ABSTRACT

Simplified methods are useful alternatives for prior analysis of the effects of dam rupture and can guide the decision-making process for carrying out more complete studies. In this context, a new simplified approach is presented, which enables the analysis of aspects from dam rupture of earthen dams that failed due to overtopping, considering dam height and reservoir volume as input data. Hypothetical cases were analyzed applying dam-break hydrodynamic simulations, which results allowed the development of equations capable of estimating peak flow attenuation and peak discharge arrival time along the downstream valley. The proposed approach was applied in a hypothetical case study (15 m high dam and 17 hm3 reservoir volume), obtaining results close to those achieved through other methods, especially in case of estimating the maximum discharges throughout the downstream valley, where the average differences between the results of the methods were of the order of 15%.

Keywords:
Dam-break; Simplified methods; Flood wave; Flood routing

RESUMO

Métodos simplificados são alternativas úteis para análise prévia dos efeitos da ruptura de barragens, podendo orientar a tomada de decisão da realização de estudos mais completos. Nesse contexto, propõe-se uma nova abordagem simplificada para análise de aspectos da ruptura de barragens de terra, cuja falha ocorre por galgamento, a partir da altura da barragem e do volume do reservatório como dados de entrada. Casos hipotéticos de ruptura foram analisados por meio de simulações hidrodinâmicas, cujos resultados permitiram desenvolver equações capazes de estimar o amortecimento da vazão de pico e o tempo de chegada da vazão máxima no vale a jusante. A abordagem proposta foi aplicada em estudo de caso hipotético (em uma barragem com 15 m de altura e 17 hm3 de volume no reservatório), obtendo-se resultados próximos dos alcançados por meio de outros metodos, especialmente na estimativa da vazão máxima no vale a jusante, onde as diferenças médias entre os resultados dos métodos considerados foram da ordem de 15%.

Palavras-chave:
Ruptura de barragens; Métodos simplificados; Onda de cheia; Propagação de vazões

INTRODUCTION

Although dams have been used for millennia, only in the XX century significant technological advances enabled the construction of safe developments. Despite this evolution and studies performed to ensure dam safety during design, construction and operation, risk of failure cannot ever be made null. Proving that fact, dam failures eventually occurred with severe consequences such as St. Francis, Malpasset and Vajont (Jansen, 1983Jansen, R. B. (1983). Dams and Public Safety. Denver, CO: US Departament of Interior, Bureau of Reclamation.). One of the most documented dam failures in history, the Teton Dam failure, in 1976, can be considered the trigger for the first issuance of regulations imposing dam failure analysis and forecasting of downstream flood waves, inundation maps and potential hazards (Wahl, 2010Wahl, T. L. (2010 June-July). Dam breach modeling - An overview of analysis methods. In 2nd Joint Federal Interagency Conference, Las Vegas.). Due to past events, nowadays it is perceived that every dam represents a source of potential hazard to the downstream valley. Flood waves from dam failures possess high destructive potential, which can cause massive economic losses, fatalities, social and environmental damages when reaching population and structures along its path, as seen in the last two major tailing dams accidents in Brazil: Fundão (Mariana, MG), in 2015, and Barragem I (Brumadinho, MG) in 2019. These are good examples of accidents with enormous proportions and big coverage by the media. However, there are countless other dams with smaller dimensions collapsing every year, which must also be taken into account. Just in the current year, in Brazil, one can mention dam failures in Currais (Meio Norte, 2020Meio Norte. (2020, Mar 25). Parte de barragem se rompe deixando feridos e carros soterrados no PI. Meio Norte. Retrieved in 2020, June 11, from https://www.meionorte.com/noticias/parte-de-barragem-se-rompe-deixando-feridos-e-carros-soterrados-no-pi-384935
https://www.meionorte.com/noticias/parte...
), in Sairé (G1 Caruaru, 2020G1 Caruaru (2020, Junho 15). Barragem se rompe em Sairé e água invade casas em Barra de Guabiraba. G1. Accessed in 2020, August 5, from https://g1.globo.com/pe/caruaru-regiao/noticia/2020/06/15/barragem-rompe-em-saire-e-agua-invade-casas-em-barra-de-guabiraba.ghtml
https://g1.globo.com/pe/caruaru-regiao/n...
) and in Perdizes (Elisa & Campos, 2020Elisa, T., & Campos, C. (2020, Maio 31). Barragem se rompe na zona rural de Perdizes. G1. Retrieved in 2020, June 11, from https://g1.globo.com/mg/triangulo-mineiro/noticia/2020/05/31/rompimento-de-acude-e-registrado-na-zona-rural-de-perdizes-neste-domingo.ghtml
https://g1.globo.com/mg/triangulo-mineir...
). Other examples around the world can also be found, such as the accidents of Edenville Dam (Ellison, 2020Ellison, G. (2020). Edenville Dam failure investigation to take ‘many months’. MLive. Accessed in August 5th, 2020, from https://www.mlive.com/news/2020/06/edenville-dam-failure-investigation-to-take-many-months.html
https://www.mlive.com/news/2020/06/edenv...
), Stanford Dam (Matheny, 2020Matheny, K. (2020, May 22). Sanford Dam also failed, state confirms; GOP calls for AG Dana Nessel’s recusal. Detroit Free Press. Retrieved in 2020, August 5, from https://www.freep.com/story/news/local/michigan/2020/05/22/sanford-dam-michigan-flooding/5245255002/
https://www.freep.com/story/news/local/m...
), Bear Lake Dam (Ferretti, 2020Ferretti, C. (2020, August 9). Minor damage expected from partial breach of Hillsdale County dam. The Detroit News. Accessed in 2020, August 5, from https://www.detroitnews.com/story/news/local/michigan/2020/08/09/minor-damage-expected-partial-breach-hillsdale-county-dam/3331548001/
https://www.detroitnews.com/story/news/l...
) and a dam in Blue Nile state of Sudan (Arab News, 2020Arab News. (2020, August 02). ‘Hundreds’ of homes destroyed after Sudan dam collapse. Arab News. Retrieved in 2020, August 5, from https://www.arabnews.com/node/1713711/middle-east
https://www.arabnews.com/node/1713711/mi...
).

Dam safety regulations were issued in Brazil in 2010, with Law 12.334/2010, which instituted the National Dam Safety Policy (PNSB). This legislation represents a paradigm shift in Brazilian dam safety environment. Previously, several safety aspects were evaluated solely based on experience, while now they are confirmed and institutionalized by law (Ferla, 2018Ferla, R. (2018). Análise de aspectos hidráulicos de métodos simplificados envolvendo rompimento de barragens. Porto Alegre: UFRGS.). One of the biggest changes imposed by the dam safety law is the mandatory preparation of a Dam Safety Plan. Among its various requirements, it imposes the elaboration of Emergency Action Plans (EAP) for dams classified as high risk (classification includes structural and operational aspects, dam technical characteristics, conservation condition and fulfillment of the Dam Safety Plan). EAPs are complex documents which, despite the technical background, should be written so that any layman reader can understand them (Sampaio, 2016Sampaio, J. A. L. (2016). As deficiências do Plano de Ação Emergencial das Barragens no Brasil. Revista de Engenharia Civil IMED, 12(2), 7-17.). Considering all required EAPs’ contents, the identification of the effects along the downstream valley arising from a possible structure failure stands out. In this context, dam-break studies become extremely important, as they allow the estimation of specific parameters closely linked to the potential damages caused by the dam rupture generated flood wave, such as maximum reached water levels and flow velocities along the downstream valley.

Dam-break studies backing EAPs should be carried out based on coherent input data, so that results are as close as possible to most likely occurring scenarios. However, data such as topobathymetry is very often unavailable and obtaining such data may be too expensive or time-consuming. Also, reliability issues might be raised, normally deriving from the many uncertainties involved, such as: type of rupture, downstream valley conditions during the rupture, effects of the rupture on topography, geology and hydraulic conditions. These dilemmas represent a major challenge for dam owners and inspection agents for complying with deadlines established in the legislation, given the large number of involved existing dams, for which, generally, there is no data for these analyzes. Due to recent regulations in Brazil, challenges in balancing the needed time and costs to acquire the necessary data to perform mandatory dam-break studies are similar to those already felt in the past in other countries with older similar regulations. According to Grimaldi & Poggi (2010)Grimaldi, S., & Poggi, D. (2010). A synthetic method for assessing the risk of dam flooding. 78th International Commission on Large Dams Annual Meeting. Hanoi, Vietnã: ICOLD., in Italy there is a significant number of dams considered small and medium whose detailed rupture analysis would involve high costs and considerable time. Thus, regional authorities are evaluating the possibility of adopting simpler methods requiring less data and time to complete, seeking to reach acceptable results, sufficiently close to those obtained with more sophisticated methods, namely computational hydrodynamic dam-break simulations.

In addition to the aforementioned challenges, the last two major accidents in Brazil over an interval of four years, where the loss of human life and environmental damage were very significant, indicate the country’s need to move forward in dam safety matters. On that note, it is necessary that, at least, pre-planning emergency actions for dam rupture can be produced in quicker and more efficient way. In this context, simplified methods emerge as interesting options, considering their expeditious applicability, small amount of input data and credible results. These methodologies can, therefore, be used for dam rupture effects preliminary assessment, determining the potentially affected areas and reducing the number of complete studies to only the most critical cases. Also, simplified methods can be used as a tool to determine areas where topographic data should be surveyed thoroughly, enabling a reduction of costs in complete studies.

There are several simplified methods developed over the years that allow the inundation zones assessment (e.g. Cunge, 1969Cunge, J. A. (1969). On the subject of a flood propagation computation method (Muskingum method). J. Hydrol. Res., 7(2), 205-230. http://dx.doi.org/10.1080/00221686909500264.
http://dx.doi.org/10.1080/00221686909500...
; Wetmore & Fread, 1981Wetmore, J., & Fread, D. L. (1981). The NWS Simplified “Dam-Break” Flood Forecasting Model (24 p.). Silver Spring, Maryland: National Weather Service, Office of Hydrology.; Melo, 2015Melo, J. F. (2015). Simplified “Dam-Break” flood modeling. In 2nd International Dam World Conference (pp. 47-56). Lisboa, Portugal: LNEC.). Nevertheless, there is still no consensus on the use of these simplified approaches, despite the general acceptance that simplified approaches should not be used for the EAP elaboration of high risk dams. Even so, in recent years, some authors have been analyzing the effectiveness of these types of simplified methods by comparing the results with those obtained using hydrodynamic numerical simulations (e.g. Melo, 2015Melo, J. F. (2015). Simplified “Dam-Break” flood modeling. In 2nd International Dam World Conference (pp. 47-56). Lisboa, Portugal: LNEC.; Teixeira et al., 2016Teixeira, E. D., Smiderle, C. S. D., Goldenfum, J. A., & Ferla, R. (2016). Avaliação de métodos de propagação de hidrograma proveniente de ruptura hipotética de barragens: Estudo de caso em um trecho de rio. In 21st Seminário Nacional de Grandes Barragens (SNGB).; Ferla et al., 2017Ferla, R., Priebe, P. S., Novakoski, C. K., Hampe, R. F., Saliba, A. P. M., Teixeira, E. D., & Marques, M. G. (2017). Utilização de diferentes equações empíricas na previsão de características de inundação proveniente do rompimento de barragens. Simpósio de Hidráulica e Recursos Hídricos dos Países de Língua Portuguesa (SILUSBA), Porto, Portugal: APRH.; among others). In general, these studies compare water level results and associated inundation zones determined by means of simplified methods against those produced with the use of HEC-RAS or similar software. However, the number of published studies comparing the results from simplified and numerical methods is not very significant. So it is not yet possible to make definitive statements about the effectiveness of simplified methods (Ferla, 2018Ferla, R. (2018). Análise de aspectos hidráulicos de métodos simplificados envolvendo rompimento de barragens. Porto Alegre: UFRGS.).

According to Agência Nacional de Águas (2017)Agência Nacional de Águas – ANA. (2017). Relatório de Segurança de Barragens. Brasília, DF: ANA., there are 24,092 dams registered by inspection agencies in Brazil. Among them, 4,510 dams have enough information to state that they fall under the PNSB. For these dams, PNSB’s instruments will be applied, especially those referring to the existence of Dam Safety Plan and its components (inspections, periodic review and EAP). Due to the terms established by PNSB, most registered dams need to present an Emergency Action Plan. In addition, Brazil has numerous other dams of smaller sizes, involving lower potential hazard than larger dams, which must be analyzed to assess whether or not they must have EAPs in case of failure.

Bearing in mind the number of dams in Brazil that will require the drafting of EAPs and dam-break studies (dams covered by Law 12.334), simple and expeditious methodologies that allow preliminary assessment of the effects of a possible rupture, or even delineate smaller study areas, could be important tools for the evolution of the dam safety scenario in the country. Furthermore, simplified methodologies’ importance can be highlighted due to the numerous small dams in the country (not covered by the law), but still having considerable associated potential hazard and which, according to Agência Nacional de Águas (2016a)Agência Nacional de Águas – ANA. (2016a). Manual do Empreendedor sobre Segurança de Barragens Volume IV: Guia de Orientação e Formulários do Plano de Ação de Emergência - PAE. Brasília, DF: ANA., can be evaluated by simplified methodologies, depending on inspection authorities.

Several studies were carried out to verify the efficiency of simplified methods, being consensual the adequacy of its use for preliminary estimation of inundation zones due to dam ruptures. However, conclusions derive mostly from analyses of large dams, raising questions on their applicability to small and medium sized dams, which are highly representative in Brazil.

Therefore, the development of research enabling existing methods validation, or even establishment of simpler and faster methods, is highly convenient for the advance of the dam safety framework. Thus, the present paper aims at creating a new approach for analyzing dam-break cases using limited dataset. The new approach’s main target is to expeditiously assess peak flow attenuation and peak discharge arrival time along the downstream valley, having smaller dams as its main focus, for which simplified methods can be applied (Agência Nacional de Águas, 2016aAgência Nacional de Águas – ANA. (2016a). Manual do Empreendedor sobre Segurança de Barragens Volume IV: Guia de Orientação e Formulários do Plano de Ação de Emergência - PAE. Brasília, DF: ANA.).

DAM-BREAK STUDIES

Dam-break studies are important in determining the risks of fatalities in addition to economic, social and environmental damages. A complete dam-break study, according to Agência Nacional de Águas (2016a)Agência Nacional de Águas – ANA. (2016a). Manual do Empreendedor sobre Segurança de Barragens Volume IV: Guia de Orientação e Formulários do Plano de Ação de Emergência - PAE. Brasília, DF: ANA., should simulate several rupture scenarios, providing the following information: downstream valley characterization; flood inundation map; Self-Rescue Zones characterization (ZAS); and escape routes.

Information to carry out this type of study varies according to each corresponding area specificities. However, for most studies, in addition to dam characterization itself, information regarding reservoir volume, probable dam breach formation, downstream valley topography, downstream valley affected population and terrain roughness is also necessary.

Currently, due to modern computer processing capabilities, dam-break hydraulic and hydrodynamic software that have been developed, tested and improved over the years can easily be accessed, such as HEC-RAS (U.S. Army Corps of Engineers, 1995U.S. Army Corps of Engineers – USACE. (1995). HEC-RAS, River Analysis System. Hydraulic Reference Manual. Version 1. Davis, CA: Engineering Center.), DAMBRK (Fread, 1991Fread, D. L. (1991). The NWS DAMBRK model: Theoretical background/User documentation (123 p.). Silver Spring, MD: Hydrologic Research Laboratory, Office of Hydrology, National Weather Service, NOAA.), FLDWAV (Fread & Lewis, 1998Fread, D. L., & Lewis, J. M. (1998). NWS FLDWAV Model: Theoretical description and user documentation (335 p.). Silver Spring, MD: Hydrologic Research Laboratory, Office of Hydrology, National Weather Service, NOAA.) and LISFLOOD (Bates & De Roo, 2000Bates, P. D., & De Roo, A. P. J. (2000). A simple raster-based model for floodplain inundation. Journal of Hydrology (Amsterdam), 236(1-2), 54-77. http://dx.doi.org/10.1016/S0022-1694(00)00278-X.
http://dx.doi.org/10.1016/S0022-1694(00)...
). In general, most of these software require the following input data: downstream valley Manning coefficient; breach configuration; reservoir volume; downstream valley topography and; set of equations and simplifications considered for flood wave propagation (Tschiedel & Paiva, 2018Tschiedel, A. D. F., & Paiva, R. C. D. D. (2018). Uncertainty assessment in hydrodynamic modeling of floods generated by dam break. Revista Brasileira de Recursos Hídricos, 23, 1-17. http://dx.doi.org/10.1590/2318-0331.231820170074.
http://dx.doi.org/10.1590/2318-0331.2318...
).

Amongst the multiple software approaches available for dam-break effects assessment, Wahl (2010)Wahl, T. L. (2010 June-July). Dam breach modeling - An overview of analysis methods. In 2nd Joint Federal Interagency Conference, Las Vegas. points out three main modeling strategies developed since 1970, namely: (I) directly predict the breach outflow hydrograph and then use one of the available models to route the flood wave downstream; (II) parameterize the breach so that its evolution over time can be easily represented, allowing the breach outflow hydrograph to be determined by combining the breach formation with a spillway equation or other appropriate model; (III) use a combined model that simulates erosive processes associated with hydraulic processes to determine the breach and the outflow hydrograph flowing through it.

The most popular and used approach consists in the prediction of breach evolution, while the simplest one corresponds to the direct prediction and routing of breach outflow hydrograph. The approach involving erosion processes is only applied to earthen dams and demands a considerable amount of data concerning dam’s material. In addition, the produced rupture hydrograph with this last approach is very sensitive to the input data uncertainty, making this strategy less suitable than the simpler ones.

SIMPLIFIED METHODS

Currently, numerous software and simplified methods capable of reproducing the behavior of a dam breach are available. According to Ferla (2018)Ferla, R. (2018). Análise de aspectos hidráulicos de métodos simplificados envolvendo rompimento de barragens. Porto Alegre: UFRGS., the interest in developing simplified methods for determining dam failure characteristics has been known for at least 40 years. Melo et al. (2015)Melo, J. F., Araújo, L., Oliveira, M., Martins, T., Pinto, M., & Freitas, P. (2015). Hazard Potential Classification of Dams Using a Simplified Methodology. In 2nd International Dam World Conference (pp. 599-608). Lisboa, Portugal: LNEC. highlight the use of simplified methods for dam failure due to the lack of required input data for more sophisticated methods, such as terrain data, dam failure modes, hydraulic and hydrological data, among others. However, it is emphasized that the use of simplified methods should not subsidize the preparation of an Emergency Action Plan (EAP) for high hazard dams, since the results from these methods do not have the degree of detail necessary for the plan preparation. On the other hand, Agência Nacional de Águas (2016a)Agência Nacional de Águas – ANA. (2016a). Manual do Empreendedor sobre Segurança de Barragens Volume IV: Guia de Orientação e Formulários do Plano de Ação de Emergência - PAE. Brasília, DF: ANA. raises the possibility for smaller dams to be evaluated by means of simplified methods.

Hydrodynamic models, which are the usual choice for performing dam-break studies, seek to solve the complete Saint-Venant equations using numerical methods. Simplified approaches seek to propagate the rupture hydrograph, abridging the complexity of the problem without significant loss of results’ accuracy (Ferla, 2018Ferla, R. (2018). Análise de aspectos hidráulicos de métodos simplificados envolvendo rompimento de barragens. Porto Alegre: UFRGS.).

Muskingum-Cunge (Cunge, 1969Cunge, J. A. (1969). On the subject of a flood propagation computation method (Muskingum method). J. Hydrol. Res., 7(2), 205-230. http://dx.doi.org/10.1080/00221686909500264.
http://dx.doi.org/10.1080/00221686909500...
) and the Simplified Dam-Break Flood Modelling (Melo, 2015Melo, J. F. (2015). Simplified “Dam-Break” flood modeling. In 2nd International Dam World Conference (pp. 47-56). Lisboa, Portugal: LNEC.) are two of the existing methods that can be used to assess impacts from dam failure. These methods correspond, respectively, to a very widespread approach for routing hydrographs in rivers and channels (Ferla, 2018Ferla, R. (2018). Análise de aspectos hidráulicos de métodos simplificados envolvendo rompimento de barragens. Porto Alegre: UFRGS.), which consists of a simplification of Saint-Venant's equations, and a set of simplified procedures developed by Laboratório Nacional de Engenharia Civil (2014)Laboratório Nacional de Engenharia Civil – LNEC. (2014). Serviços Analíticos e Consultivos em Segurança de Barragens: Produto 6 - Classificação de Barragens Reguladas pela Agência Nacional de Água (Contrato Nº 051/ANA/2012). Brasília: Banco Mundial. for determining associated potential hazard of dams.

In general, simplified methods for dam-break analysis use the strategy of predicting the outflow breach hydrograph and then routing it downstream. The characteristics of the hydrograph that must be predicted are the peak outflow, the time necessary to reach the peak and the hydrograph’s shape, which is related to the volume of the hydrograph. These aspects have been object of several studies (such as Wetmore & Fread, 1981Wetmore, J., & Fread, D. L. (1981). The NWS Simplified “Dam-Break” Flood Forecasting Model (24 p.). Silver Spring, Maryland: National Weather Service, Office of Hydrology.; Froehlich, 2016Froehlich, D. C. (2016). Predicting peak discharge from gradually breached embankment dam. Journal of Hydrologic Engineering, 21(11), 04016041. http://dx.doi.org/10.1061/(ASCE)HE.1943-5584.0001424.
http://dx.doi.org/10.1061/(ASCE)HE.1943-...
), which produced a wide range of options and alternatives to estimate the breach hydrograph’s characteristics.

Peak outflow: several researchers have developed peak flow regression equations from historic dam failure data. These formulations were derived from data for earthen, zoned earthen, earthen with impervious core and rockfill dams only (U.S. Army Corps of Engineers, 2014U.S. Army Corps of Engineers – USACE. (2014). Using HEC-RAS for Dam-Break Studies. Davis, CA: Engineering Center.).

Froehlich (2016)Froehlich, D. C. (2016). Predicting peak discharge from gradually breached embankment dam. Journal of Hydrologic Engineering, 21(11), 04016041. http://dx.doi.org/10.1061/(ASCE)HE.1943-5584.0001424.
http://dx.doi.org/10.1061/(ASCE)HE.1943-...
indicates that the equations proposed by Froehlich (1995)Froehlich, D. C. (1995). Peak outflow from breached embankment dam. Journal of Water Resources Planning and Management, 121(1), 90-97. http://dx.doi.org/10.1061/(ASCE)0733-9496(1995)121:1(90).
http://dx.doi.org/10.1061/(ASCE)0733-949...
, Webby (1996)Webby, M. G. (1996). Discussion of ‘Peak outflow from breached embankment dam’ by D. C. Froehlich. J. Water Resources Planning and Management, 4(316), 316-317. http://dx.doi.org/10.1061/(ASCE)0733-9496(1996)122:4(316). and Azimi et al. (2015)Azimi, R., Vatankhah, A. R., & Kouchakzadeh, S. (2015). Predicting peak discharge from breached embankment dams. 36th IAHR World Congress, Hague, Netherlands. present, in general, good results. The equation developed by Ferla (2018)Ferla, R. (2018). Análise de aspectos hidráulicos de métodos simplificados envolvendo rompimento de barragens. Porto Alegre: UFRGS. should also be highlighted because the author restricted the database to overtopping cases of earthen and rockfill dams. The formulas developed by these authors are presented in Table 1.

Table 1
Peak outflow equations.

Time to reach the peak:Wahl (2004)Wahl, T. L. (2004). Uncertainty of predictions of embankment dam breach parameters. Journal of Hydraulic Engineering, 130(5), 389-397. http://dx.doi.org/10.1061/(ASCE)0733-9429(2004)130:5(389).
http://dx.doi.org/10.1061/(ASCE)0733-942...
states that the breach hydrograph peak time is close to the breach formation time, except for relatively small reservoirs where the peak can occur before the end of breach formation. There are several regression equations based on historic dam failure data to estimate time of the breach formation. Among existing equations, Wahl (2004)Wahl, T. L. (2004). Uncertainty of predictions of embankment dam breach parameters. Journal of Hydraulic Engineering, 130(5), 389-397. http://dx.doi.org/10.1061/(ASCE)0733-9429(2004)130:5(389).
http://dx.doi.org/10.1061/(ASCE)0733-942...
indicates the Von Thun & Gillette (1990)Von Thun, J. L., & Gillette, D. R. (1990). Guidance on breach parameters. Internal Memorandum, U.S. Dept. of the Interior, Bureau of Reclamation, Denver, 17. and Bureau of Reclamation (1988)Bureau of Reclamation (1988). Downstream hazard classification guidelines. ACER Tech. Memorandum No. 11, U.S. Department of the Interior, Bureau of Reclamation, Denver, 57. equations as underestimating the breach formation time, providing more critical scenarios than the other equations. A shorter time to reach the peak prompts in shorter time for evacuation downstream. Table 2 presents these authors’ equations.

Table 2
Equations for the prediction of the time to reach the peak outflow.

Hydrograph’s shape: several studies identify most influential aspects influencing rupture hydrograph’s shape (Kuhlkamp, 2016Kuhlkamp, J. F. (2016). Análise do efeito em cascata da propagação da onda de cheia gerada pelo rompimento hipotético de uma das barragens existentes no rio Irani-SC. 76 f. (Monografia). Faculdade de Engenharia Civil, Universidade Federal de Santa Catarina, Florianópolis.; Souza, 2016Souza, D. H. C. (2016). Análise probabilística e de sensibilidade dos parâmetros de um estudo de rompimento hipotético: barragem de terra. 91 f. (Dissertation). Faculdade de Engenharia Civil, Arquitetura e Urbanismo, Universidade Estadual de Campinas, Campinas.; Kim & Sanders, 2016Kim, B., & Sanders, B. F. (2016). Dam-break flood model uncertainty assessment: case study of extreme flooding with multiple dam failures in Gangneung, South Korea. Journal of Hydraulic Engineering, 142(5), 05016002. http://dx.doi.org/10.1061/(ASCE)HY.1943-7900.0001097.
http://dx.doi.org/10.1061/(ASCE)HY.1943-...
; Rocha, 2015Rocha, F. F. (2015). Retroanálise da Ruptura da Barragem São Francisco - Miraí, Minas Gerais, Brasil. 200 f. (Dissertation). Escola de Engenharia, Universidade Federal de Minas Gerais, Belo Horizonte.; Alvarez et al., 2017Alvarez, M., Puertas, J., Peña, E., & Bermudez, M. (2017). Two-dimensional dam-break flood analysis in data-scarce regions: the case study of Chipembe Dam, Mozambique. Water (Basel), 9(6), 432. http://dx.doi.org/10.3390/w9060432.
http://dx.doi.org/10.3390/w9060432...
; Hooshyaripor et al., 2017Hooshyaripor, F., Tahershamsi, A., & Razi, S. (2017). Dam break flood wave under different reservoir’s capacities and lengths. Sadhana, 42(9), 1557-1569. http://dx.doi.org/10.1007/s12046-017-0693-x.
http://dx.doi.org/10.1007/s12046-017-069...
; among others), namely the configuration of the breach, the Manning coefficient and the topography.

Predicting the breach outflow hydrograph’s shape, without using a predetermined breach evolution approach and having a software estimating it, is quite complex. For this reason, simplified forms of hydrographs have been used. In general, adopted shapes are: triangular with the peak at tp=0; triangular with the peak at tp≠0 and parabolic decay.

MATERIALS AND METHODS

The study’s main goal concerned the development of an approach to assess some of dam-break flood wave key hydraulic parameters. The adopted strategy consisted on performing computational dam-break simulations for several sets of predefined conditions in which the main parameters were changed. Then, the results were analyzed in order to deduce regression equations properly describing the peak flow attenuation and the peak discharge arrival time for each set of similar situations. The developed method was finally tested in a hypothetical case study.

The research was divided in six phases: (I) establishing the characteristics of dams to be studied; (II) scenarios and conditions; (III) breach outflow hydrographs; (IV) dam-break simulations; (V) results processing; (VI) case study.

Characteristics of the studied dams

Characteristics of the dams (height and the reservoir’s volume) used in the development of the simplified approach were carefully chosen in order to allow a significant application range.

The chosen dam heights and reservoir volumes determine the covered size of the dams. For the concept of dam size, the one adopted by Agência Nacional de Águas (2016b)Agência Nacional de Águas – ANA. (2016b). Manual do Empreendedor sobre segurança de Barragens Volume III: Guia de Revisão Periódica de Segurança de Barragens. Brasília, DF: ANA. was considered, which is based on French standards definition (ICOLD Bulletin No. 157) and on Portuguese legislation. It derives from a quantitative factor X, Equation 8, and a qualitative range of classification, presented in Table 3.

X = H d 2 . V r 10 6 (8)

Where: Hd is the dam height (m); Vr is the volume of the reservoir (m3).

Table 3
Dams’ size classification based on to the factor X value.

Relative and cumulative frequencies were established to describe the current characteristics of Brazilian dams regarding dam heights and reservoir volumes. This was done taking into account the dams registered by the Brazilian Dam Safety Report (Agência Nacional de Águas, 2017Agência Nacional de Águas – ANA. (2017). Relatório de Segurança de Barragens. Brasília, DF: ANA.) that possess both characteristics. Figure 1 presents the relative and cumulative frequencies concerning dam heights, while Figure 2 presents the same information concerning reservoir volume.

Figure 1
Brazilian dam height relative and cumulative frequencies.
Figure 2
Brazilian reservoir volume relative and cumulative frequencies.

From these figures, approximately 75% of registered dams have height below 15 m, while 72% have a volume below 3 hm3. In other words, most of the registered dams possess characteristics not covered by the law and could be evaluated through simplified methods.

Therefore, considering the current characteristics of Brazilian dams, a set of four pre-defined heights (varyingfrom5mto30m,whichcorrespondsto60%ofthedams) and another set of four pre-defined volumes (varyingfrom5x106m3to50x106m3,whichcorrespondsto10%ofthedams) were chosen for this analysis. The combination of both sets of characteristics was made so that the method covers all three size categories. Thus, twelve dams with different characteristics, as shown in Table 4, were considered. The selection is composed of five Small dams, four Large dams and three Medium dams.

Table 4
Characteristics of the selected dams.

Scenarios and conditions

Zhang et al. (2007)Zhang, L. M., Xu, Y., & Jia, J. S. (2007 October 18-19). Analysis of earth dam failures: A database approach. In 1st International Symposium on Geotechnical Safety & Risk. China: Tongji University. point out earthen dams as being the type most subject to failure. Thus, it was decided to consider only earthen dams in this study, the adopted failure mechanisms and remaining aspects having been selected based on this choice. Overtopping was considered for the rupture mechanism, since it is recognized as being the most frequent cause of ruptures (Imbrogno, 2014Imbrogno, D. F. (2014). Analysis of Dam Failures and Development of a Dam Safety Evaluation Program (Doctoral dissertation). Ohio State University, Ohio.).

Among the rupture scenarios presented by Agência Nacional de Águas (2016a)Agência Nacional de Águas – ANA. (2016a). Manual do Empreendedor sobre Segurança de Barragens Volume IV: Guia de Orientação e Formulários do Plano de Ação de Emergência - PAE. Brasília, DF: ANA., the most unfavorable rupture was chosen, which assumes the occurrence of rapid and total ruptures, potentially generating more serious consequences. Additionally, an overtopping head of 0,15 m over the crest of the dams was adopted, this assumption being accepted as the minimum height to start the breach formation (Agência Nacional de Águas, 2016aAgência Nacional de Águas – ANA. (2016a). Manual do Empreendedor sobre Segurança de Barragens Volume IV: Guia de Orientação e Formulários do Plano de Ação de Emergência - PAE. Brasília, DF: ANA.).

Breach outflow hydrographs

To characterize the breach outflow hydrograph, one must estimate: the peak outflow; the peak time; and the hydrograph shape.

Considering a conservative approach, the peak outflow corresponds to the maximum calculated flow among the equations proposed by Froehlich (1995)Froehlich, D. C. (1995). Peak outflow from breached embankment dam. Journal of Water Resources Planning and Management, 121(1), 90-97. http://dx.doi.org/10.1061/(ASCE)0733-9496(1995)121:1(90).
http://dx.doi.org/10.1061/(ASCE)0733-949...
, Webby (1996)Webby, M. G. (1996). Discussion of ‘Peak outflow from breached embankment dam’ by D. C. Froehlich. J. Water Resources Planning and Management, 4(316), 316-317. http://dx.doi.org/10.1061/(ASCE)0733-9496(1996)122:4(316)., Azimi et al. (2015)Azimi, R., Vatankhah, A. R., & Kouchakzadeh, S. (2015). Predicting peak discharge from breached embankment dams. 36th IAHR World Congress, Hague, Netherlands. and Ferla (2018)Ferla, R. (2018). Análise de aspectos hidráulicos de métodos simplificados envolvendo rompimento de barragens. Porto Alegre: UFRGS.. Conversely, the peak time will correspond to the minimum time given by the equations of Bureau of Reclamation (1988)Bureau of Reclamation (1988). Downstream hazard classification guidelines. ACER Tech. Memorandum No. 11, U.S. Department of the Interior, Bureau of Reclamation, Denver, 57. and Von Thun & Gillette (1990)Von Thun, J. L., & Gillette, D. R. (1990). Guidance on breach parameters. Internal Memorandum, U.S. Dept. of the Interior, Bureau of Reclamation, Denver, 17.. Regarding the hydrograph shape, it was assumed a triangular shape with the peak conservatively attp0.

Dam-break simulations

The simulations were performed in a prismatic hypothetical channel. This channel is 500 km long, allowing a prolonged downstream analysis of the flood-wave. Only one channel slope was considered: a moderate slope of 0.001 m/m has been set, based on the information presented by Washington State Department of Ecology (2007)Washington State Department of Ecology (2007). Dam safety guidelines: Technical note 1 - Dam break inundation analysis and downstream hazard classification. Olympia, Washington: Department of Ecology.. The cross section is trapezoidal with lower width and height large enough so that the maximum flow does not lead to channel overtopping. For that reason, a lower width of 85 m and lateral wall slopes of 1V:2H were adopted.

Since the study does not aim to assess the influence of downstream valley sections roughness, a unique roughness was assumed for all sections. As shown by Fema (Federal Emergency Management Agency, 2001Federal Emergency Management Agency – FEMA. (2001). The National Dam Safety Program - Research needs workshop: Hydrologic issues for dams. Denver, Colorado: FEMA.), adopting a roughness aggregating both main channel behavior and floodplain is required. In the studies presented by Fema (Federal Emergency Management Agency 2001Federal Emergency Management Agency – FEMA. (2001). The National Dam Safety Program - Research needs workshop: Hydrologic issues for dams. Denver, Colorado: FEMA.), a Manning coefficient between 0.04and 0.05m1/3swas adopted for the downstream valleys. Thus, it was decided to adopt a roughness coefficient of0.042m1/3s, slightly higher than values normally adopted for main channels, but close to the lower limit used for floodplains.

Additionally, simulations were carried out using the HEC-RAS software, version 5.0.7., which is widely accepted in technical and scientific environments. This software is one of the most used in dam-break studies, being accepted as the current state of the art (Ferla, 2018Ferla, R. (2018). Análise de aspectos hidráulicos de métodos simplificados envolvendo rompimento de barragens. Porto Alegre: UFRGS.). Choosing between 1D and 2D models shall be judicious as there are cases where 2D models can produce better results than 1D models, as well as cases where the opposite is true (U.S. Army Corps of Engineers, 2016U.S. Army Corps of Engineers – USACE. (2016). HEC-RAS: River Analysis System. 2D Modelling User's Manual. Davis, CA: USACE.). However, based on the information available and the conditions adopted for the research in which the simplified aspect is key, a 1D model was chosen to perform the simulations.

As previously mentioned, among the described available simulation strategies, the most used one corresponds to the pre-determined evolution of the breach. However, there is no clear reason for opting for this approach compared to a simpler approach, such as the routing of the simplified breach hydrograph, since both encompass many uncertainties. Therefore, for this study, the simplest strategy was chosen precisely due to the intended simplified approach relying on very limited quantity of data.

To avoid instabilities in HEC-RAS model, an initial water level in the channel of approximately 1.3 m was assumed. This water height corresponds to an initial discharge (base flow) of approximately100m3s1. Concerning the downstream valley discretization, cross sections were considered with intervals of 350 m. Time discretization assuming one minute intervals was considered.

Results processing

The proposed approach aims at providing a simplified approximation of peak flow attenuation and peak discharge arrival times. The results analysis has been conducted by means of dimensional analysis. This type of analysis enables future comparison of current results with others from simulations covering different types of channels cross sections, slopes, etc. Additionally, this analysis provides an overview of the differences between the different hydrographs and methods.

An aspect to be highlighted derives from the fact that most peak outflow equations award more importance to the parameter water height at the moment of rupture. Considering that aspect and the characteristics of selected dams, the established relationships were grouped by dams’ heights. In other words, it is assumed that dams with the same height have similar behaviors.

Case study

A case study was carried out to evaluate the proposed approach, in which results from hydrodynamic numerical simulation, considered as the reference scenario, are compared with both the results from the developed simplified approach and those from the methodology Simplified Dam-Break Flood Modeling proposed in Melo (2015)Melo, J. F. (2015). Simplified “Dam-Break” flood modeling. In 2nd International Dam World Conference (pp. 47-56). Lisboa, Portugal: LNEC.. This analysis enables an accuracy and efficiency verification of both simplified methods concerning maximum discharges, water heights and peak discharge arrival time.

This case study considers a hypothetical dam with 15mand 17hm3of reservoir volume. As for the downstream valley, eight real topobathymetric sections over 43 km, named section A to H, were evaluated (Table 5 and Figure 3). Thevalleyhasanaveragesectionwidthof630mandanaveragethalwegslopeof0.0008mm1. Considering the valley characteristics, roughnesscoefficientsof0.03m1/3sforthemainchanneland0.08m1/3sfor the floodplain outer banks’ area were adopted. All characteristics considered for the case study are within the hypothetical ones used for establishing the hereby proposed simplified approach.

Table 5
Downstream valley's cross sections characteristics.
Figure 3
Case study downstream valley’s cross sections.

The hydrodynamic simulation was carried out with the HEC-RAS 1D considering the simplified breach hydrograph routing. Overtopping failure is triggered when water level reaches 0.15 m over dam's crest. Breach outflow hydrograph was obtained considering the same process of simplified approach development. As an initial condition, at the moment of rupture, a discharge (Q0) of 1,098m3s1 flowing along the downstream valley was assumed, corresponding to the ten year return period flood for the region. Regarding space discretization, cross sections were placed every 900 m along the channel. One minute time intervals were considered in the computational model.

RESULTS AND DISCUSSION

Firstly, breach hydrographs characteristics used to perform the simulations are presented. Then results obtained for peak flow attenuation and peak discharge arrival time. Finally, case study results are described and discussed.

Breach hydrographs

Peak flows were determined as the maximum flow among the four presented methods. Table 6 shows maximum peak flows and its corresponding equation.Peakflowsvaryfrom863m3s1DamBIto11,085m3s1DamBXII, corresponding respectively to the smallest and largest considered dams.

Table 6
Peak outflows and respective methods of the breach hydrographs for each dam.

Regarding breach hydrographs peak times (presented in Table 7), the method providing the most critical scenario was Von Thun & Gillette (1990)Von Thun, J. L., & Gillette, D. R. (1990). Guidance on breach parameters. Internal Memorandum, U.S. Dept. of the Interior, Bureau of Reclamation, Denver, 17. for erodible materials, which is characterized by fast ruptures. For 5 m dams, peak is reached with 0.08 hours. For 10 m and 15 m dams, peak is reached after 0.15 and 0.23 hours, respectively. Lastly, for 30 m dams, peak is reached 0.45 hours after start of breach formation.

Table 7
Peak time and Base time of the breach hydrographs.

A triangular shaped hydrograph was adopted as, according with literature, it is the most commonly considered for these modeling strategies. Therefore, breach hydrograph base time was estimated considering the peak time and the necessary time for reservoir to drawdown after reaching the peak outflow. These times vary from 1.43 (Dam BVII) to 7.4 hours (Dam BVIII).

Peak flow attenuation

Peak flow attenuation was analyzed relating maximum discharges at each section (Qmáx) with corresponding breach peak outflows and downstream valley base flow (Q0). Figures 4, 5, 6, 7 show this relationship evolution for dams 5, 10, 15 and 30 m high, respectively.

Figure 4
Peak flow attenuation through the downstream channel 5mdams.
Figure 5
Peak flow attenuation through the downstream channel 10mdams.
Figure 6
Peak flow attenuation through the downstream channel 15mdams.
Figure 7
Peak flow attenuation through the downstream channel 30mdams.

A similar behavior was found across all dams’ groups, a larger attenuation being noticeable in the first 50 to 100 km from dam section, ranging from 37% (Dam BVIII) to 85% (Dam BVII). Further downstream the attenuation between successive sections decreases, tending progressively to a steady behavior. In the downstream most section, attenuation varies between 76% (Dam BVIII) and 95% (Dam BVII).

Another factor noticed in all groups is that the lowest flow attenuation corresponds to the dam with the largest reservoir. This result makes sense, as the downstream channel is the same for all dams, it would be expectable a greater difficulty in attenuating the larger water volumes.

From the behavior presented by each dams’ group, one can infer that the bigger dam height, the bigger the peak flow attenuation. In other words, there was a more significant attenuation for higher flows, which are obtained with higher dams. In the downstream most section, peak flow attenuation for dams 30 m high is around 95%, while for dams 5 m high, attenuation is around 80%. A similar behavior was also observed by Fread & Lewis (1998)Fread, D. L., & Lewis, J. M. (1998). NWS FLDWAV Model: Theoretical description and user documentation (335 p.). Silver Spring, MD: Hydrologic Research Laboratory, Office of Hydrology, National Weather Service, NOAA., who showed abrupt hydrographs, with large peak flows and short times to reach the peak, can experience considerable attenuation when passing through wide floodplains.

After verifying that all flow attenuation curves present an exponential decay, an attempt was made to find an equation to describe this behavior, which lead to Equation 9:

Q máx Q p + Q 0 = 1 + a L H d 1 b (9)

Where: Qmáx is the maximum discharge in a specific section (m3 s-1); Qp is the rupture peak flow (m3 s-1); Q0 is the downstream valley base flow (m3 s-1); L is the distance from the dam section (m); Hd is the dam height (m); “a” and “b” are equation parameters.

Figure 8 and Figure 9 present the behavior of parameters “a” and “b” of Equation 9 for each of the dams, based on a dimensionless index that allows differentiation of each of the dams according to their volume and height (Vr(1/3)Hd1).

Figure 8
Behavior of parameter aas a function of Vr(1/3)Hd1.
Figure 9
Behavior of parameter bas a function of Vr(1/3)Hd1.

Analyzing the relationship of each parameter of the proposed equation withVr(1/3)Hd1, two types of behavior are perceived: both parameters present a similar trend for dams of same height; and a unique trend is observed for parameter “a”, independent of dam height or volume. Based on these behaviors, equations were adjusted, for each group of dams, to describe the relation of parameters “a” and “b” withVr(1/3)Hd1. These equations are presented in Table 8 and Table 9.

Table 8
Equations of parameter “a” as a function of the dimensionless variable that characterizes the dam.
Table 9
Equations of parameter “b” as a function of the dimensionless variable that characterizes the dam.

Within the intervals used in the equations’ deduction, the use of Equation 9 for dams with different heights and volumes becomes possible by interpolating from the presented regression curves. Thereby, starting from basic information, such as the characteristics of a dam, and calculating the maximum rupture flow with the existing methodologies, obtaining an estimate of maximum flows in any downstream valley cross section becomes feasible.

Peak discharge arrival time

A dimensionless variable was established for the peak discharge arrival time analysis. It relates the arrival time of flood wave peak, maximum flow in each section and reservoir’s volume at the time of rupture (tcQmáxVr1). Having some sort of simplified approach to describe this dimensionless variable behavior would result in a useful tool for estimating the required time for the flood wave to reach its most critical level.

Based on simulation results, Figures 10, 11, 12, 13 show the hereby considered dimensionless variable evolution for all studied dams’ groups. As expected, a positive trend is observed as dam distance along the valley increases. This may be explained by the evident fact that peak discharge arrival time increases with distance, any influence from other parameters being very small. The observed relationship variation between maximum discharge (Qmax) and reservoir volume at rupture (Vr) is not significant because of the volumes’ magnitude. Therefore, the behavior of the dimensionless variable (tcQmáxVr1) is mostly ruled by the time parameter. Additionally, in all groups, the larger the dam (largest both in height and volume) the smaller the magnitude of the dimensionless variable. This occurs because, the channel being the same for all analyzed cases, the higher the discharge, the larger the flow velocity and, consequently, the shorter the time to reach the most critical hydraulic situation. The results also showed that magnitude of the dimensionless variable is similar for dams of the same volume (BI, BII and BIII; BIV, BV and BVI).

Figure 10
Dimensionless relation of the arrival time of the peak discharge 5mdams.
Figure 11
Dimensionless relation of the arrival time of the peak discharge 10mdams.
Figure 12
Dimensionless relation of the arrival time of the peak discharge 15mdams.
Figure 13
Dimensionless relation of the arrival time of the peak discharge 30mdams.

The dimensionless variable behavior concerning peak discharge arrival time resembles a potential curve. A process of results best fit regression enabled the deduction of Equation 18, which shall be used for LHd-1 > 0 to prevent null calculated time (physically impossible).ForLHd1=0, peak discharge arrival time corresponds to the peak time of breach hydrograph, calculated with existing methods as already described.

Therefore, forLHd1>0:

t c Q m á x V r = α L H d β (18)

Where: tc is the peak discharge arrival time (s); Qmáx is the maximum discharge in a specific section (m3/s); Vr is the reservoir’s volume (m3); L is the distance from the dam section (m); Hd is the dam height (m); α and β are equation parameters.

The relationships between parameters (α and β) of Equation 18 and dimensionless variable Vr(1/3)Hd1is graphically shown in Figure 14 and Figure 15. They evidence different behaviors for each dam height, similarly to what was observed for peak flow attenuation. Thus, equations have been proposed to characterize this behavior, as shown in Table 10 and Table 11.

Figure 14
Behavior of parameter α as a function ofVr(1/3)Hd1.
Figure 15
Behavior of parameter β as a function ofVr(1/3)Hd1.
Table 10
Equations of parameter α as a function of the dimensionless variable that characterizes the dam.
Table 11
Equations of parameter β as a function of the dimensionless variable that characterizes the dam.

The proposed equations in these tables allow the use of Equation 18 in conjunction with Equation 9, both requiring very few input data while providing means for estimating the required time for the most critical hydraulic conditions to be reached. This represents a considerable progress due to its expediency and ease of use, being rather innovative regarding dam rupture flood wave characteristics assessment based on simplified methods.

Case study

A case study is presented in which results obtained from the hydrodynamic simulations (reference scenario) are compared with those obtained from simplified methods according the following criteria:

  • Maximum discharges: calculated for each cross section by Equation 9 and by the Simplified Dam-Break Flood Modeling (Melo, 2015Melo, J. F. (2015). Simplified “Dam-Break” flood modeling. In 2nd International Dam World Conference (pp. 47-56). Lisboa, Portugal: LNEC.) method;

  • Water heights: calculated using Manning’s equation combined with maximum discharges obtained in each of the simplified approaches. Since there are different roughness coefficient values for the main channel and the outer banks’ area, a mean between both coefficients was adopted;

  • Peak discharge arrival time: calculated using Equation 18 combined with the maximum discharges obtained in each of the simplified approaches, as described in the item of the present case study.

Table 12 presents the peak outflows calculated with equations from Froehlich (1995)Froehlich, D. C. (1995). Peak outflow from breached embankment dam. Journal of Water Resources Planning and Management, 121(1), 90-97. http://dx.doi.org/10.1061/(ASCE)0733-9496(1995)121:1(90).
http://dx.doi.org/10.1061/(ASCE)0733-949...
, Webby (1996)Webby, M. G. (1996). Discussion of ‘Peak outflow from breached embankment dam’ by D. C. Froehlich. J. Water Resources Planning and Management, 4(316), 316-317. http://dx.doi.org/10.1061/(ASCE)0733-9496(1996)122:4(316)., Azimi et al. (2015)Azimi, R., Vatankhah, A. R., & Kouchakzadeh, S. (2015). Predicting peak discharge from breached embankment dams. 36th IAHR World Congress, Hague, Netherlands. and Ferla (2018)Ferla, R. (2018). Análise de aspectos hidráulicos de métodos simplificados envolvendo rompimento de barragens. Porto Alegre: UFRGS., while Table 13 presents the time to reach the peak outflow calculated with the equations from Bureau of Reclamation (1988)Bureau of Reclamation (1988). Downstream hazard classification guidelines. ACER Tech. Memorandum No. 11, U.S. Department of the Interior, Bureau of Reclamation, Denver, 57. and Von Thun & Gillette (1990)Von Thun, J. L., & Gillette, D. R. (1990). Guidance on breach parameters. Internal Memorandum, U.S. Dept. of the Interior, Bureau of Reclamation, Denver, 17.. Based on the dam characteristics, the most critical breach output hydrograph (Figure 16) was obtained with peak outflow calculated with Azimi et al. (2015)Azimi, R., Vatankhah, A. R., & Kouchakzadeh, S. (2015). Predicting peak discharge from breached embankment dams. 36th IAHR World Congress, Hague, Netherlands. equation and time to reach the peak calculated with Von Thun & Gillette (1990)Von Thun, J. L., & Gillette, D. R. (1990). Guidance on breach parameters. Internal Memorandum, U.S. Dept. of the Interior, Bureau of Reclamation, Denver, 17. equation for erodible materials. In order to proceed with the dam-break analysis in the downstream valley, the estimated rupture hydrograph must be added to the base flow (initialconditionQ0=1.098m3s1).

Table 12
Peak outflow (m3s-1) calculated for the studied dam.
Table 13
Time to reach the peak (h) calculated for the studied dam.
Figure 16
Case study breach outflow hydrograph.
  1. a

    Maximum discharges

Maximum discharges calculated in the numerical simulations, as well as discharges estimated by Equation 9 and using Melo (2015)Melo, J. F. (2015). Simplified “Dam-Break” flood modeling. In 2nd International Dam World Conference (pp. 47-56). Lisboa, Portugal: LNEC. method, are presented in Figure 17.

Figure 17
Maximum discharges throughout the downstream valley.

The maximum discharges over downstream valley entire length provided by Equation 9 lead to a conservative scenario, since they are, on average, 15% higher than corresponding discharges obtained by computer simulation. Considering the tendency presented by the method, possibly further downstream of last studied cross section (43 km downstream from the dam section) estimated discharges using Equation 9 are closer to the ones obtained through computational simulation.

The simplified method of Melo (2015)Melo, J. F. (2015). Simplified “Dam-Break” flood modeling. In 2nd International Dam World Conference (pp. 47-56). Lisboa, Portugal: LNEC. provided a scenario in favor of safety until a section 23 km downstream from the dam. Past that section, estimated discharges are below those obtained through computational simulations. Over the first 23 km of the valley, maximum discharges are, on average, 7.8% above simulations’ results.

  1. b

    Water heights

Water heights obtained by the simulations as well as the ones calculated combining Manning equation with Equation 9, and Melo’s method (Melo, 2015Melo, J. F. (2015). Simplified “Dam-Break” flood modeling. In 2nd International Dam World Conference (pp. 47-56). Lisboa, Portugal: LNEC.), are presented in Figure 18.

Figure 18
Water heights throughout the downstream valley.

Similarly to what was observed for discharges, water heights obtained from discharges estimated using Equation 9 are higher throughout the entire downstream valley than those obtained by the numerical simulations. Average relative error between flows is approximately 8%. Along the valley, maximum and minimum differences between water heights are, respectively, 0.61 and 0.20 m. Results comparison shows the use of hereby proposed approach provides conservative results, although quite close to the reference scenario.

Melo (2015)Melo, J. F. (2015). Simplified “Dam-Break” flood modeling. In 2nd International Dam World Conference (pp. 47-56). Lisboa, Portugal: LNEC. simplified approach estimates water heights above those from HEC-RAS up to a distance of 23 km from the dam section. Although water heights in this stretch with the simplified approach exceed the numerical simulation, maximum difference is 0.50 m. From that section on, maximum difference increases to 0.69 m.

  1. c

    Peak discharge arrival time of the

Peak discharge arrival times obtained by the simulations as well as the ones calculated by the combination of Equation 18 with Equation 9, and Melo’s method (Melo, 2015Melo, J. F. (2015). Simplified “Dam-Break” flood modeling. In 2nd International Dam World Conference (pp. 47-56). Lisboa, Portugal: LNEC.), are presented in Figure 19.

Figure 19
Arrival time of the peak discharge throughout the downstream valley.

Both simplified methods underestimate peak discharge arrival time, a conservative scenario being, therefore, produced. This behavior can be justified by the fact that Equation 18 does not consider storage effects, since it was derived assuming a channel where its cross sections do not allow the simulation of such aspect.

CONCLUSIONS

The paper’s main objective is to present a simplified approach to evaluate dam failures flood waves characteristics, specifically peak flow attenuation and peak discharges arrival times along dam’s downstream valleys. Those aspects were selected because, if one can estimate these parameters, then other key aspects for assessing dam ruptures consequences can be derived from them. Nevertheless, as other simplified methods, this approach cannot be used directly in the elaboration of high-risk dams’ EAPs. On the other hand, it can be applied in situations such as dam-break studies pre-assessment phases or definition of dams’ associated potential hazard.

To achieve this goal, simulations of hypothetical dam ruptures were carried out with the HEC-RAS 1D software based on simplified rupture hydrograph routing strategy, as normally considered in most simplified methods. These methods are normally based on scarce and inaccurate empirical data from past dam failures and, for that reason, should always be applied considering conservative hypothesis. On the other hand, the usual procedure to evaluate dam failures effects consists on performing simulations with software that solve the Saint Venant’s equations. Judiciously combining these two approaches for a set of predefined hypothetical dams covering most common practical situations in terms of dam sizes can, therefore, be a promising way of enhancing the use of simplified approaches.

For the development of the hereby proposed simplified method, twelve different size hypothetical dams were studied, considering the size criteria proposed by Agência Nacional de Águas (2016b)Agência Nacional de Águas – ANA. (2016b). Manual do Empreendedor sobre segurança de Barragens Volume III: Guia de Revisão Periódica de Segurança de Barragens. Brasília, DF: ANA.. For each of these dams, the most critical cases were studied in order to provide an approach leading to results with a certain safety margin. Breach hydrographs of each dam were routed in a fictitious uniform trapezoidal channel, 500 km in length with constant slope (0.001 m m-1).

From simulations’ results, equations were empirically deduced describing the behavior of each studied flow parameter. For peak flow attenuation, Equation 9 was defined describing a potential decay behavior. Peak discharge arrival time was described using Equation 18, being noteworthy that it shall be considered only forLHd1>0.

In order to assess the simplified methods’ efficiency when compared with more complex models, a case study was analyzed considering a real topobatimetry and a hypothetical 15 m high dam with 17 hm3 of reservoir volume. An average 0.0008 m m-1 slope downstream valley topobatimetry was assumed, close to that used for the simplified approach development, presented in this paper. In addition, the case study considered characteristics that fall within the range of dam sizes adopted for the research. The evaluated simplified methods correspond to the set of equations proposed in this paper and to the method proposed in Melo (2015)Melo, J. F. (2015). Simplified “Dam-Break” flood modeling. In 2nd International Dam World Conference (pp. 47-56). Lisboa, Portugal: LNEC.. The parameters evaluated in the case study are: maximum discharge, water height and peak discharge arrival time. The case study reiterates the simplified methods applicability, since results are close to the ones from hydrodynamic simulations. Additionally, the case study results presented a better performance for maximum discharges and water heights using Equation 9 rather than the method proposed in Melo (2015)Melo, J. F. (2015). Simplified “Dam-Break” flood modeling. In 2nd International Dam World Conference (pp. 47-56). Lisboa, Portugal: LNEC.. The proposed approach provides conservative results, but reasonably close to those obtained by hydrodynamic simulations: the average difference is 15% for discharge and over 8% for water height. Differently, all the simplified methods underestimated the flood wave peak arrival times by approximately 50%, which, for this specific aspect, translates into a conservative result.

According to Melo et al. (2015)Melo, J. F., Araújo, L., Oliveira, M., Martins, T., Pinto, M., & Freitas, P. (2015). Hazard Potential Classification of Dams Using a Simplified Methodology. In 2nd International Dam World Conference (pp. 599-608). Lisboa, Portugal: LNEC., classification concerning potential damage and associated risk is the main objective of simplified methodologies. Therefore, any method that makes it possible to estimate maximum water levels resulting from a rupture in predefined sections downstream of a dam meets the requirements. Despite considering very limited information (height and volume of the reservoir), the proposed simplified approach enables an assessment of important aspects of the rupture at any downstream valley section, from which maximum water levels can be obtained, fitting Melo’s description.

It must be highlighted that the proposed approach in the present paper still requires further testing involving additional case studies and further enhancements by expanding dam characteristics range. This will enable broadening of hereby proposed equations applicability range. On that note, in addition to increasing the database of dam characteristics, applying the same strategy to channels with different slopes and roughnesses, as well as with sections of different geometries and areas, is recommended. Doing so, the influence of roughness and topography can be added into the method. These improvements will allow a more complete set of equations for dam-break flood consequences assessment. However, for now, it also must be emphasized that the application of this approach is limited to similar conditions of those used in its elaboration.

AKNOWLEDGEMENTS

This study was sponsored by Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq).

REFERENCES

  • Agência Nacional de Águas – ANA. (2016a). Manual do Empreendedor sobre Segurança de Barragens Volume IV: Guia de Orientação e Formulários do Plano de Ação de Emergência - PAE Brasília, DF: ANA.
  • Agência Nacional de Águas – ANA. (2016b). Manual do Empreendedor sobre segurança de Barragens Volume III: Guia de Revisão Periódica de Segurança de Barragens Brasília, DF: ANA.
  • Agência Nacional de Águas – ANA. (2017). Relatório de Segurança de Barragens Brasília, DF: ANA.
  • Alvarez, M., Puertas, J., Peña, E., & Bermudez, M. (2017). Two-dimensional dam-break flood analysis in data-scarce regions: the case study of Chipembe Dam, Mozambique. Water (Basel), 9(6), 432. http://dx.doi.org/10.3390/w9060432
    » http://dx.doi.org/10.3390/w9060432
  • Arab News. (2020, August 02). ‘Hundreds’ of homes destroyed after Sudan dam collapse. Arab News Retrieved in 2020, August 5, from https://www.arabnews.com/node/1713711/middle-east
    » https://www.arabnews.com/node/1713711/middle-east
  • Azimi, R., Vatankhah, A. R., & Kouchakzadeh, S. (2015). Predicting peak discharge from breached embankment dams 36th IAHR World Congress, Hague, Netherlands.
  • Bates, P. D., & De Roo, A. P. J. (2000). A simple raster-based model for floodplain inundation. Journal of Hydrology (Amsterdam), 236(1-2), 54-77. http://dx.doi.org/10.1016/S0022-1694(00)00278-X
    » http://dx.doi.org/10.1016/S0022-1694(00)00278-X
  • Bureau of Reclamation (1988). Downstream hazard classification guidelines. ACER Tech. Memorandum No. 11, U.S. Department of the Interior, Bureau of Reclamation, Denver, 57.
  • Cunge, J. A. (1969). On the subject of a flood propagation computation method (Muskingum method). J. Hydrol. Res., 7(2), 205-230. http://dx.doi.org/10.1080/00221686909500264
    » http://dx.doi.org/10.1080/00221686909500264
  • Elisa, T., & Campos, C. (2020, Maio 31). Barragem se rompe na zona rural de Perdizes. G1 Retrieved in 2020, June 11, from https://g1.globo.com/mg/triangulo-mineiro/noticia/2020/05/31/rompimento-de-acude-e-registrado-na-zona-rural-de-perdizes-neste-domingo.ghtml
    » https://g1.globo.com/mg/triangulo-mineiro/noticia/2020/05/31/rompimento-de-acude-e-registrado-na-zona-rural-de-perdizes-neste-domingo.ghtml
  • Ellison, G. (2020). Edenville Dam failure investigation to take ‘many months’. MLive Accessed in August 5th, 2020, from https://www.mlive.com/news/2020/06/edenville-dam-failure-investigation-to-take-many-months.html
    » https://www.mlive.com/news/2020/06/edenville-dam-failure-investigation-to-take-many-months.html
  • Federal Emergency Management Agency – FEMA. (2001). The National Dam Safety Program - Research needs workshop: Hydrologic issues for dams Denver, Colorado: FEMA.
  • Ferla, R. (2018). Análise de aspectos hidráulicos de métodos simplificados envolvendo rompimento de barragens Porto Alegre: UFRGS.
  • Ferla, R., Priebe, P. S., Novakoski, C. K., Hampe, R. F., Saliba, A. P. M., Teixeira, E. D., & Marques, M. G. (2017). Utilização de diferentes equações empíricas na previsão de características de inundação proveniente do rompimento de barragens. Simpósio de Hidráulica e Recursos Hídricos dos Países de Língua Portuguesa (SILUSBA), Porto, Portugal: APRH.
  • Ferretti, C. (2020, August 9). Minor damage expected from partial breach of Hillsdale County dam. The Detroit News Accessed in 2020, August 5, from https://www.detroitnews.com/story/news/local/michigan/2020/08/09/minor-damage-expected-partial-breach-hillsdale-county-dam/3331548001/
    » https://www.detroitnews.com/story/news/local/michigan/2020/08/09/minor-damage-expected-partial-breach-hillsdale-county-dam/3331548001/
  • Fread, D. L. (1991). The NWS DAMBRK model: Theoretical background/User documentation (123 p.). Silver Spring, MD: Hydrologic Research Laboratory, Office of Hydrology, National Weather Service, NOAA.
  • Fread, D. L., & Lewis, J. M. (1998). NWS FLDWAV Model: Theoretical description and user documentation (335 p.). Silver Spring, MD: Hydrologic Research Laboratory, Office of Hydrology, National Weather Service, NOAA.
  • Froehlich, D. C. (1995). Peak outflow from breached embankment dam. Journal of Water Resources Planning and Management, 121(1), 90-97. http://dx.doi.org/10.1061/(ASCE)0733-9496(1995)121:1(90)
    » http://dx.doi.org/10.1061/(ASCE)0733-9496(1995)121:1(90)
  • Froehlich, D. C. (2016). Predicting peak discharge from gradually breached embankment dam. Journal of Hydrologic Engineering, 21(11), 04016041. http://dx.doi.org/10.1061/(ASCE)HE.1943-5584.0001424
    » http://dx.doi.org/10.1061/(ASCE)HE.1943-5584.0001424
  • G1 Caruaru (2020, Junho 15). Barragem se rompe em Sairé e água invade casas em Barra de Guabiraba. G1 Accessed in 2020, August 5, from https://g1.globo.com/pe/caruaru-regiao/noticia/2020/06/15/barragem-rompe-em-saire-e-agua-invade-casas-em-barra-de-guabiraba.ghtml
    » https://g1.globo.com/pe/caruaru-regiao/noticia/2020/06/15/barragem-rompe-em-saire-e-agua-invade-casas-em-barra-de-guabiraba.ghtml
  • Grimaldi, S., & Poggi, D. (2010). A synthetic method for assessing the risk of dam flooding 78th International Commission on Large Dams Annual Meeting Hanoi, Vietnã: ICOLD.
  • Hooshyaripor, F., Tahershamsi, A., & Razi, S. (2017). Dam break flood wave under different reservoir’s capacities and lengths. Sadhana, 42(9), 1557-1569. http://dx.doi.org/10.1007/s12046-017-0693-x
    » http://dx.doi.org/10.1007/s12046-017-0693-x
  • Imbrogno, D. F. (2014). Analysis of Dam Failures and Development of a Dam Safety Evaluation Program (Doctoral dissertation). Ohio State University, Ohio.
  • Jansen, R. B. (1983). Dams and Public Safety Denver, CO: US Departament of Interior, Bureau of Reclamation.
  • Kim, B., & Sanders, B. F. (2016). Dam-break flood model uncertainty assessment: case study of extreme flooding with multiple dam failures in Gangneung, South Korea. Journal of Hydraulic Engineering, 142(5), 05016002. http://dx.doi.org/10.1061/(ASCE)HY.1943-7900.0001097
    » http://dx.doi.org/10.1061/(ASCE)HY.1943-7900.0001097
  • Kuhlkamp, J. F. (2016). Análise do efeito em cascata da propagação da onda de cheia gerada pelo rompimento hipotético de uma das barragens existentes no rio Irani-SC 76 f. (Monografia). Faculdade de Engenharia Civil, Universidade Federal de Santa Catarina, Florianópolis.
  • Laboratório Nacional de Engenharia Civil – LNEC. (2014). Serviços Analíticos e Consultivos em Segurança de Barragens: Produto 6 - Classificação de Barragens Reguladas pela Agência Nacional de Água (Contrato Nº 051/ANA/2012) Brasília: Banco Mundial.
  • Matheny, K. (2020, May 22). Sanford Dam also failed, state confirms; GOP calls for AG Dana Nessel’s recusal. Detroit Free Press Retrieved in 2020, August 5, from https://www.freep.com/story/news/local/michigan/2020/05/22/sanford-dam-michigan-flooding/5245255002/
    » https://www.freep.com/story/news/local/michigan/2020/05/22/sanford-dam-michigan-flooding/5245255002/
  • Meio Norte. (2020, Mar 25). Parte de barragem se rompe deixando feridos e carros soterrados no PI. Meio Norte Retrieved in 2020, June 11, from https://www.meionorte.com/noticias/parte-de-barragem-se-rompe-deixando-feridos-e-carros-soterrados-no-pi-384935
    » https://www.meionorte.com/noticias/parte-de-barragem-se-rompe-deixando-feridos-e-carros-soterrados-no-pi-384935
  • Melo, J. F. (2015). Simplified “Dam-Break” flood modeling In 2nd International Dam World Conference (pp. 47-56). Lisboa, Portugal: LNEC.
  • Melo, J. F., Araújo, L., Oliveira, M., Martins, T., Pinto, M., & Freitas, P. (2015). Hazard Potential Classification of Dams Using a Simplified Methodology In 2nd International Dam World Conference (pp. 599-608). Lisboa, Portugal: LNEC.
  • Rocha, F. F. (2015). Retroanálise da Ruptura da Barragem São Francisco - Miraí, Minas Gerais, Brasil 200 f. (Dissertation). Escola de Engenharia, Universidade Federal de Minas Gerais, Belo Horizonte.
  • Sampaio, J. A. L. (2016). As deficiências do Plano de Ação Emergencial das Barragens no Brasil. Revista de Engenharia Civil IMED, 12(2), 7-17.
  • Souza, D. H. C. (2016). Análise probabilística e de sensibilidade dos parâmetros de um estudo de rompimento hipotético: barragem de terra 91 f. (Dissertation). Faculdade de Engenharia Civil, Arquitetura e Urbanismo, Universidade Estadual de Campinas, Campinas.
  • Teixeira, E. D., Smiderle, C. S. D., Goldenfum, J. A., & Ferla, R. (2016). Avaliação de métodos de propagação de hidrograma proveniente de ruptura hipotética de barragens: Estudo de caso em um trecho de rio. In 21st Seminário Nacional de Grandes Barragens (SNGB)
  • Tschiedel, A. D. F., & Paiva, R. C. D. D. (2018). Uncertainty assessment in hydrodynamic modeling of floods generated by dam break. Revista Brasileira de Recursos Hídricos, 23, 1-17. http://dx.doi.org/10.1590/2318-0331.231820170074
    » http://dx.doi.org/10.1590/2318-0331.231820170074
  • U.S. Army Corps of Engineers – USACE. (1995). HEC-RAS, River Analysis System. Hydraulic Reference Manual. Version 1 Davis, CA: Engineering Center.
  • U.S. Army Corps of Engineers – USACE. (2014). Using HEC-RAS for Dam-Break Studies Davis, CA: Engineering Center.
  • U.S. Army Corps of Engineers – USACE. (2016). HEC-RAS: River Analysis System. 2D Modelling User's Manual Davis, CA: USACE.
  • Von Thun, J. L., & Gillette, D. R. (1990). Guidance on breach parameters. Internal Memorandum, U.S. Dept. of the Interior, Bureau of Reclamation, Denver, 17.
  • Wahl, T. L. (2004). Uncertainty of predictions of embankment dam breach parameters. Journal of Hydraulic Engineering, 130(5), 389-397. http://dx.doi.org/10.1061/(ASCE)0733-9429(2004)130:5(389)
    » http://dx.doi.org/10.1061/(ASCE)0733-9429(2004)130:5(389)
  • Wahl, T. L. (2010 June-July). Dam breach modeling - An overview of analysis methods In 2nd Joint Federal Interagency Conference, Las Vegas.
  • Washington State Department of Ecology (2007). Dam safety guidelines: Technical note 1 - Dam break inundation analysis and downstream hazard classification Olympia, Washington: Department of Ecology.
  • Webby, M. G. (1996). Discussion of ‘Peak outflow from breached embankment dam’ by D. C. Froehlich. J. Water Resources Planning and Management, 4(316), 316-317. http://dx.doi.org/10.1061/(ASCE)0733-9496(1996)122:4(316).
  • Wetmore, J., & Fread, D. L. (1981). The NWS Simplified “Dam-Break” Flood Forecasting Model (24 p.). Silver Spring, Maryland: National Weather Service, Office of Hydrology.
  • Zhang, L. M., Xu, Y., & Jia, J. S. (2007 October 18-19). Analysis of earth dam failures: A database approach In 1st International Symposium on Geotechnical Safety & Risk China: Tongji University.

Edited by

Editor Chefe: Adilson Pinheiro
Editor Associado: Iran Eduardo Lima Neto

Publication Dates

  • Publication in this collection
    05 Feb 2021
  • Date of issue
    2021

History

  • Received
    16 Apr 2020
  • Reviewed
    01 Oct 2020
  • Accepted
    09 Nov 2020
Associação Brasileira de Recursos Hídricos Av. Bento Gonçalves, 9500, CEP: 91501-970, Tel: (51) 3493 2233, Fax: (51) 3308 6652 - Porto Alegre - RS - Brazil
E-mail: rbrh@abrh.org.br