Open-access Optimization of Bench Geometry for Efficient Slope Stability and Overburden Removal in Open Pit Mining

Abstract

Open-pit mining operations require a careful balance between maintaining slope stability and minimizing the amount of overburden to be removed. In this study, different bench geometries were examined to determine the most efficient configuration that satisfies both safety and economic considerations. Thirteen pit models were created and analyzed through finite element simulations, and the results were further evaluated using the Response Surface Methodology (RSM) based on a three-factor, three-level Box–Behnken experimental design. The analysis focused on three key parameters: bench height (H), berm width (W), and bench slope angle (β). Optimization was carried out to achieve a factor of safety (FoS) of at least 1.2 while minimizing overburden removal. The optimal design was obtained for H = 8 m, W = 8 m, and β = 75°, yielding a FoS of 1.23 and a stripping ratio of about 20.6 m³/ton. Verification through finite element modeling confirmed the reliability of the proposed model with 98.3% accuracy. The findings emphasize that integrating numerical modeling with experimental optimization techniques can effectively guide safe and economically viable open-pit designs.

Key words
Finite element analysis; Stripping ratio; Overburden; Bench geometry; Optimization

INTRODUCTION

Open-pit mining bench design is critically important for the safe, efficient, and environmentally minimal-impact operations of mining sites. This design involves determining bench height, berm width, slope angle, and number of benches. These parameters were determined by considering the geotechnical properties of rock samples taken from the mining site, economic factors, environmental impacts, and occupational health and safety standards (Hartman & Mutmansky 2002, Hustrulid et al. 2013). The height of the benches and berm width created in open-pit mines are fundamental design elements in open-pit mining. Bench heights typically range between 10-15 meters, depending on the type of mine and geotechnical properties. Bench heights in open-pit mines are mainly determined by equipment capacity, geotechnical conditions, and safety requirements. Industry practice typically lies in the range of 10–15 m, which has been widely reported in design manuals, case studies, and practical engineering applications (Guo et al. 2024). This range reflects a balance between operational efficiency and slope stability in most large-scale operations. Higher benches can improve blasting efficiency, whereas lower benches can enhance work safety and slope stability (Hustrulid et al. 2013). The berm width was determined to provide maneuverability for vehicles operating within the pit and to ensure a safe working area. It typically ranges between 1.5 to 2 times the bench height (Hartman & Mutmansky 2002). The slope angle of the benches should be carefully designed to minimize the risk of slope failure. Depending on the rock mass properties, steep benches reduce material transportation costs, whereas low-angle benches can enhance slope stability (Hustrulid et al. 2013). Geotechnical analyses conducted during bench design determine the physical and mechanical properties of the rock mass, thereby supporting stability analyses. These analyses include parameters such as rock mass classification, shear resistance, and uniaxial–triaxial compressive strengths of rocks (Hartman & Mutmansky 2002).

Computer-aided design (CAD) and modeling have significantly advanced open-pit mining in recent years, playing critical roles in enhancing the efficiency, safety, and economic success of mining operations. Current studies contribute significantly to bench design, geotechnical analysis, production planning, and environmental impact assessment using various software and methods. CAD software is widely used in open-pit mining for production and operational planning. Specifically, software such as Maptek Vulcan, Dassault Systèmes GEOVIA Surpac, and Datamine assist mining engineers in modeling mineral resources, estimating reserves, designing benches, and planning long-term production. These software applications optimize mining processes by reducing costs and increasing production efficiency (Dassault Systemes 2021, Maptek 2021). Modern CAD software also plays a significant role in conducting geotechnical analyses and slope-stability assessments. Software such as Rocscience and Itasca are critical tools for geotechnical modeling in open-pit mining. These software applications analyze the mechanical properties of rocks to determine the slope stability and potential failure risks (Rocscience 2021).

Researchers have developed various algorithms, such as dynamic programming, graph theory, the moving cone method, genetic algorithms, and artificial neural networks, to solve optimization problems in mining. Optimization of ultimate pit limits and geometry in open-pit mining has long been a central topic of research. The mathematical foundation of open-pit optimization was first established by (Lerchs 1965), whose work guided many subsequent developments. Dynamic programming–based approaches enabled three-dimensional ultimate pit design (Johnson & Sharp 1971, Koenigsberg 1982, Wilke & Wright 1984) and were later enhanced through the use of computer graphics to improve practical applicability (Zhang & Starfield 1985). The integration of the Lerchs–Grossmann algorithm with solid modeling techniques represented a significant advancement in pit optimization (Stuart 1992). In addition to these methods, improved versions of the Floating Cone approach (Elahi et al. 2012) and newly proposed optimization algorithms (Zhao & Kim 1992) have contributed alternative solutions, while more recent pseudoflow-based methods have increased computational efficiency in determining optimal open-pit limits (Bai et al. 2017). Most of these optimization studies have focused on determining the ultimate pit problem. However, estimates of mineral resources that can be extracted using open-pit mining methods should consider economic limits and technical requirements, such as slope angles (CIM 2019). The slope angle of the pit wall is a critical factor that affects the dimensions and contours of the pit. Once the permissible stripping ratios are established, it is necessary to determine the final pit slope. Ideally, the slopes should be as steep as possible to reduce the volume of extracted rock and lower mining expenses. However, excessively steep slopes can lead to slope failure, which can have catastrophic economic ramifications (Stacey et al. 2003).

Several experiments and numerical analyses have been conducted in open-pit mining environments to design effectively either (i) the slope layout, which refers to the geometrical arrangement of benches on the pit wall to prevent rockfall propagation, or (ii) protective mitigation measures tailored to specific geometries. Various slope configurations involving single or multiple benches have been examined, resulting in several charts or design recommendations (Agosti et al. 2021, Alejano et al. 2007, Ferrari et al. 2016, Giacomini et al. 2012, Pierson et al. 2001, Ritchie 1963). Some of these are summarized below. Soltanmohammadi et al. (2010) noted that determining a practical bench height is crucial in open-pit mining. It has consistently posed challenges owing to various and occasionally conflicting criteria that must be meticulously evaluated in mine design. Their study employed a multi-expert multi-criteria decision-making approach to address these complexities. In this methodology, different bench heights are initially considered based on diverse criteria, including production scheduling, dilution, cost, feasibility, safety, and equipment availability. In their study, they used the VIKOR (Vlse Kriterijumska Optimizacija I Kompromisno Resenje) method, introduced by (Opricovic & Tzeng 2002, 2004, 2007), which is a compromise ranking method designed to optimize the aggregation of different criteria scores for various bench heights simultaneously. In their study Altuntov & Erkayaoğlu (2021) proposed an algorithm that uses a cone-based method to incorporate multiple Overall Slope Angles into the optimization. They supported their work with a geotechnical study that defined the overall slope angle necessary for safe production. Gibson et al. (2006) emphasized that the overall slope angle depends on the bench geometry and is limited by the characteristics of the rock mass. They indicated that bench height, berm width, and bench slope angle meeting the stability criteria can be utilized in open-pit design. For this purpose, they investigated the relationship between bench geometry combinations and the slope stability. As a result, they suggested increasing the bench slope angle to prevent rockfalls and avoiding low angles such as 65°. They found that changes in bench height did not significantly impact rockfalls. However, they recommended an optimal bench slope angle of approximately 75° to limit the movement distance and reduce the number of falling rocks. However, they did not mention rock mass properties. Borges et al. (2023) presents a multi-objective optimization framework for slope geometry in an open-pit phosphate mine in Brazil, integrating geotechnical, hydrogeological, and economic factors under various groundwater drawdown scenarios. The optimal solution—using 11 horizontal drains and 1 pumping well—achieved safe slope stability and significantly reduced the waste-to-ore ratio, enhancing both safety and cost-efficiency. In recent years, studies on open-pit slope stability have increasingly emphasized the importance of understanding rock mass behavior and stress redistribution near pit walls. Saik et al. (2024) examined the mechanical state of rock masses in near-wall zones of open-pit quarries and discussed how stress and deformation patterns influence slope stability management. Their work highlights the need to incorporate rock mass response into stability assessments to ensure safe and sustainable quarry operations.

In a similar context, Zerradi et al. (2023) investigated slope stability in an open-pit mine in Morocco using deterministic block theory. Their study focused on the role of discontinuity geometry and block movement in controlling potential failure mechanisms. The results demonstrated that considering structural and geometrical characteristics of rock masses can significantly improve the reliability of slope stability design.

Most of previous studies mentioned above on open-pit mine design have often overlooked the importance of bench geometry, focusing solely on the overall slope angle and calculating the factor of safety (FoS) based on a planar surface. This approach can be misleading, as it fails to account for variations in rock mass properties with depth and the significant impact of bench geometry on slope stability and overburden removal. Furthermore, evaluating solely based on the overall slope angle for the lowest overburden removal and slope stability is insufficient for optimization.

In practice, bench geometry becomes significant alongside the appropriate overall slope angle. To address this gap, this study examines different bench geometries, including bench slope angle, bench height, and berm width, in addition to the overall slope angle. Finite element analysis is conducted to investigate the stresses in 13 different pit geometries and a mathematical model is developed to understand how each variable affects normal stress, the factor of safety (FoS), and overburden removal. The impacts of bench geometry on normal stress, FoS, and overburden removal are elucidated. Based on the mathematical model obtained, optimization is performed to ensure a factor of safety (FoS ≥ 1.2) and the minimum required overburden removal.

Study Site

The open-pit plans are designed considering the mine design parameters and rock mass properties used in coal fields operated in Kütahya Province, Turkey. In the selected study area of Kütahya Province, there are operable quantities of coal with viable quality in the regions of Seyitomer, Tavsanli, Gediz, Emet, Altıntas, Simav, and Domanic. Many of these fields in Kütahya Province, offering visible reserves of over 500 million tons, continue to operate coal mining activities. Additionally, there are closed fields that operated in the past (Özburan 2023). These fields are storage areas for economically significant Miocene sediments containing coal deposits in Western Anatolia, Turkey. The lithological section of the region is provided in Supplementary Material - Figure S1.

Open Pit Planning Studies

Determining the location, thickness, and boundaries of the coal seam to be extracted, along with selecting the bench sizes, are crucial for estimating the amount of iste rock stripped off. For open pit modeling, three-dimensional mathematical models of the coal seam have been generated. This allows for determining the thickness, dip, and reserve quantity of the coal seam. The average dip of the coal seam is 7.50. According to the created model, the total coal reserve is calculated to be 2,063,315.2 tons. The coal density is assumed to be 1.45 tons/m3. After establishing the coal model, various design parameters, including bench heights and slope angles used in the region (within suitable ranges for the mathematical approach model), are considered. As a result, 13 different pit designs are modeled. The open pit plans are designed using the Micromine software program (Micromine 2017). Detailed information regarding the models created in Table I is provided. According to these models, the lowest stripping ratio is 18.8 m3/ton, while the highest stripping ratio is 31.5 m3/ton.

Table I
Technical details of the created open pit models.

Thirteen cross-sections are obtained for each pit design along the same section line. For instance, Figure S2 shows the plan view, perspective view, and cross-section of the open pit model for pit-13 as an example of the study.

Since this study is based entirely on theoretical simulations and does not involve human participants or animal experimentation, ethics committee approval was not required.

Finite Element Back-Analysis Modelling

Identification of Rock Material and Rock Mass Parameters

Within the scope of this study, 13 different models with varying bench geometries were created for the coal site operated by open-pit mining and detailed in Table I. Before the creation of the site models, data from previous scientific studies on rock samples taken from the region were considered to determine rock mass parameters. The predominant rock structure of the site was considered during the model creation process, and the geomechanical parameters of these formations are presented in Table II.

Table II
Physical and mechanical properties of intact coal and surrounding rocks (Destanoglu et al. 2000, Kose et al. 1994, Malli & Yetkin 2019, Ozfirat 2007, Yasitli & Unver 2005).

Due to the representation of the site as a mass in the modeling studies conducted in the mining area, in the following stage, the rock mass parameters were found using the RocData software (RocData 2014), considering the rock material properties outlined in Table II. The process of obtaining rock mass data is in Figure S3.

The rock mass data calculated using the RocData software, based on the rock material properties provided in Table II, are presented in Table III.

Table III
Rock mass data used in the model.

Using the equations proposed by Sheorey (1994), the horizontal/vertical stress ratio in the field was calculated as 0.26. This value was assigned to the created site models. It ensured the most accurate representation of the site in the model.

k = 0.25 + 7 × E × ( 0.001 + 1 z ) (1)

Here, k is defined as the ratio of horizontal in-situ stress to vertical in-situ stress, E is the average modulus of elasticity (GPa) of the rock masses in the vertical direction up to the working depth, and z is the working depth (m).

The numerical data presented in Table II, Table III and Figure S3 form the basis for understanding the mechanical behavior of the rock masses used in this study. The parameters listed in Table II, such as uniaxial compressive strength, cohesion, and internal friction angle, were essential in determining how each lithological unit responds under stress. As shown in Figure S3, these laboratory-derived properties were converted into rock mass parameters using the RocData software to better represent in-situ conditions. This step ensured that the subsequent finite element analyses realistically captured the mechanical response of the pit slopes. By linking these parameters with the optimization process, the study establishes a clear relationship between the material properties and the overall goal of achieving a stable and efficient bench geometry.

Creation of site models

After determining the mass parameters, the modeling phase of the site was initiated. The formation data, as shown in Figure S1 and varying with depth, were consistently applied across the models, and the calculated mass data from Table III were entered into the respective areas. Within the scope of this study, a maximum depth of 200 m was selected for the 13 modelled open pits, and the rock mass data were computed accordingly. An example of a site model is shown in Figure S4.

Detection of Stress Conditions

Thirteen field models were simulated, and the vertical stress and vertical displacement values at the benches were calculated. During the calculation of the vertical stress values, a total of 50 data points were collected along a 388-meter line on the left benches of the mines. Similarly, 50 data points were collected along a 104-meter line on the right benches. Across the 13 field models, 1300 vertical stress values were collected, with 650 readings from the right benches and 650 from the left benches. The obtained vertical stress values are listed in Tables IV and V, respectively. The process of reading the measurement lines and stress values on the models is shown in Figure S5. The vertical stress distributions on the benches in the created models are shown in Figure S6.

Table IV
Vertical stress values occurring on the left benches of the open-pit.
Table V
Vertical stress values occurring on the right benches of the open-pit.
Experimental Modelling

The pit design and amount of overburden can be improved by adjusting the levels of operational parameters to provide the best conditions for an open pit mine. For this reason, the effects of bench geometry parameters are crucial to understanding the pit design. Testing all parameters across their entire range is impractical due to the time it consumes. Therefore, a well-structured experimental test program is essential. Hence, a carefully designed experimental program is necessary to evaluate how each factor influences the normal stress, FoS value and amount of removed overburden.

Box & Behnken (1960) developed an efficient three-level design for second-degree response surfaces. Each factor has three levels. The number of experimental points for the Box-Behnken design is determined by the equation N=2np(np-1)+nc. In this equation, np represents the number of levels, and nc indicates the number of central experiments (Myers et al. 2016).

After creating the experimental design, a second-degree polynomial is provided to model the dependent variables (FoS and amount of removed overburden) that explain the relationship.

y n = β 0 + β 1 x 1 + β 2 x 2 + β 3 x 3 + β 4 x 1 2 + β 5 x 2 2 + β 6 x 3 2 + β 7 x 1 x 2 + β 8 x 1 x 3 + β 9 x 2 x 3 (2)

Equation 2 represents the dependent variables, yn (weight-based clean coal amount and clean coal ash content), as a function of independent variables encoded in x1, x2, and x3.

β0 is the regression coefficient,

β1–β3 are the linear coefficients,

β4–β6 are the second-degree coefficients,

and β7–β9 are the interaction coefficients.

The list of the independent variables with their coded and actual levels for the open-pit design is presented in Table VI. In the present study, only the 3 important structural variables of open-pit design which influence the slope stability (bench height (H), berm width (W), bench slope angle (β)) are considered and each is varied at three different levels as indicated in Table VI. Mathematical model equations are derived using experimental data and the mathematical software package (Minitab 2017).

Table VI
Variables and levels for Box-Behnken design of pit design.
Modelling of pit design

In the study, a total of thirteen tests are conducted. The data collected from the field models that is created using Phase2D (Rocscience 2015) software are used to construct the empirical models representing normal stress and factor of safety (FoS) as process responses to the independent variables. The results obtained from the design are presented in Table VII.

Table VII
Box-Behnken experimental design matrix using three-levels and three-factors and their predicted results.

A total of 13 different pit design were analyzed using response surface methodology (RSM) and three-level, three-factor Box-Behnken experimental design. The statistical analyses were performed using Minitab 17 program. The results were tested statistically at confidence interval of 95% with analysis of variance (ANOVA).

Table VII also shows the predicted values of the process according to the variables. The actual model equations for normal stress, FoS and amount of removed overburden were as in Equations 3,4 and 5 respectively.

Normal stress ( MPa ) = - 0.427 - 0.0389 H - 0.0451 W + 0.0301 β
 + 0.00255 H * H + 0.001330 W * W - 0.000217 β * β - 0.000642 H * W + 0.000376 H * β Normal stress ( MPa ) = - 0.427 - 0.0389 H - 0.0451 W + 0.0301 β
 + 0.00255 H * H + 0.001330 W * W - 0.000217 β * β - 0.000642 H * W + 0.000376 H * β (3)
​FoS=12.15-0.2121H-0.1874W-0.2594β+0.01173H*H
+0.01177W*W+0.002034β*β+0.00279H*W-0.001599H*β-0.000723W*β (4)
Amount of Removed Overburden = 133777117 - 8174043 H + 6275801 W - 1844531 β
 + 328916 H * H + 48620 W * W + 8859 β * β - 340193 H * W + 38410 H * β - 21578 W * β (5)

The models are found to fit the data well, with very small differences between the test data and the estimated values. The graph in Figure S7 shows the actual values obtained from the tests plotted against the predicted values. The coefficient of multiple determination (R2) of quadratic regression equation for normal stress and FoS is calculated as 0.986 and 0.992 respectively, indicating that the regression is significant as illustrated in Figure S7.

According to Table VIII the F value for the model is 91.85. The model is considered significant, as its F value are high and P value is less than 0.05. Additionally, the lack of fit value for model is 0.582, indicating a not significant lack of fit. For the equation representing normal stress, the significant model terms are H, W, β.

Table VIII
ANOVA table derived for the normal stress model.

The predicted response of the process concerning the independent variables is visually represented in three-dimensional (3D) space to aid in visualizing the form of the response surface in Figure S8 and Figure S9.

Figure S8 and Figure S9 illustrate the impact of bench height, bench slope angle, and berm width on normal stress and FoS values, respectively. As bench height and bench slope angle increase while berm width decreases, the normal stress values tend to rise, also with that trend FoS values becomes lower. This can be explained with, higher bench heights result in a greater mass of material above any given point and the weight of the overlying material concentrates more stress on the foundation. For bench slope angle, gentler slopes allow for more lateral distribution of the load, which can alleviate some of the vertical stress. Steeper slopes, however, contribute more directly to vertical stress as the material above pushes downwards more forcefully. Wider berms provide additional support and stability to the bench. This helps in distributing the vertical load more evenly, potentially reducing the stress at any single point. Since normal stress and FoS values are directly correlated, an increase in normal stress results in a decrease in FoS values.

The significance test of model fit for FoS is performed using an analysis of variance (ANOVA). The results showed that the models is significant as the F value is high and the Prob > F(p-value) is lower than 0.05 (Table IX). The lack-of-fit value is found as 0.33 for the FoS model. A “lack-of-fit value” of > 0.05 implies that the lack of fit is not significant for the model (Ye et al. 2018).

Table IX
ANOVA table derived for the FoS model.
Response Optimization

Response optimization has been performed based on FoS and amount of removed overburen models. For the optimization, a FoS value of 1.2 was used to calculate the minimum amount of overburden. The amount of overburden and parameter values obtained from the optimization results are presented in the Table X.

Table X
Optimization results.

Since the results obtained were challenging to apply in practice, the parameters were rounded to the nearest values. After this adjustment, normal stress, FoS, and the amount of overburden were calculated using equations 1, 2, and 3, respectively. Final optimization results given in Table XI.

Table XI
Optimization results after adjustments.

Response optimization has been performed using Minitab 17 based on FoS and amount of removed overburden models. Minitab 17 software calculates an individual desirability for each response and these values are combined to determine the composite, or overall, desirability of the multi-response system. An optimal solution occurs where composite desirability obtains its maximum. Desirability has a range of zero to one. One represents the ideal case; zero indicates that one or more responses are outside their acceptable limits. The optimization was based on second-order polynomial models and a desirability index (D) integrating the factor of safety (FoS) and the amount of removed overburden. A multi-response desirability function was defined to constrain the FoS to a minimum target value of 1.2 while minimizing the removed overburden. The individual desirability functions were combined to calculate the overall desirability using the weighted geometric mean as follows (Equation 6):

Overall desirability = ( d 1 × d 2 ) ^ ( 1 / 2 ) (6)

where d1 represents the desirability associated with maintaining the FoS at or above 1.2, and d2 corresponds to the desirability of minimizing the amount of removed overburden. Both responses were assigned equal weights due to their comparable importance in ensuring slope stability and minimizing excavation requirements.

The resulting desirability plots revealed a trade-off region in which achieving higher FoS values required increased overburden removal. Therefore, the optimal solution was identified as the parameter combination that satisfies the FoS constraint of 1.2 while maximizing the composite desirability.

Figure S10 illustrates the relationship between the FoS and the amount of removed overburden considering H, W, and β parameters. In this analysis, the minimum overburden removal was determined for a FoS value of 1.2. The optimal values of H, W, and β were obtained based on the composite desirability value, which represents the extent to which both responses are simultaneously optimized. The amount of overburden and parameter values obtained from the optimization results are presented in the Table X.

RESULTS AND DISCUSSION

After running the generated models and examining the results presented in Figures S5-6 and Tables IV-V, it is observed that there are no stability issues in the benches located on the right side of the open-pit sections. However, in the benhes located on the left side, it was identified that there may be stability issues in the lowest five benches. The safety factors (FoS) for these benches were computed and are listed in Table VII. A graphical representation of the FoS values calculated for these regions according to the models is shown in Figure S11.

As shown in Figure S10, the models for Pits 1, 3, 5, 7, 8, and 13 remain above the accepted safe zone threshold of a Factor of Safety (FoS) value of 1.2, as defined in the literature. These models, detailed in Table I regarding their pit design parameters, indicated no stability issues in terms of stress deformation for an open pit to be constructed based on them. Graphical representations of the vertical stress values occurring in the benches, detailed in Tables V and VI, are provided in Figure S12.

When examining the vertical stress values occurring on the benches in Figure S12 across 13 different pit models, it is observed that the maximum stress on the benches located on the left side is 0.5297 MPa, whereas, on the benches located on the right side, this maximum value is 0.3169 MPa. When considering the maximum stress values, it was calculated that there was a 67% increase in stresses occurring on the benches on the left side of the open-pit sections compared to those on the right side. The increase in benches located on the left side (measurement line 388 m) due to the coal seam dipping deeper into the ground, and consequently the pit deepening, along with the varying rock formations, is considered an expected result. From a practical engineering perspective, increasing the bench slope angle or bench height leads to a concentration of stresses closer to the bench face, as the rock mass has less space to redistribute the applied loads. Steeper or higher benches reduce confinement, which in turn increases shear stress along potential failure surfaces and lowers overall stability. In contrast, gentler slopes and lower bench heights allow stresses to dissipate more gradually within the rock mass, resulting in a more favorable stress distribution and improved safety margins. As also observed in the present study, the stress distribution developed within the benches cannot be attributed to bench height or bench slope angle as a single controlling factor; rather, it reflects a dynamic interaction between both parameters acting simultaneously.

In the literature, there are several studies that address slope and bench optimization problems in open-pit mining using numerical approaches. In this respect, both the present study and the work of Sdvyzhkova et al. (2024) make use of stress–strain analyses to evaluate slope stability conditions. However, the scope of the two studies differs in terms of scale and optimization focus. While Sdvyzhkova et al. (2024) concentrate on adjusting pit wall boundaries at the overall pit level to improve ore mining completeness, the present study focuses on bench-scale geometry by examining the combined effects of bench height and slope angle. Moreover, stripping ratio is directly included as an optimization criterion in the proposed approach, which represents a key difference from pit-level boundary optimization studies. Despite these differences, both studies demonstrate that finite element modeling provides a reliable basis for integrating geotechnical parameters into slope optimization problems.

Figure S13 shows the vertical displacement values in the benches for 13 different pit models. Accordingly, the maximum displacement in the benches on the left side was 0.0775 mm, whereas on the right side, it was 0.0383 mm. Considering the maximum vertical displacement values, it was calculated that there was a 101% increase in displacement in the benches on the left side of the open-pit sections compared to the benches on the right side. Given that Figure S14 shows higher vertical stresses in the benches on the left side of the open pits, this increase is expected. Overall, the vertical deformation values calculated according to the models do not threaten bench stability. The graphical representation given in Figure S14 shows that the average stress values obtained from the 13 different open-pit models vary between 0.1 and 0.2 MPa for the benches on both the right and left sides, while the average vertical displacement values range from 0.01 to 0.015 mm.

When the graphs in Figures S12, S13, and S14 are evaluated overall, it has been determined that there will be no stability issues in the benches located on the right side of the 13 different open-pit models with varying bench parameters, based on the stress, deformation, and FoS values. Additionally, considering that the benches on the left side of the pit profiles are constructed at higher elevations, the varying formation properties, and the design over a 388-meter-long line, it has been determined that some of these benches may have stability issues. The benches with identified stability issues have been found to be the last five benches designed at the bottom. In Experimental Modelling mathematical modeling focused on these five benches, where the factor of safety (FoS) was at critical levels. By analyzing the FoS and vertical stress distributions occurring in these areas, the optimal conditions for bench stability were determined. At this stage, it is crucial to analyze the impact of the increase in vertical stress and deformation on bench stability in the most effective way. To this end, the factor of safety (FoS) values for the benches located in the left side, where stress-deformation distribution is intensive, have been calculated. Detailed mathematical modeling has been used to support these calculations, and optimal bench dimensions have been proposed. In the mathematical modeling study, the variations in bench height, bench width, and bench slope angle parameters were examined separately in terms of FoS and overburden. The optimization results based on the developed mathematical model are presented in Table XI.

In the optimization, the primary goal was not only slope stability but also achieving the lowest overburden removal. In this scenario, selecting a bench height of 8 meters, a bench width of 8 meters, and a bench slope angle of 75 degrees results in no issues with slope stability while also providing the lowest overburden removal and consequently the lowest stripping ratio. For the optimized pit model, the stripping ratio is calculated as 20.6 m³/ton. The overburden amounts for the suitable pit models (Pit-1, Pit-3, Pit-7, Pit-8, and Pit-13) based on the factor of safety (FoS) using the finite element method are compared with the optimized pit model in Figure S15.

For the optimized pit model, pit design was performed using the Micromine program, and the overburden amount was calculated. The results are presented comparatively in Table XII.

Table XII
Comparison of the results obtained from the mathematical approach and the 3D model for the optimized pit.

The overburden amount obtained from the optimized 3D pit model is 42,799,509 m³, with a difference of 0.53% compared to the overburden amount obtained from the mathematical model. As shown, the overburden value presented in Table XI was predicted with an accuracy of 99.47%.

In summary, the optimization performed using the mathematical model allows for the design of an open-pit mine with the proposed bench geometry, which is both safe in terms of stability and enables production with the minimum excavation amount, as shown in Figure S15. In the optimization study, the factor of safety (FoS) value was found to be 1.23 for the parameters that result in the lowest overburden amount. To verify the accuracy of the model, the optimized pit model was analyzed using the finite element method, resulting in a factor of safety (FoS) value of 1.21. As observed, the proposed mathematical approach can estimate the FoS value with 98.3% accuracy. In conclusion, given the high variability in open-pit designs, the proposed approach model allows for time-saving by increasing sampling and enables the prediction of bench geometry that achieves both stability and the lowest overburden amount for the field.

CONCLUSIONS

Open-pit mining operations frequently encounter the challenge of ensuring slope stability while also optimizing the removal of overburden material. The design of bench geometry (slope angle, height, and width) is pivotal in managing these conflicting objectives. Additionally, bench design must address the necessity to minimize overburden amount, which can be accomplished by safely increasing the steepness of pit slope angles. The optimization of bench geometry for efficient slope stability and overburden removal in open pit mining is a complex and multifaceted challenge.

Considering this situation, slope stability analyses were conducted for different bench geometries in this study, and stripping ratios were calculated. The obtained data were evaluated using mathematical approaches to perform the optimization study. The optimized pit model is presented in comparison with other models. In the discussion and evaluation section, it is shown that the mathematical approach presented in the article can yield highly accurate results based on the obtained outcomes. In engineering projects, a balance must be achieved between slope stability and overburden removal. This balance will contribute to both the safety and overall efficiency of open-pit mining operations. The optimization approach proposed within the scope of this study can be applied to open-pit mines with similar geological and geomechanical conditions, enabling the evaluation of alternative bench geometries by jointly considering slope stability and overburden removal efficiency, and thus supporting safer and more effective pit design decisions.

SUPPLEMENTARY MATERIAL

Data availability

All data supporting the findings of this study are available within the article or from the corresponding author upon request.

References

  • AGOSTI A, STEFANO UTILI, VALDERRAMA C & ALBORNOZ G. 2021. Optimal pitwall profiles to maximise the overall slope angle of open pit mines: the McLaughlin Mine. Aust Cent Geomech, p. 69-82.
  • ALEJANO LR, PONS B, BASTANTE FG, ALONSO E & STOCKHAUSEN HW. 2007. Slope geometry design as a means for controlling rockfalls in quarries. Int J Rock Mech Min Sci 44: 903-921.
  • ALTUNTOV FK & ERKAYAOĞLU M. 2021. A New Approach to Optimize Ultimate Geometry of Open Pit Mines with Variable Overall Slope Angles. Nat Resour Res 30: 4047-4062.
  • BAI X, TURCZYNSKI G, BAXTER N, PLACE D, SINCLAIR-ROSS H & READY S. 2017. Pseudoflow Method for Pit Optimization, 8 p.
  • BORGES RP, BACELLAR L, GRASSO CB, GOMES G & GOMES R. 2023. Slope geometry optimization considering groundwater drawdown scenarios at an open-pit phosphate mine, southeastern Brazil. Environ Earth Sci 82: 1-26. https://doi.org/10.21203/rs.3.rs-1918051/v1.
    » https://doi.org/10.21203/rs.3.rs-1918051/v1
  • BOX GEP & BEHNKEN DW. 1960. Some New Three Level Designs for the Study of Quantitative Variables. Technometrics 2: 455-475.
  • CIM. 2019. CIM Estimation of Mineral Resources & Mineral Reserves Best Practice Guidelines Prepared by the CIM Mineral Resource & Mineral Reserve Committee Canadian Institute of Mining, Metallurgy and Petroleum, 75 p.
  • DASSAULT SYSTEMES. 2021. GEOVIA Surpac | Geology & Mine Planning - Dassault Systèmes®. www.3ds.com
    » www.3ds.com
  • DESTANOGLU N, TASKIN FB, TASTEPE M & OGRETMEN S. 2000. Omerler mechanized longwall application. In: Turkish Coal Administration, in Turkish, Ankara.
  • ELAHI E, KAKAIE R & YUSEFI A. 2012. A new algorithm for optimum open pit design: Floating cone method III. J Min Environ 2: 118-125.
  • FERRARI F, THOENI K, GIACOMINI A & LAMBERT C. 2016. A rapid approach to estimate the rockfall energies and distances at the base of rock cliffs. Georisk Assess Manag Risk Eng Syst Geohazards 10: 179-199.
  • GIACOMINI A, THOENI K, LAMBERT C, BOOTH S & SLOAN SW. 2012. Experimental study on rockfall drapery systems for open pit highwalls. Int J Rock Mech Min Sci 56: 171-181.
  • GIBSON W, DE BRUYN IA & WALKER DJH. 2006. Considerations in the optimisation of bench face angle and berm width geometries for open pit mines. In: The South African Institute of Mining and Metallurgy, Johannesburg, p. 557-578.
  • GUO W, LIU G, LI J, CHAI S & GUO S. 2024. Research on the method of determining the block size for an open-pit mine integrating mining parameters and shovel-truck’s operation efficiency. Sci Rep 14: 10119.
  • HARTMAN HL & MUTMANSKY JM. 2002. Introductory mining engineering. 2nd ed., John Wiley & Sons. ISBN: 978-0-471-34851-1.
  • HUSTRULID WA, KUCHTA M & MARTIN RK. 2013. Open pit mine planning and design. 3rd ed., 2 Vols., Crc Press, https://doi.org/10.1201/b15068
    » https://doi.org/10.1201/b15068
  • JOHNSON TB & SHARP WR. 1971. A Three-dimensional Dynamic Programming Method for Optimal Ultimate Open Pit Design, USBM, 25 p.
  • KOENIGSBERG E. 1982. The optimum contours of an open pit mine: an application of dynamic programming. In: Society for Mining, Metallurgy & Exploration, p. 274-287.
  • KOSE H, TATAR C, KONAK G, ONARGAN T & KIZIL MS. 1994. T.K.İ. Garp Linyitleri İşletmesi Müessese Müdürlüğü Ömerler Yeraltı İşletmesi Tabaka Kontrolü, Yük ve Konverjans Ölçümleri (Proje Raporu). Dokuz Eylül Üniversitesi, Mühendislik Fakültesi, Maden Mühendisliği Bölümü, İzmir, Türkiye.
  • LERCHS H. 1965. Optimum Design of Open-Pit Mines. CIM Bull 68: 17-24.
  • MALLI T & YETKIN ME. 2019. An optimization approach for panel dimension design in underground coal mines. Kuwait J Sci 46: 90-98.
  • MAPTEK. 2021. 3D Mine Planning, Mine Design, Geology & Scheduling in Vulcan. www.maptek.com
    » www.maptek.com
  • MICROMINE. 2017. Micromine setting the standard in Pit Optimisation (2017), https://www.micromine.com/micromine-setting-standard-pit-optimisation/2017
    » https://www.micromine.com/micromine-setting-standard-pit-optimisation/2017
  • MINITAB. 2017. Statistical Software, Version 17. Minitab Incorporation, State College, PA.
  • MYERS RH, MONTGOMERY DC & ANDERSON-COOK CM. 2016. Response Surface Methodology: Process and Product Optimization Using Designed Experiments, 4th ed., John Wiley & Sons. ISBN: 978-1-118-91601-8.
  • OPRICOVIC S & TZENG G-H. 2002. Multicriteria Planning of Post-Earthquake Sustainable Reconstruction. Comput-Aided Civ Infrastruct Eng 17: 211-220.
  • OPRICOVIC S & TZENG G-H. 2004. Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS. Eur J Oper Res 156: 445-455.
  • OPRICOVIC S & TZENG G-H. 2007. Extended VIKOR method in comparison with outranking methods. Eur J Oper Res 178: 514-529.
  • ÖZBURAN M. 2023. Batı Anadolu’daki Bazı Kömürlü Miyosen Yaşlı Sahaların (Seyitömer – Tunçbilek – Değirmisaz – Çamalan / Kütahya) Jeolojik ve Tektonik Korelasyonu. Afyon Kocatepe Univ J Sci Eng 23: 216-227.
  • OZFIRAT MK. 2007. Investigations on Determining and Decreasing the Coal Loss At Fully-Mechanized Production in Omerler Underground Coal Mine. PhD Thesis, PhD Thesis, Institute of Natural and Applied Sciences, Dokuz Eylul University.
  • PIERSON LAC, FRED GULLIXSON & CHASSIE RG. 2001. Rockfall Catchment Area Design Guide: Final Report (REPORT NO. FHWA-OR-RD-02-04; SPR-3(032)). Oregon Department of Transportation, Research Group, in Cooperation with the Federal Highway Administration.
  • RITCHIE A. 1963. An Evaluation of Rockfall and its Control. Highway Research Record, No. 17, Highway Research Board, National Research Council, p. 13-28.
  • ROCDATA. 2014. Rock, Soil and Discontinuity Strength Analysis. 5.0.
  • ROCSCIENCE. 2015. Phase2 version 8 (RS 2) user’s guide.
  • ROCSCIENCE. 2021. Slide2 | Most Comprehensive 2D Slope Stability Software - Rocscience. www.rocscience.com
    » www.rocscience.com
  • SAIK P, RYSBEKOV K, KASSYMKANOVA K-K, LOZYNSKYI V, KYRGIZBAYEVA G, MOLDABAYEV S, BABETS D & SALKYNOV A. 2024. Investigation of the rock mass state in the near-wall part of the quarry and its stability management. Front Earth Sci 12: 1395418.
  • SDVYZHKOVA O, MOLDABAYEV S, BABETS D, BASCETIN A, ASYLKHANOVA G, NURMANOVA A & PRYKHODKO V. 2024. Numerical modelling of the pit wall stability while optimizing its boundaries to ensure the ore mining completeness. Min Miner Depos 18: 1-10.
  • SHEOREY PR. 1994. A theory for In Situ stresses in isotropic and transverseley isotropic rock. Int J Rock Mech Min Sci 3: 23-34.
  • SOLTANMOHAMMADI H, OSANLOO M, SAMI A & MALEKZADEH SB. 2010. Selection of practical bench height in open pit mining using a multi-criteria decision making solution. J Geol Min Res 2: 48-59.
  • STACEY TR, XIANBIN Y, ARMSTRONG R & KEYTER GJ. 2003. New slope stability considerations for deep open pit mines. J South Afr Inst Min Metall South Afr Inst Min Metall 103: 373-389.
  • STUART NJ. 1992. Pit optimisation using solid modelling and the Lerchs Grossman algorithm. Int J Surf Min Reclam Environ 6: 19-29.
  • WILKE FL & WRIGHT EA. 1984. Determining the optimal ultimate pit design for hard rock open pit mines using dynamic programming. Erzmetall 37: 139-144.
  • YASITLI NE & UNVER B. 2005. 3D numerical modeling of longwall mining with top-coal caving. Int J Rock Mech Min Sci 42(2): 219-235.
  • YE G, HUO Y, LI C, DENG C, YU Y, HUANG G & MA L. 2018. A comparative study of trough profile and operating parameters performance in spiral concentrator. Int J Coal Prep Util 41: 678-691.
  • ZERRADI Y, SOUISSI M & LARABI A. 2023. Application of the deterministic block theory to the slope stability design of an open-pit mine in Morocco. Min Miner Depos 17: 53-60.
  • ZHANG S & STARFIELD AM. 1985. Dynamic programming with colour graphics smoothing for open-pit design on a personal computer. Int J Min Eng 3: 27-34.
  • ZHAO Y & KIM YC. 1992. A New Optimum Pit Limit Design Algorithm. In: SPE of AIME, p. 423-434.

Correspondence

Correspondence to: Mustafa Emre Yetkin mustafa.yetkin@deu.edu.tr

Handling editor

Andrea Balbo

Publication Dates

  • Publication in this collection
    07 Sept 2026
  • Date of issue
    2026

History

  • Received
    22 Oct 2025
  • Accepted
    21 Feb 2026
location_on
Academia Brasileira de Ciências Rua Anfilófio de Carvalho, 29, 3º andar, 20030-060 Rio de Janeiro RJ Brasil, Tel: +55 (21) 2391-7901 - Rio de Janeiro - RJ - Brazil
E-mail: aabc@abc.org.br
rss_feed Acompanhe os números deste periódico no seu leitor de RSS
Ir para o topo