37 |
Kocaoglu et al. (1991)Kocaoglu, D. F., Deckro, R. F., Olson, M., Iyigun, G., Klein, J., & Zhou, S. (1991). Framework for continuous improvement in new product development. Proceedings of Portland International Conference on Management and Engineering and Technology (pp. 294). Portland: IEEE., Bessant et al. (1994)Bessant, J., Caffyn, S., Gilbert, J., Harding, R., & Webb, S. (1994). Rediscovering continuous improvement. Technovation, 14(1), 17-29. http://dx.doi.org/10.1016/0166-4972(94)90067-1. http://dx.doi.org/10.1016/0166-4972(94)9...
, Caffyn (1997)Caffyn, S. (1997). Extending continuous improvement to the new product development process. R & D Management, 27(3), 253-267. http://dx.doi.org/10.1111/1467-9310.00061. http://dx.doi.org/10.1111/1467-9310.0006...
, Regan & Kleiner (1997)Regan, P., & Kleiner, B. H. (1997). New developments in improving quality management in research and development. Aircraft Engineering and Aerospace Technology, 69(1), 26-30. http://dx.doi.org/10.1108/00022669710161621. http://dx.doi.org/10.1108/00022669710161...
, Bessant & Francis (1999)Bessant, J., & Francis, D. (1999). Developing Strategic Continuous Improvement Capability. International Journal of Operations & Production Management, 19(11), 1106-1119. http://dx.doi.org/10.1108/01443579910291032. http://dx.doi.org/10.1108/01443579910291...
, Lager (2000)Lager, T. (2000). A new conceptual model for the development of process technology in process industry. International Journal of Innovation Management, 4(3), 319-346., Berg et al. (2001)Berg, P., Pihlajamaa, J., Leinonen, M., & Leivo, V. (2001). Assessment of quality and maturity level of R&D. In Proceedings of 1st PICMET (pp. 168-182). Portland: PICMET., Brennan (2001)Brennan, L. (2001). Total quality management in a research and development environment. Integrated Manufacturing Systems, 12(2), 94-102. http://dx.doi.org/10.1108/09576060110384316. http://dx.doi.org/10.1108/09576060110384...
, Cole (2001)Cole, R. E. (2001). From continuous improvement to continuous innovation. Quality Management Journal, 8(4), 7-21., Sohal et al. (2003)Sohal, A. S., Terziovski, M., & Zutshi, A. (2003). Team-based strategy at Varian Australia: a case study. Technovation, 23(4), 349-357. http://dx.doi.org/10.1016/S0166-4972(01)00114-6. http://dx.doi.org/10.1016/S0166-4972(01)...
, Haque & James-Moore (2004)Haque, B., & James-Moore, M. (2004). Applying lean thinking to new product introduction. Journal of Engineering Design, 15(1), 1-31. http://dx.doi.org/10.1080/0954482031000150125. http://dx.doi.org/10.1080/09544820310001...
, Nilsson-Witell et al. (2005)Nilsson-Witell, L., Antoni, M., & Dahlgaard, J. J. (2005). Continuous improvement in product development: Improvement programs and quality principles. International Journal of Quality & Reliability Management, 22(8), 754-776. http://dx.doi.org/10.1108/02656710510617210. http://dx.doi.org/10.1108/02656710510617...
, Middel et al. (2007)Middel, R., Weegh, S., & Gieskes, J. (2007). Continuous improvement in The Netherlands: a survey-based study into current practices. International Journal of Technology Management, 37(3-4), 259-271. http://dx.doi.org/10.1504/IJTM.2007.012262. http://dx.doi.org/10.1504/IJTM.2007.0122...
, Cooper (2008)Cooper, R. (2008). Perspective: the stage-gates idea-to-launch process-update, what’s new, and NexGen systems. Journal of Product Innovation Management, 25(3), 213-232. http://dx.doi.org/10.1111/j.1540-5885.2008.00296.x. http://dx.doi.org/10.1111/j.1540-5885.20...
, Cooper & Edgett (2008)Cooper, R. G., & Edgett, S. J. (2008). Maximizing productivity in product innovation. Research-Technology Management, 51(2), 47-58., Prajogo & Hong (2008)Prajogo, D. I., & Hong, S. W. (2008). The effect of TQM on performance in R&D environments: a perspective from South Korean firms. Technovation, 28(12), 855-863. http://dx.doi.org/10.1016/j.technovation.2008.06.001. http://dx.doi.org/10.1016/j.technovation...
, Cooper (2009)Cooper, R. (2009). How companies are reinventing their Idea-to-launch methodologies. Technology Management, 52(2), 47-57., Sun et al. (2009)Sun, H., Zhao, Y., & Yau, H. K. (2009). The relationship between quality management and the speed of new product development. The TQM Journal, 21(6), 576-588. http://dx.doi.org/10.1108/17542730910995855. http://dx.doi.org/10.1108/17542730910995...
, Yan & Makinde (2009)Yan, B., & Makinde, O. D. (2009). Modelling the Long term impact of existing products on perceived value of new products. In Proceedings of the 2009 IEEE IEEM - Industrial Engineering and Engineering Management (pp. 1136-1140). Hong Kong: IEEE., Salgado et al. (2009)Salgado, E. G., Mello, C. H. P., Silva, C. E. S., Oliveira, E. S., & Almeida, D. A. (2009). Análise da aplicação do mapeamento do fluxo de valor na identificação de desperdícios do processo de desenvolvimento de produtos. Gestão & Produção, 16(3), 344-356. http://dx.doi.org/10.1590/S0104-530X2009000300003. http://dx.doi.org/10.1590/S0104-530X2009...
, Fàbregas-Fernández et al. (2010)Fàbregas-Fernàndez, A., García-Montoya, F., Pérez-Lozano, P., Suñé-Negre, J. M., & Ticó, J. R. (2010). Quality assurance in research: incorporating ISSO 9001:2000 into a GMP quality management system in a pharmaceutical R+D+I Center. Accreditation and Quality Assurance, 15, 297-304., Sandoval-Arzaga & Suárez-Barraza (2010)Sandoval-Arzaga, F., & Suárez-Barraza, M. F. (2010). Experts within kaizen teams: how to get the most from their knowledge. Development and Learning Organizations, 24(4), 10-13. http://dx.doi.org/10.1108/14777281011056703. http://dx.doi.org/10.1108/14777281011056...
, Sun & Zhao (2010)Sun, H., & Zhao, Y. (2010). The empirical relationship between quality management and the speed of new product development. Total Quality Management, 21(4), 351-361. http://dx.doi.org/10.1080/14783361003606480. http://dx.doi.org/10.1080/14783361003606...
, Furuhjelm et al. (2011)Furuhjelm, J., Swan, H., & Tingström, J. (2011). Creating value through lean product development: applying lean principles. In Proceedings of the 18th International Conference on Engineering Design (ICED 11) (8 pp.) Copenhagen: The Design Society., Rossi et al. (2011)Rossi, M., Kerga, E. T., Taisch, M., & Terzi, S. (2011). Proposal of a method to systematically identify wastes in New Product Development Process. In Proceedings of the 2011 17th International Conference on Concurrent Enterprising (ICE 2011) (pp. 1-9). Aachen: IEEE., Ringen & Holtskog (2011)Ringen, G., & Holtskog, H. (2011). How enablers for lean product development motivate engineers. International Journal of Computer Integrated Manufacturing, 26(12), 1-11., Kowang & Rasli (2011)Kowang, T. O., & Rasli, A. (2011). New product development in multi-location R&D organization: a concurrent engineering approach. African Journal of Business Management, 5(6), 2264-2275., Lodgaard & Aasland (2011)Lodgaard, E., & Aasland, K. E. (2011). An examination of the application of plan-do-check-act cycle in product development. Proceedings of the 18th international conference on engineering design (ICED11) (9 pp.). Kobenhavn: The Design Society., Schulze et al. (2013)Schulze, A., Schmitt, P., Heinzen, M., Mayrl, P., Heller, D., & Boutellier, R. (2013). Exploring the 4I framework of organisational learning in product development: value stream mapping as a facilitator. International Journal of Computer Integrated Manufacturing, 26(12), 1136-1150. http://dx.doi.org/10.1080/0951192X.2011.608724. http://dx.doi.org/10.1080/0951192X.2011....
, Yan & Makinde (2009)Yan, B., & Makinde, O. D. (2009). Modelling the Long term impact of existing products on perceived value of new products. In Proceedings of the 2009 IEEE IEEM - Industrial Engineering and Engineering Management (pp. 1136-1140). Hong Kong: IEEE., Chaudhuri (2013)Chaudhuri, A. (2013). Simultaneous improvement in development time, cost and quality: a practical framework for generic pharmaceuticals industry. R & D Management, 43(3), 227-241. http://dx.doi.org/10.1111/j.1467-9310.2012.00675.x. http://dx.doi.org/10.1111/j.1467-9310.20...
, Garcia-Sabater et al. (2012)Garcia-Sabater, J. J., Marin-Garcia, J. A., & Perello-Marin, M. R. (2012). Is implementation of continuous improvement possible? An evolutionary model of enablers and inhibitors. Human Factors and Ergonomics in Manufacturing & Service Industries, 0(0), 1-14., Rossi et al. (2012)Rossi, M., Taisch, M., & Terzi, S. (2012). Lean Product Development: a five-steps methodology for continuous improvement. In Proceedings of the 2012 18th International Conference on Engineering, Technology and Innovation (pp. 1-10). Munich: IEEE., Sopelana et al. (2012)Sopelana, A., Flores, M., Martinez, L., Flores, K., & Sorli, M. (2012). The application of an assessment tool for lean product development: an exploratory study in Spanish Companies. In Proceedings of the 2012 18th International Conference on Engineering, Technology and Innovation (pp. 1-10). Munich: IEEE., Khan et al. (2013)Khan, M., Al-Ashaab, A., Shehab, E., Haque, B., Ewers, P., Sorli, M., & Sopelana, A. (2013). Towards lean product and process development. International Journal of Computer Integrated Manufacturing, 26(12), 1105-1116. http://dx.doi.org/10.1080/0951192X.2011.608723. http://dx.doi.org/10.1080/0951192X.2011....
, Song & Su (2015)Song, Y., & Su, Q. (2015). The relationship between quality management and new product development: evidence from China. Oper Manag Res, 8(1-2), 1-14. http://dx.doi.org/10.1007/s12063-014-0096-7. http://dx.doi.org/10.1007/s12063-014-009...
, Tyagi et al. (2015)Tyagi, S., Choudhary, A., Cai, X., & Yang, K. (2015). Value stream mapping to reduce the lead-time of a product development process. International Journal of Production Economics, 160, 202-212. http://dx.doi.org/10.1016/j.ijpe.2014.11.002. http://dx.doi.org/10.1016/j.ijpe.2014.11...
, Tuli & Shankar (2015)Tuli, P., & Shankar, R. (2015). Collaborative and lean new product development approach: a case study in the automotive product design. International Journal of Production Research, 53(8), 2457-2471. http://dx.doi.org/10.1080/00207543.2014.974849. http://dx.doi.org/10.1080/00207543.2014....
|