| Waste separation to optimize waste reuse and recycling |
13 |
65 |
| Reuse of formworks and props on the construction site |
13 |
65 |
| Special procedures for handling and disposal of toxic substances |
10 |
50 |
| Reuse and recycling of on-site generated waste |
8 |
40 |
| Identification, qualification, and quantification of the waste |
6 |
30 |
| Commitment of employees working on the construction site |
6 |
30 |
| Appointment of a person responsible for waste management or inspection |
5 |
25 |
| Operational control (forms, weighing certificates, counting containers) |
4 |
20 |
| None |
3 |
15 |
| Waste production |
|
|
| Project compatibility |
13 |
65 |
| Modulation of construction components to prevent losses |
11 |
55 |
| Standardization of formworks to avoid waste of wood |
11 |
55 |
| Choice of products and systems that produce less waste |
11 |
55 |
| Packing of waste in appropriate containers |
11 |
55 |
| Waste management plan integrated with the construction site plan |
4 |
20 |
| Use of sustainable materials to reuse or recycle in the construction |
2 |
10 |
| None |
1 |
5 |
| Sound pollution |
|
|
| Planning tasks to minimize disturbance in the neighborhood |
7 |
35 |
| Choice of materials and machines to reduce acoustic disturbance |
6 |
30 |
| Positioning fixed or noisy devices to avoid noise reverberation |
3 |
15 |
| Planning a vehicle traffic schedule at the construction site |
1 |
5 |
| None |
9 |
45 |
| Visual pollution |
|
|
| Constant maintenance of sidings on the construction site |
15 |
75 |
| Conservation and protection of existing green areas during work |
7 |
35 |
| Limitation of areas in the waste production and storage sectors |
6 |
30 |
| Soil irrigation and installation of equipment or system to reduce dust |
4 |
20 |
| Paving stones from the construction site pathways |
3 |
15 |
| None |
3 |
15 |
| Water and soil pollution |
|
|
| Sewage treatment and correct disposal |
13 |
65 |
| Preservation of existing watercourses |
12 |
60 |
| No release of polluting residues in sanitation networks |
10 |
50 |
| Specific and well-marked storage for potentially polluting products |
5 |
25 |
| No burial of waste on site |
5 |
25 |
| Signaling tanks, vats, and pumps according to their contents |
2 |
10 |
| Installation of recovery and treatment systems for polluting effluents |
2 |
10 |
| None |
2 |
10 |
| Energy consumption |
|
|
| Monitoring electricity consumption |
9 |
45 |
| Adoption of corrective measures to avoid waste |
9 |
45 |
| Choice for materials and machines that consume less energy |
7 |
35 |
| None |
4 |
20 |
| Water consumption |
|
|
| Adoption of corrective measures to avoid waste |
11 |
55 |
| Monitoring water consumption |
9 |
45 |
| Collection of rainwater to wash the construction site |
9 |
45 |
| Reduction in water consumption in the quarters of the construction site |
5 |
25 |
| Choice for materials and machines that consume less water |
3 |
15 |
| None |
3 |
15 |