Waste separation to optimize waste reuse and recycling |
13 |
65 |
Reuse of formworks and props on the construction site |
13 |
65 |
Special procedures for handling and disposal of toxic substances |
10 |
50 |
Reuse and recycling of on-site generated waste |
8 |
40 |
Identification, qualification, and quantification of the waste |
6 |
30 |
Commitment of employees working on the construction site |
6 |
30 |
Appointment of a person responsible for waste management or inspection |
5 |
25 |
Operational control (forms, weighing certificates, counting containers) |
4 |
20 |
None |
3 |
15 |
Waste production |
|
|
Project compatibility |
13 |
65 |
Modulation of construction components to prevent losses |
11 |
55 |
Standardization of formworks to avoid waste of wood |
11 |
55 |
Choice of products and systems that produce less waste |
11 |
55 |
Packing of waste in appropriate containers |
11 |
55 |
Waste management plan integrated with the construction site plan |
4 |
20 |
Use of sustainable materials to reuse or recycle in the construction |
2 |
10 |
None |
1 |
5 |
Sound pollution |
|
|
Planning tasks to minimize disturbance in the neighborhood |
7 |
35 |
Choice of materials and machines to reduce acoustic disturbance |
6 |
30 |
Positioning fixed or noisy devices to avoid noise reverberation |
3 |
15 |
Planning a vehicle traffic schedule at the construction site |
1 |
5 |
None |
9 |
45 |
Visual pollution |
|
|
Constant maintenance of sidings on the construction site |
15 |
75 |
Conservation and protection of existing green areas during work |
7 |
35 |
Limitation of areas in the waste production and storage sectors |
6 |
30 |
Soil irrigation and installation of equipment or system to reduce dust |
4 |
20 |
Paving stones from the construction site pathways |
3 |
15 |
None |
3 |
15 |
Water and soil pollution |
|
|
Sewage treatment and correct disposal |
13 |
65 |
Preservation of existing watercourses |
12 |
60 |
No release of polluting residues in sanitation networks |
10 |
50 |
Specific and well-marked storage for potentially polluting products |
5 |
25 |
No burial of waste on site |
5 |
25 |
Signaling tanks, vats, and pumps according to their contents |
2 |
10 |
Installation of recovery and treatment systems for polluting effluents |
2 |
10 |
None |
2 |
10 |
Energy consumption |
|
|
Monitoring electricity consumption |
9 |
45 |
Adoption of corrective measures to avoid waste |
9 |
45 |
Choice for materials and machines that consume less energy |
7 |
35 |
None |
4 |
20 |
Water consumption |
|
|
Adoption of corrective measures to avoid waste |
11 |
55 |
Monitoring water consumption |
9 |
45 |
Collection of rainwater to wash the construction site |
9 |
45 |
Reduction in water consumption in the quarters of the construction site |
5 |
25 |
Choice for materials and machines that consume less water |
3 |
15 |
None |
3 |
15 |