums, and conferences between 2015 and 2020. For the most part, the articles came from engineering, telecommunications, health, management, media, technology, and strategy areas.

The corpus of analysis categorizes four factors: 1. competencies, 2. strategy, 3. portfolio, programs, and projects, and 4. digital technologies. The factors identified present aspects relate to the challenge of performing a D T. Using new digital technologies is the basis for performing D T, and it brings the company to a new competitive level. In this sense, the articles explore DT applicability in various situations. However, some articles show that digital technologies need alignment with the strategy that adapts and shapes the organization into a digital market context.

Considering the research question proposed in this study, which verified the relationship between DT and PM, we can infer that the DT process has a strong relationship with PM, being necessary to understand the introduction of digital technologies aligned with business strategies supported by the PM. In addition, an important aspect of the relationship is the relevance of people management as identifying and using competencies that facilitate the realization of DT.

New digital technologies and strategies, allied to DT initiatives, demand competencies in technical and behavioral aspects suitable for operating in environments of rapid change, volatility, and high risks. In this context, PM presents adaptability, supporting DT transitions with adaptive PM approaches (agile and hybrid methods). It is hoped that this study will contribute to deepening the discussion on the themes of PM and DT and the existing relationship. The research question of this study was answered with the indication that the relationship between TD and PM starts from a strategic direction to plan and execute TD, using the PM to support the strategy, digital technologies as a means for implementation, development, and maintenance of skills for the entire change process. Additionally, this article proposes in Figure 3 an interaction flow between the factors that make DT viable.

The model is composed of factors identified in the study and considers strategic premises to develop the DT strategy. The model is composed in such a way that the DT is reviewed and analyzed throughout the life cycle of the DT project. In addition, it considers that the organization must address aspects of competitiveness, innovation, and rapid changes in the market.

The model proposes that the DT strategy rethink its business models and services for the digital context and undertake organizational and cultural changes to execute the transformation. The model considers the digital technologies factor as a fundamental means to execute the DT, providing the strategy execution to reach a new level of competitiveness for the organization. In this scenario, PM frameworks are a supporting factor to help operationalize the DT strategy and maintain alignment with organizational strategy.

Thus, competencies appear to be essential for the model’s factor to enable the organization to face the challenges arising from DT by developing and maintaining technical, relational, and managerial competencies for the entire DT process. It is expected that this study will contribute to the deepening of the discussion on the themes of PM and DT in organizations, and the relevance of providing a database that informs the work carried out, periodicals, authors, and sub-theme categories is a facilitating tool for researchers.

Therefore, for future research, we recommend that studies be carried out to understand the influence of competencies for DT, which play a strategic role in operationalizing and improving the DT process. Furthermore, DT is an evolving topic with great potential for further studies.

REFERENCES

  • Aibinu, A. A., & Papadonikolaki, E. (2020). Conceptualizing and operationalizing team task interdependences: BIM implementation assessment using effort distribution analytics. Construction Management and Economics, 38(5), 420–446. https://doi.org/10.1080/01446193.2019.1623409
    » https://doi.org/10.1080/01446193.2019.1623409
  • Akatkin, Y., Yasinovskaya, E., Drozhzhinov, V., & Konyavskiy, V. (2016). Towards the digital government in Russia: Integrative approach. Proceedings of the International Conference on Electronic Governance and Open Society: Challenges in Eurasia (pp. 41–48). https://doi.org/10.1145/3014087.3014093
    » https://doi.org/10.1145/3014087.3014093
  • Assante, D., Romano, E., Flamini, M., Castro, M., Martin, S., Lavirotte, S., … Bagdoniene, I. (2018). Internet of things education: Labor market training needs and national policies. 2018 IEEE Global Engineering Education Conference (EDUCON), 1846–1853. IEEE.
  • Assante, D., Fornaro, C., Castro, M., Martin, S., Leisenberg, M., & Kronsbein, P. (2020). Internet of Things: Three years of experience on education in the business sector. 2020 IEEE Global Engineering Education Conference (EDUCON), Porto, Portugal (pp. 1800–1806). https://doi.org/10.1109/EDUCON45650.2020.9125115
    » https://doi.org/10.1109/EDUCON45650.2020.9125115
  • Azarenko, N. Y., Mikheenko, O. V., Chepikova, E. M., & Kazakov, O. D. (2018). Formation of innovative mechanism of staff training in the conditions of digital transformation of economy. 2018 IEEE International Conference “Quality Management, Transport and Information Security, Information Technologies (IT&QM&IS)”, St. Petersburg, Russia (pp. 764–768). https://doi.org/10.1109/ITMQIS.2018.8525021.
    » https://doi.org/10.1109/ITMQIS.2018.8525021.
  • Azzouz, A., & Papadonikolaki, E. (2020). Boundary-spanning for managing digital innovation in the AEC sector. Architectural Engineering and Design Management, 16(5), 1–18. https://doi.org/10.1080/17452007.2020.1735293
    » https://doi.org/10.1080/17452007.2020.1735293
  • Barata, J., Cunha, P. R. da., & Coyle, S. (2018). Guidelines for Using Pilot Projects in the Fourth Industrial Revolution [Conference session]. ACIS 2018 Proceedings, 80. https://aisel.aisnet.org/cgi/viewcontent.cgi?article=1079&context=acis2018
    » https://aisel.aisnet.org/cgi/viewcontent.cgi?article=1079&context=acis2018
  • Barbosa, A. M. C., & Saisse, M. C. P. (2019). Hybrid project management for sociotechnical digital transformation context. Brazilian Journal of Operations & Production Management, 16(2), 316–332. https://doi.org/10.14488/BJOPM.2019.v16.n2.a12
    » https://doi.org/10.14488/BJOPM.2019.v16.n2.a12
  • Barbosa, G. F., Shiki, S. B., & Silva, I. B. (2020). R&D roadmap for process robotization driven to the digital transformation of the industry 4.0. Concurrent Engineering, 28(4), 290–304. https://doi.org/10.1177/1063293X20958927
    » https://doi.org/10.1177/1063293X20958927
  • Bardin, L. (2011). Content analysis São Paulo: Edições, 70.
  • Barsukov, D., Kuzmina, S., Morozova, N., & Pimenova, A. (2018). Professional education for digital economy: Trends and prospects. MATEC Web of Conferences (vol. 170, pp. 01063). https://doi.org/10.1051/matecconf/201817001063
    » https://doi.org/10.1051/matecconf/201817001063
  • Barthel, P., & Hess, T. (2019). Are Digital Transformation Projects Special? [Complete Research Paper]. Twenty-Third Pacific Asia Conference on Information Systems, China, (pp. 30).
  • Barthel, P., & Hess, T. (2020). Towards a characterization of digitalization projects in the context of organizational transformation. Pacific Asia Journal of the Association for Information Systems, 12(3), 31–56.
  • Bataev, A. V. (2019). Efficiency Estimation Model of 3D Technology in the Construction Industry. 2019 IEEE Conference of Russian Young Researchers in Electrical and Electronic Engineering (EIConRus), Saint Petersburg and Moscow, Russia, (pp. 1376–1381). https://doi.org/10.1109/EIConRus.2019.8657181
    » https://doi.org/10.1109/EIConRus.2019.8657181
  • Belle, I. (2017). The architecture, engineering and construction industry and block-chain technology Digital Culture, Nanjing, China (pp. 279–284).
  • Benzerga, S., Hauf, D., Pretz, M., & Bounfour, A. (2017, June 17–19). When energy revolution meets digital transformation. International Conference on Intelligent Decision Technologies, Sorrento, Italy, (vol. 73, pp. 65–81). https://doi.org/10.1007/978-3-319-59424-8_7
    » https://doi.org/10.1007/978-3-319-59424-8_7
  • Berghaus, S., & Back, A. (2016). Stages in digital business transformation: Results of an empirical maturity study. MCIS, 22.
  • Betz, C., Olagunju, A. O., & Paulson, P. (2016). The impacts of digital transformation, agile, and DevOps on future IT curricula. Proceedings of the 17th Annual Conference on Information Technology Education, Boston, Massachusetts, United States (pp. 106). https://dl.acm.org/doi/10.1145/2978192.2978205
    » https://dl.acm.org/doi/10.1145/2978192.2978205
  • Bierwolf, R. (2017). Practitioners, reflective practitioners, reflective professionals. IEEE Engineering Management Review, 45(2), 19–24. https://doi.org/10.1109/EMR.2017.2701500
    » https://doi.org/10.1109/EMR.2017.2701500
  • Bierwolf, Robert, Romero, D., Pelk, H., & Stettina, C. J. (2017, June 27–29). On the future of project management innovation: A call for discussion towards project management 2030 2017 International Conference on Engineering, Technology and Innovation (ICE/ITMC), Madeira, Portugal, (pp. 689–698). https://doi.org/10.1109/ICE.2017.8279952
    » https://doi.org/10.1109/ICE.2017.8279952
  • Bilgeri, D., Wortmann, F., & Fleisch, E. (2017). How digital transformation affects large manufacturing companies’ organization [Paper presentation]. Thirty Eighth International Conference on Information Systems, South Korea (pp. 1–9). http://cocoa.ethz.ch/downloads/2018/01/2360_3_Bilgeri%20et%20al._2017_IoT%20Organization%20of%20Large%20Manufacturing%20Companies.pdf
    » http://cocoa.ethz.ch/downloads/2018/01/2360_3_Bilgeri%20et%20al._2017_IoT%20Organization%20of%20Large%20Manufacturing%20Companies.pdf
  • Borremans, A. D., Zaychenko, I. M., & Iliashenko, O. Y. (2018). Digital economy. IT strategy of the company development. MATEC Web of Conferences, Petersburg, Russia (vol. 170, pp. 01034). https://doi.org/10.1051/matecconf/201817001034
    » https://doi.org/10.1051/matecconf/201817001034
  • Boton, C., Rivest, L., Forgues, D., & Jupp, J. (2016). Comparing PLM and BIM from the product structure standpoint [Paper presentation]. IFIP International Conference on Product Lifecycle Management, Columbia, South Carolina, United States (pp. 443–453). https://dx.doi.org/10.1007/978-3-319-54660-5_40
    » https://dx.doi.org/10.1007/978-3-319-54660-5_40
  • Braun, T., & Sydow, J. (2019). Selecting organizational partners for interor-ganizational projects: The dual but limited role of digital capabilities in the construction industry. Project Management Journal, 50(4), 398–408. https://doi.org/10.1177/8756972819857477
    » https://doi.org/10.1177/8756972819857477
  • Brunet-Thornton, R., Cramer, T., & Jirsák, P. (2019). A research agenda on Czech attitudinal perspectives in an era of digital transformation. Journal of Eastern European and Central Asian Research, 6(1), 99–112. https://doi.org/10.15549/jeecar.v6i1.277
    » https://doi.org/10.15549/jeecar.v6i1.277
  • Bygstad, B., Aanby, H.-P., & Iden, J. (2017). Leading digital transformation: The Scandinavian way Scandinavian Conference on Information Systems (pp. 1–14). https://doi.org/10.1007/978-3-319-64695-4_1
    » https://doi.org/10.1007/978-3-319-64695-4_1
  • Calvetti, D., Magalhães, P. N. M., Sujan, S. F., Gonçalves, M.C., & Campos de Sousa, H. J. (2020). Challenges of upgrading craft workforce into Construction 4.0: Framework and agreements. Proceedings of the Institution of Civil Engineers: Management, Procurement and Law, 173(4), 158–165. https://doi.org/10.1680/jmapl.20.00004
    » https://doi.org/10.1680/jmapl.20.00004
  • Çelik, U. (2019). 4D and 5D BIM: A System for Automation of Planning and Integrated Cost Management. Eurasian BIM Forum, Istanbul, Turkey (pp. 57–69). https://doi.org/10.1007/978-3-030-42852-5_5
    » https://doi.org/10.1007/978-3-030-42852-5_5
  • Chan, P. W. C. (2020). Construction in the platform society: New directions for construction management research. Proceedings of the 36th Annual Conference 2020 (ARCOM 2020), United Kingdom. http://resolver.tudelft.nl/uuid:356dfa7a-e7a3-4a57-b3fa-e02085ed1a61
    » http://resolver.tudelft.nl/uuid:356dfa7a-e7a3-4a57-b3fa-e02085ed1a61
  • Chanias, S., Myers, M. D., & Hess, T. (2019). Digital transformation strategy making in pre-digital organizations: The case of a financial services provider. The Journal of Strategic Information Systems, 28(1), 17–33. https://doi.org/10.1016/j.jsis.2018.11.003
    » https://doi.org/10.1016/j.jsis.2018.11.003
  • Chowdhury, K., & Lamacchia, D. (2019). Collaborative Workspace for Employee Engagement Leveraging Social Media Architecture [Conference session]. Abu Dhabi International Petroleum Exhibition & Conference. http://dx.doi.org/10.2118/197325-MS
    » http://dx.doi.org/10.2118/197325-MS
  • Crawford, L., & Nahmias, A. H. (2010). Competencies for managing change. International Journal of Project Management, 28(4), 405–412. https://doi.org/10.1016/j.ijproman.2010.01.015
    » https://doi.org/10.1016/j.ijproman.2010.01.015
  • Crowley, C., Carcary, M., Doherty, E., & Conway, G. (2017, September). Rethinking IT sourcing and supplier management for the digital age [Paper presentation]. Proceedings 11th European Conference on Information Systems. Management, ECISM 2017 (pp. 64–72). http://eprints.maynoothuniversity.ie/8911/1/ECISM2017%20-%20Rethinking%20IT%20Sourcing%20and%20Supplier%20Management%20for%20the%20Digital%20Age%20for%20e-prints.pdf
    » http://eprints.maynoothuniversity.ie/8911/1/ECISM2017%20-%20Rethinking%20IT%20Sourcing%20and%20Supplier%20Management%20for%20the%20Digital%20Age%20for%20e-prints.pdf
  • Darko, A., Chan, A. P. C., Adabre, M. A., Edwards, D. J., Hosseini, M. R., & Ameyaw, E. E. (2020). Artificial intelligence in the AEC industry: Scien-tometric analysis and visualization of research activities. Automation in Construction, 112, 103081. https://doi.org/10.1016/j.autcon.2020.103081
    » https://doi.org/10.1016/j.autcon.2020.103081
  • DeLone, W., Migliorati, D., & Vaia, G. (2018). Digital IT governance. In Bongiorno, G., Rizzo, D., & Vaia, G (Eds.), CIOs and the digital transformation: A new leadership role (pp. 205–230). Springer. https://doi.org/10.1007/978-3-319-31026-8_11
    » https://doi.org/10.1007/978-3-319-31026-8_11
  • Demirkan, H., & Spohrer, J. C. (2018). Commentary-Cultivating T-shaped professionals in the era of digital transformation. Service Science, 10(1), 98–109. https://doi.org/10.1287/serv.2017.0204
    » https://doi.org/10.1287/serv.2017.0204
  • Diaz, R., Smith, K., Landaeta, R., & Padovano, A. (2020). Shipbuilding supply chain framework and digital transformation: A project portfolios risk evaluation. Procedia Manufacturing, 42, 173–180. https://doi.org/10.1016/j.promfg.2020.02.067
    » https://doi.org/10.1016/j.promfg.2020.02.067
  • Dombrowski, M., Sachenko, A., Sachenko, O., & Dombrowski, Z. (2020, March 05–07). Proactive project management as a discrete event system. 2020 IEEE European Technology and Engineering Management Summit (E-TEMS), Dortmund, Germany (pp. 1–4). https://doi.org/10.1109/E-TEMS46250.2020.9111777
    » https://doi.org/10.1109/E-TEMS46250.2020.9111777
  • Downes, L., & Nunes, P. (2013). Big-bang disruption. Harvard Business Review, 44–56.
  • Dremel, C., Herterich, M, Wulf, J., Waizmann, J.-C., & Brenner, W. (2017). How AUDI AG established big data analytics in its digital transformation. MIS Quarterly Executive, 16(2), 81–100. https://aisel.aisnet.org/cgi/viewcontent.cgi?article=1355&context=misqe
    » https://aisel.aisnet.org/cgi/viewcontent.cgi?article=1355&context=misqe
  • Durão, N., Ferreira, M. J., Pereira, C. S., & Moreira, F. (2019). Current and future state of Portuguese organizations towards digital transformation. Procedia Computer Science, 164, 25–32. https://doi.org/10.1016/j.procs.2019.12.150
    » https://doi.org/10.1016/j.procs.2019.12.150
  • Eikebrokk, T. R., Lind, E., & Olsen, D. H. (2018). Co-creation of IT-value in a cluster of small enterprises. Procedia computer science, 138, 492–499. https://doi.org/10.1016/j.procs.2018.10.068
    » https://doi.org/10.1016/j.procs.2018.10.068
  • Fitzgerald, M., Kruschwitz, N., Bonnet, D., & Welch, M. (2014). Embracing digital technology: A new strategic imperative. MITSloan Management Review https://sloanreview.mit.edu/projects/embracing-digital-technology/
    » https://sloanreview.mit.edu/projects/embracing-digital-technology/
  • Ganis, M. R., & Waszkiewicz, M. (2018). Digital communication tools as a success factor of interdisciplinary projects. Problemy Zarzadzania: Management Issues, 16(4(77), 85-96. https://doi.org/10.7172/1644-9584.77.5
    » https://doi.org/10.7172/1644-9584.77.5
  • Geraldi, J., & Söderlund, J. (2018). Project studies: What it is, where it is going. International Journal of Project Management, 36(1), 55-70. https://doi.org/10.1016/j.ijproman.2017.06.004
    » https://doi.org/10.1016/j.ijproman.2017.06.004
  • Gerster, D., Dremel, C., Brenner, W., & Kelker, P. (2019). How enterprises adopt agile structures: A multiple-case study. Proceedings of the 52nd Hawaii International Conference on System Sciences (vol. 51, n. 1, pp. 84-103). https://doi.org/10.1145/3380799.3380807
    » https://doi.org/10.1145/3380799.3380807
  • Gimpel, H., Hosseini, S., Huber, R., Probst, L., Röglinger, M., & Faisst, U. (2018). Structuring digital transformation: A framework of action fields and its application at ZEISS. Journal of Information Technology Theory and Application, 19(1), 31-54. https://aisel.aisnet.org/cgi/viewcontent.cgi?article=1726&context=jitta
    » https://aisel.aisnet.org/cgi/viewcontent.cgi?article=1726&context=jitta
  • Guinan, P. J., Parise, S., & Langowitz, N. (2019). Creating an innovative digital project team: Levers to enable digital transformation. Business Horizons, 62(6), 717-727. https://doi.org/10.1016/j.bushor.2019.07.005
    » https://doi.org/10.1016/j.bushor.2019.07.005
  • Gurusamy, K., Srinivasaraghavan, N., & Adikari, S. (2016). An integrated framework for design thinking and agile methods for digital transformation [Paper presentation] International Conference of Design, User Experience, and Usability (pp. 34-42). https://doi.org/10.1007/978-3-319-40409-7_4
    » https://doi.org/10.1007/978-3-319-40409-7_4
  • Hartl, E., & Hess, T. (2019, June 8-19). IT projects in digital transformation: A socio-technical journey towards technochange [Conference session]. Proceedings of the 27th European Conference on Information Systems (ECIS), Stockholm & Uppsala, Sweden. https://aisel.aisnet.org/cgi/viewcontent.cgi?article=1161&context=ecis2019_rp
    » https://aisel.aisnet.org/cgi/viewcontent.cgi?article=1161&context=ecis2019_rp
  • Hasibović, A. Ć., & Tanović, A. (2019, May 20-24). PRINCE2 vs Scrum in digital business transformation [Paper presentation]. 42nd International Convention on Information and Communication Technology, Electronics and Microelectronics (MIPRO), Opatija, Croatia (pp. 1514-1518). https://doi.org/10.23919/MIPRO.2019.8756716
    » https://doi.org/10.23919/MIPRO.2019.8756716
  • Hassani, R., & El Idrissi, Y. E. B. (2020). A framework to succeed planning of IT projects through the Machine Learning. International Journal of Advanced Trends in Computer Science and Engineering, 9(2), 2353-2361. https://doi.org/10.30534/ijatcse/2020/220922020
    » https://doi.org/10.30534/ijatcse/2020/220922020
  • Hassani, R., El Idrissi, Y. E. B., & Abouabdellah, A. (2018, January 4–6). Digital project management in the era of digital transformation: Hybrid method [Paper presentation]. Proceedings of the 2018 International Conference on Software Engineering and Information Management, Casablanca, Morocco (pp. 98–103). https://doi.org/10.1145/3178461.3178472
    » https://doi.org/10.1145/3178461.3178472
  • Henriette, E., Feki, M., & Boughzala, I. (2015). The shape of digital transformation: A systematic literature review [Paper presentation]. MCIS 2015 proceedings (vol. 10, pp. 431–443). https://aisel.aisnet.org/cgi/viewcontent.cgi?article=1027&context=mcis2015
    » https://aisel.aisnet.org/cgi/viewcontent.cgi?article=1027&context=mcis2015
  • Ignat, V. (2017). Digitalization and the global technology trends [Paper presentation]. IOP Conference Series: Materials Science and Engineering, Sibiu, Romania (vol. 227, n. 1, pp. 012062). https://iopscience.iop.org/article/10.1088/1757-899X/227/1/012062
    » https://iopscience.iop.org/article/10.1088/1757-899X/227/1/012062
  • Ilin, I., Levaniuk, D., & Dubgorn, A. (2019). Assessment of Digital Maturity of Enterprises. Energy Management of Municipal Transportation Facilities and Transport, 167–177. Springer.
  • Isikli, E., Yanik, S., Cevikcan, E., & Ustundag, A. (2018). Project portfolio selection for the digital transformation era. In Ustundag, A., & Cevikcan, E., Industry 4.0: Managing the digital transformation (pp. 105–121). https://doi.org/10.1007/978-3-319-57870-5
    » https://doi.org/10.1007/978-3-319-57870-5
  • Ismail Abdelaal, M. H., Khater, M., & Zaki, M. (2017). Digital business transformation and strategy: What do we know so far? Cambridge Service Alliance http://dx.doi.org/10.13140/RG.2.2.36492.62086
    » http://dx.doi.org/10.13140/RG.2.2.36492.62086
  • Jacobi, R., & Brenner, E. (2018). How large corporations survive digitalization. In Linnhoff-Popien, C., Schneider, R., & Zaddach, M. (Eds.), Digital marketplaces unleashed (pp. 83–97). Springer.
  • Kane, G. C., Palmer, D., Phillips, A. N., Kiron, D., & Buckley, N. (2015). Strategy, not technology, drives digital transformation. MIT Sloan Management Review and Deloitte University Press, 14, 1–25. http://sloanreview.mit.edu/projects/strategy-drives-digital-transformation/
    » http://sloanreview.mit.edu/projects/strategy-drives-digital-transformation/
  • Karimi, J., & Walter, Z. (2015). The role of dynamic capabilities in responding to digital disruption: A factor-based study of the newspaper industry. Journal of Management Information Systems, 32(1), 39–81. https://doi.org/10.1080/07421222.2015.1029380
    » https://doi.org/10.1080/07421222.2015.1029380
  • Kitchenham, B., & Charters, S. (2007). Guidelines for performing systematic literature reviews in software engineering University of Durkham. https://www.elsevier.com/__data/promis_misc/525444systematicreviewsguide.pdf
    » https://www.elsevier.com/__data/promis_misc/525444systematicreviewsguide.pdf
  • Kolasa, I. (2017, June). Success factors for public sector information system projects: Qualitative literature review [Paper presentation]. Proceeding of the 17th European Conference on Digital Government Military Academy Lisbon Portugal, Academic Conferences and Publishing International Limited, Lisboa, Portugal (pp. 326–335). https://www.proquest.com/openview/b5e5ac910dcf68ba08ed0f05ac2d95ef/1?pq-origsite=gscholar&cbl=1796415
    » https://www.proquest.com/openview/b5e5ac910dcf68ba08ed0f05ac2d95ef/1?pq-origsite=gscholar&cbl=1796415
  • Koseoglu, O., & Nurtan-Gunes, E. T. (2018). Mobile BIM implementation and lean interaction on construction site: A case study of a complex airport project. Engineering, Construction and Architectural Management, 25(10), 1298–1321. https://doi.org/10.1108/ECAM-08-2017-0188
    » https://doi.org/10.1108/ECAM-08-2017-0188
  • Kouroubali, A., & Katehakis, D. G. (2019). The new European interoperability framework as a facilitator of digital transformation for citizen empowerment. Journal of biomedical informatics, 94,103166. https://doi.org/10.1016/j.jbi.2019.103166
    » https://doi.org/10.1016/j.jbi.2019.103166
  • Krasuska, M., Williams, R., Sheikh, A., Franklin, B. D., Heeney, C., Lane, W., Mozaffar, H., Mason, K., Eason, S., Hinder, S., Dunscombe, R., Potts, H. W. W., & Cresswell, K. (2020). Technological capabilities to assess digital excellence in hospitals in high performing health care systems: International eDelphi exercise. Journal of Medical Internet research, 22(8), e17022. https://doi.org/10.2196/17022
    » https://doi.org/10.2196/17022
  • Krumay, B., Rueckel, D., & Koch, S. (2019, December 15–18). Model for strategic positioning in transformative situations [Conference session]. ICIS 2019 Proceedings, Governance Strategy and Value of IS, Munich, Germany. https://aisel.aisnet.org/cgi/viewcontent.cgi?article=1325&context=icis2019
    » https://aisel.aisnet.org/cgi/viewcontent.cgi?article=1325&context=icis2019
  • Lappi, T. M., Aaltonen, K., & Kujala, J. (2019). Project governance and portfolio management in government digitalization. Transforming Government: People, Process and Policy, 13(2), 159–196. https://doi.org/10.1108/TG-11-2018-0068
    » https://doi.org/10.1108/TG-11-2018-0068
  • Li, J., Greenwood, D., & Kassem, M. (2019). Blockchain in the built environment and construction industry: A systematic review, conceptual models and practical use cases. Automation in Construction, 102, 288–307. https://doi.org/10.1016/j.autcon.2019.02.005
    » https://doi.org/10.1016/j.autcon.2019.02.005
  • Malmelin, N., & Virta, S. (2016). MANAGING CREATIVITY IN CHANGE: Motivations and constraints of creative work in a media organisation. Journalism Practice, 10(8), 1041–1054. https://doi.org/10.1080/17512786.2015.1074864
    » https://doi.org/10.1080/17512786.2015.1074864
  • Malmelin, N., & Villi, M. (2017). Media work in change: Understanding the role of media professionals in times of digital transformation and convergence. Sociology Compass, 11(7), e12494. https://doi.org/10.1111/soc4.12494
    » https://doi.org/10.1111/soc4.12494
  • Marek, J., Blümlein, K., Neubauer, J., & Wehking, C. (2019). Ditching labor-intensive paper-based processes: Process automation in a Czech insurance company [Paper presentation]. BPM (Industry Forum), (pp. 16–24). http://ceur-ws.org/Vol-2428/paper2.pdf
    » http://ceur-ws.org/Vol-2428/paper2.pdf
  • Mergel, I. (2016). Agile innovation management in government: A research agenda. Government Information Quarterly, 33(3), 516–523. https://doi.org/10.1016/j.giq.2016.07.004
    » https://doi.org/10.1016/j.giq.2016.07.004
  • Milosevic, D. Z., & Srivannaboon, S. (2006). A theoretical framework for aligning project management with business strategy. Project Management to Business Strategy, 37(3), 98–110. https://doi.org/10.1177/875697280603700310
    » https://doi.org/10.1177/875697280603700310
  • Mishra, S., Sree Devi, K. K., & Badri Narayanan, M. K. (2019a). People & process dimensions of automation in business process management industry. International Journal of Engineering and Advanced Technology, 8(6), 2465–2472. http://www.doi.org/10.35940/ijeat.F8555.088619
    » http://www.doi.org/10.35940/ijeat.F8555.088619
  • Mishra, S., Sree Devi, K. K., & Badri Narayanan, M. K. (2019b). Technology dimensions of automation in business process management industry. International Journal of Engineering and Advanced Technology, 8(6), 1919–1926. http://dx.doi.org/10.35940/ijeat.F8569.088619
    » http://dx.doi.org/10.35940/ijeat.F8569.088619
  • Moreira, F., Ferreira, M. J., & Seruca, I. (2018). Enterprise 4.0: The emerging digital transformed enterprise? Procedia Computer Science, 138, 525–532. https://doi.org/10.1016/j.procs.2018.10.072
    » https://doi.org/10.1016/j.procs.2018.10.072
  • Nataliia, Y., & Oleksii, Y. (2019, September 17–20). Conceptual groundwork of digital transformation of project management [Paper presentation]. IEEE 14th International Conference on Computer Sciences and Information Technologies (CSIT), Kyiv, Ukraine (vol. 3, pp. 85–88). https://doi.org/10.1109/STC-CSIT.2019.8929818
    » https://doi.org/10.1109/STC-CSIT.2019.8929818
  • Nerurkar, A., & Das, I. (2017, March 07–09). Analysis of DILRMP project: Identifying the applicability of agile project management for digital transformation projects in government and public sector [Paper presentation]. ICEGOV Proceedings of the Special Collection on eGovernment Innovations in India, New Delhi, India (pp. 34–38). https://doi.org/10.1145/3055219.3055242
    » https://doi.org/10.1145/3055219.3055242
  • Ngereja, B., Hussein, B., Hafseld, K. H. J., & Wolff, C. (2020, March 05–07). A Retrospective Analysis of the Role of Soft Factors in Digitalization Projects: Based on a Case Study in a Public Health Organization in Trondheim-Norway [Paper presentation]. 2020 IEEE European Technology and Engineering Management Summit (E-TEMS), Dortmund, Germany (pp. 1–7). https://doi.org/10.1109/E-TEMS46250.2020.9111790
    » https://doi.org/10.1109/E-TEMS46250.2020.9111790
  • Ochara, N. M., Nawa, E.-L., Fiodorov, I., Lebedev, S., Sotnikov, A., Telnovl, Y., & Kadyamatimba, A. (2018, October 3–5). Digital transformation of enterprises: A transition using process modelling antecedents [Paper presentation]. 2018 Open Innovations Conference (OI), Johannesburg, South Africa (pp. 325–331). https://doi.org/10.1109/OI.2018.8535735
    » https://doi.org/10.1109/OI.2018.8535735
  • Pacheco, A., Marín-Raventós, G., & López, G. (2018). Designing a technical debt visualization tool to improve stakeholder communication in the decision-making process: A case study. In A. M. Tjoa, M. Raffai, P. Doucek, & N. M. Novak (orgs), Research and Practical Issues of Enterprise Information Systems (vol. 327, pp. 15–26). Springer International Publishing. https://doi.org/10.1007/978-3-319-99040-8_2
    » https://doi.org/10.1007/978-3-319-99040-8_2
  • Papadonikolaki, E., van Oel, C., & Kagioglou, M. (2019). Organising and Managing boundaries: A structurational view of collaboration with Building Information Modelling (BIM). International Journal of Project Management, 37(3), 378–394. https://doi.org/10.1016/j.ijproman.2019.01.010
    » https://doi.org/10.1016/j.ijproman.2019.01.010
  • Parker, D., Charlton, J., Ribeiro, A., & Pathak, R. D. (2013). Integration of project-based management and change management: Intervention methodology. International Journal of Productivity and Performance Management, 62(5), 534–544. https://doi.org/10.1108/IJPPM-10-2012-0108
    » https://doi.org/10.1108/IJPPM-10-2012-0108
  • Parviainen, P., Tihinen, M., Kääriäinen, J., & Teppola, S. (2017). Tackling the digitalization challenge: How to benefit from digitalization in practice. International Journal of Information Systems and Project Management, 5(1), 63–77. http://dx.doi.org/10.12821/ijispm050104
    » http://dx.doi.org/10.12821/ijispm050104
  • Perides, M. P. N., Vasconcellos, E. P. G., & Vasconcellos, L. (2020). Change management in digital transformation projects: Case study in a financial organization. Revista de Gestão e Projetos, 11(1), 54–73. https://doi.org/10.5585/gep.v11i1.16087
    » https://doi.org/10.5585/gep.v11i1.16087
  • Pollock, A., & Berge, E. (2018). How to do a systematic review. International Journal of Stroke, 13(2), 138–156. https://doi.org/10.1177/1747493017743796
    » https://doi.org/10.1177/1747493017743796
  • Priambodo, A., Handayani, P. W., & Pinem, A. A. (2019). Success factor for it project implementation in banking industry: A case study [Paper presentation]. 3rd International Conference on Informatics and Computational Sciences (ICICoS), Semarang, Indonesia (pp. 1-5). https://doi.org/10.1109/ICICoS48119.2019.8982404
    » https://doi.org/10.1109/ICICoS48119.2019.8982404
  • Rojas, A. E., & Mejıa-Moncayo, C. (2019, November). Students’ perception of a postgraduate course in agile project management aimed at developing soft skills [Paper presentation]. CEUR Workshop Proceedings (pp. 194-204). http://ceur-ws.org/Vol-2486/icaiw_edusynergies_6.pdf
    » http://ceur-ws.org/Vol-2486/icaiw_edusynergies_6.pdf
  • Sanchez, M. A., & Zuntini, J. I. (2018). Organizational readiness for the digital transformation: A case study research. Journal of Management & Technology, 18(2), 70-99. http://dx.doi.org/10.20397/2177-6652/2018.v18i2.1316
    » http://dx.doi.org/10.20397/2177-6652/2018.v18i2.1316
  • Sánchez, M. A. (2017). A framework to assess organizational readiness for the digital transformation. Dimensión Empresarial, 15(2), 27-40. https://doi.org/10.15665/rde.v15i2.976
    » https://doi.org/10.15665/rde.v15i2.976
  • Schmitz, M., Dietze, C., & Czarnecki, C. (2019). Enabling digital transformation through robotic process automation at Deutsche Telekom. In Urbach, N., Röglinger, M. (Eds.), Digitalization cases (pp. 15-33). Springer, Cham. https://link.springer.com/chapter/10.1007/978-3-319-95273-42
    » https://link.springer.com/chapter/10.1007/978-3-319-95273-42
  • Schuh, G., Anderl, R., Gausemeier, J., ten Hompel, M., & Wahlster, W. (2017). Industrie 4.0 maturity index. Acatech: National Academy of Science and Engineering.
  • Scott, I. A., Sullivan, C., & Staib, A. (2019). Going digital: A checklist in preparing for hospital-wide electronic medical record implementation and digital transformation. Australian Health Review, 43(3), 302-313. https://doi.org/10.1071/AH17153
    » https://doi.org/10.1071/AH17153
  • Shamim, S., Cang, S., Yu, H., & Li, Y. (2016). Management approaches for Industry 4.0: A human resource management perspective [Paper presentation]. 2016 IEEE Congress on Evolutionary Computation (CEC), Vancouver, BC, Canada (pp. 5309-5316). http://dx.doi.org/10.1109/CEC.2016.7748365
    » http://dx.doi.org/10.1109/CEC.2016.7748365
  • Shaughnessy, H. (2018). Creating digital transformation: Strategies and steps. Strategy & Leadership, 46(2), 19-25. http://dx.doi.org/10.1108/SL-12-2017-0126
    » http://dx.doi.org/10.1108/SL-12-2017-0126
  • Shenhar, A. J., Dvir, D., Levy, O., & Maltz, A. C. (2001). Project success: A multidimensional strategic concept. Long Range Planning, 34(6), 699-725. https://doi.org/10.1016/S0024-6301(01)00097-8
    » https://doi.org/10.1016/S0024-6301(01)00097-8
  • Silvaggi, A., & Pesce, F. (2018). Job profiles for museums in the digital era: Research conducted in Portugal, Italy and Greece within the Mu. SA project. Journal of Cultural Management and Policy, 8(1), 56–69. https://www.encatc.org/media/4535-encatc_journal_vol8_issue1_silvaggi_pesce.pdf
    » https://www.encatc.org/media/4535-encatc_journal_vol8_issue1_silvaggi_pesce.pdf
  • Singh, V. (2016). BIM ecosystem research: What, why and how? Framing the directions for a holistic view of BIM [Paper presentation]. IFIP Advances in Information and Communication Technology (vol. 492). https://doi.org/10.1007/978-3-319-54660-5_39
    » https://doi.org/10.1007/978-3-319-54660-5_39
  • Müller, R., & Jugdev, K. (2012). Critical success factors in projects: Pinto, Slevin, and Prescott-The elucidation of project success. International Journal of Managing Projects in Business, 5(4), 757–775.
  • Svejvig, P., & Andersen, P. (2015). Rethinking project management: A structured literature review with a critical look at the brave new world. International Journal of Project Management, 33(2), 278–290. https://doi.org/10.1016/j.ijproman.2014.06.004
    » https://doi.org/10.1016/j.ijproman.2014.06.004
  • Tchana, Y., Ducellier, G., & Remy, S. (2019). Designing a unique Digital Twin for linear infrastructures lifecycle management. Procedia CIRP, 84, 545–549. https://doi.org/10.1016/j.procir.2019.04.176
    » https://doi.org/10.1016/j.procir.2019.04.176
  • Teizer, J., Wolf, M., Golovina, O., Perschewski, M., Propach, M., Neges, M., & König, M. (2017). Internet of Things (IoT) for integrating environmental and localization data in Building Information Modeling (BIM) [Paper presentation]. Proceedings of the 34th International Symposium on Automation and Robotics in Construction, Taipei, Taiwan (pp. 603–609). https://doi.org/10.22260/ISARC2017/0084
    » https://doi.org/10.22260/ISARC2017/0084
  • Teubner, R. A. (2019). An exploration into IT programs and their management: Findings from multiple case study research. Information Systems Management, 36(1), 40–56. https://doi.org/10.1080/10580530.2018.1553648
    » https://doi.org/10.1080/10580530.2018.1553648
  • Tranfield, D., Denyer, D., & Smart, P. (2003). Towards a methodology for developing evidence-informed management knowledge by means of systematic review. British Journal of Management, 14(3), 207–222. https://doi.org/10.1111/1467-8551.00375
    » https://doi.org/10.1111/1467-8551.00375
  • Tsurkan, M. V., Mironova, S. M., & Pilipchuk, N. V. (2019, April 14–15). Digital transformation of project implementation monitoring in the regional public management [Paper presentation]. Proceedings of the 1st International Scientific Conference “Modern Management Trends and the Digital Economy: From Regional Development to Global Economic Growth”, Yekaterinburg, Russia (pp. 80–85). https://dx.doi.org/10.2991/mtde-19.2019.15
    » https://dx.doi.org/10.2991/mtde-19.2019.15
  • Vukšić, V. B., Ivančić, L., & Vugec, D. S. (2018). A preliminary literature review of digital transformation case studies. International Journal of Computer and Information Engineering, 12(9), 737-742. http://dx.doi.org/10.5281/zenodo.1474581
    » http://dx.doi.org/10.5281/zenodo.1474581
  • Wagner, T., Herrmann, C., & Thiede, S. (2018). Identifying target oriented Industrie 4.0 potentials in lean automotive electronics value streams. Procedia CIRP, 72, 1003-1008. https://doi.org/10.1016/j.procir.2018.03.003
    » https://doi.org/10.1016/j.procir.2018.03.003
  • Walker, D., & Lloyd-Walker, B. (2019). The future of the management of projects in the 2030s. International Journal of Managing Projects in Business, 12(2), 242-266. htps://doi.org/10.1108/IJMPB-02-2018-0034
    » htps://doi.org/10.1108/IJMPB-02-2018-0034
  • Wiedemann, A., Forsgren, N., Wiesche, M., Gewald, H., & Krcmar, H. (2019). Research for practice: The DevOps phenomenon. Communications of the ACM, 62(8), 44-49. http://dx.doi.org/10.1145/3331138
    » http://dx.doi.org/10.1145/3331138
  • Wessel, L., Baiyere, A., Ologeanu-Taddei, R., Cha, J., & Jensen, TB. (2021). Unpacking the difference between digital transformation and IT-enabled organizational transformation. Journal of the Association for Information Systems, 22(1), 102-129. https://doi.org/10.17705/1jais.00655
    » https://doi.org/10.17705/1jais.00655
  • Williams, S. P., & Schubert, P. (2018). Designs for the digital workplace. Procedia Computer Science, 138, 478-485. https://doi.org/10.1016/j.procs.2018.10.066
    » https://doi.org/10.1016/j.procs.2018.10.066
  • Wolff, C., Omar, A., & Shildibekov, Y. (2019, September). How will we build competences for managing the digital transformation?. In 2019 10th IEEE International Conference on Intelligent Data Acquisition and Advanced Computing Systems: Technology and Applications (IDAACS) (Vol. 2, pp. 1122-1129). IEEE. https://doi.org/10.1109/IDAACS.2019.8924432
    » https://doi.org/10.1109/IDAACS.2019.8924432
  • Wolff, C., Verenych, O., & Kevorkova, S. (2020, February 18-20). Digital transformation time: Research results for Ukrainian community [Paper presentation]. 1st International Workshop IT Project Management (ITPM), Lviv, Slavsko, (pp. 46-57). http://www.chrome-extension://efaidnbmnnnibpcajpcglclefind mkaj/http://ceur-ws.org/Vol-2565/paper5.pdf
    » http://www.chrome-extension://efaidnbmnnnibpcajpcglclefind mkaj/http://ceur-ws.org/Vol-2565/paper5.pdf
  • Woodhead, R., Stephenson, P., & Morrey, D. (2018). Digital construction: From point solutions to IoT ecosystem. Automation in Construction, 93, 35-46. https://doi.org/10.1016/j.autcon.2018.05.004
    » https://doi.org/10.1016/j.autcon.2018.05.004

Publication Dates

  • Publication in this collection
    23 June 2023
  • Date of issue
    2023